12/7/2015 Paul Rubinov PRR Mar 2006 1 Production Readiness Review  Welcome!  Our motto: When you earnestly believe you can compensate for lack of talent.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
U.B. Presentation October Bernard COURTY L.P.C.C. College de France - Paris.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Mark Raymond /12/051 Trip-t & TFB Trip-t schematics signals and registers operation SiPM connection TFB block diagram functionality.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
Two-stage amplifier status test buffer – to be replaced with IRSX i signal recent / final (hopefully) design uses load resistor and voltage gain stage.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Trip-t testing progress report
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
WBS 1.2.8: AFE II Status and Plans Alan Bross for the DZero Central Fiber Tracker Group DZero Run IIb Detector Upgrade Director’s Review July 15, 2004.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
13Apr05 Directors Review Apr ’05 Status of the AFEII(-t) AFEII proto testing AFEII (-t or final) design Paul Rubinov and Stefano Rapisarda.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
LKr status R. Fantechi.
AFE II Status First board under test!!.
Status of n-XYTER read-out chain at GSI
Presentation transcript:

12/7/2015 Paul Rubinov PRR Mar Production Readiness Review  Welcome!  Our motto: When you earnestly believe you can compensate for lack of talent by doubling your efforts, there’s not end to what you can’t do!

12/7/2015 Paul Rubinov PRR Mar Outline  Answer charge #4  Answer #3 but not in the way you may have hoped  Answer charge #2  Address #5  Answer #6  Get your advice on #1

12/7/2015 Paul Rubinov PRR Mar PRR history (spare)  A brief history of the AFE/TriP  The AFE was designed by John Anderson around the SIFT and SVX ASICs.  John was busy with other designs, so it fell to some of the rest of us to make sure this stuff worked.  See our motto  We got very nervous about making the SVX/SIFT work, especially at 132ns

12/7/2015 Paul Rubinov PRR Mar PRR history  A brief history of the AFE/TriP  Abder was asked to design a new chip that would work at 132ns  Marvin proposed the basic idea based on lessons learned from SIFT/SVX MCM: 1. Keep the ASIC as simple as possible: use commercial ADCs, FPGAs, etc. The ASIC would have only what it must: front end Q amp, pipeline and discriminators. 2. Don’t try to pass fC level signals between different chip.

12/7/2015 Paul Rubinov PRR Mar PRR history (spare)  Abder designed the Trigger and Pipeline chip by 3/2002!  We worked on designing a replacement MCM for existing boards, so we could avoid making new boards, but it became clear that new boards would be simpler/safer/cheaper  The 1 st AFEII TDR is from June 2002  Dzero lost interest because 132ns went away and John came back and made the AFE work (and GG and JW and MM and others)

12/7/2015 Paul Rubinov PRR Mar PRR history  We (Juan and Bruce and I) kept pluging away at this because the TriP chip looked very nice in testing. We also had strong support from Marvin.  Our proposal for AFEII was opposed on 2 main grounds. 1. AFEIs work ok 2. We needed “crisp” physics case to get support from the collaboration/lab/DOE

12/7/2015 Paul Rubinov PRR Mar PRR History  Therefore we worked to understand AFE1 problems as best we could. We identified 4 main issues: (D0 note 4500) 1. SVX saturation – this is a killer but requires very detailed understanding of the detector and MC. Not easy to see at low lumi with the real detector 2. Tick to tick variation – very easy to see, but not lumi dependent.

12/7/2015 Paul Rubinov PRR Mar PRR History  We identified 4 main issues (cont.): 3. Discriminator to analog crosstalk – severe and getting worse. Well demonstrated and understood. 4. Channel to channel variation – same order as tick to tick variation.

12/7/2015 Paul Rubinov PRR Mar PRR History 2. Tick to tick variation – very easy to see, 1pe=10 adc counts

12/7/2015 Paul Rubinov PRR Mar PRR History 3. Discriminator to analog crosstalk – severe and getting worse

12/7/2015 Paul Rubinov PRR Mar AFEII fix by design  “Fix by design” means  Understand the problem  Avoid the situation causing the problem 1. SVX saturation is caused by resetting the SVX only in the gaps (because reset is slow). Ask Abder to design a chip with a very fast (but gentle) reset. So reset every xing (at 132 ns!)

12/7/2015 Paul Rubinov PRR Mar AFEII fix by design (cont) 2. Tick to tick variation is caused by resetting only once per gap. Killed to birds with one stone by resetting every xing! 3. Discriminator to analog crosstalk. This is caused by discriminators firing while small charges are being integrated by the SVX (we can even tell which discr steps on which analog line by looking at the layout!). We fix this by NOT firing discriminator drivers during the active gate.

12/7/2015 Paul Rubinov PRR Mar AFEII fix by design (cont) 4. Channel to channel variation is caused by using only one digital threshold for 64 (128) imperfectly matched analog channels. Our solution is to digitize everything and process every channel individually- every channel has its own pedestal and its own threshold. So analog mismatch can not cause pedestal or threshold mismatch.

12/7/2015 Paul Rubinov PRR Mar Will the AFEIIt fix the AFE1 problems? Q: Will the AFEIIt address the problems seen on AFE1? A:Yes! By design!  The question is what NEW problems the AFEII has and how we solve them.  Will the AFEII degrade any aspect of current detector performance?

12/7/2015 Paul Rubinov PRR Mar AFE1 non-problems  AFE1’s are very reliable.  AFE1’s (currently, at 40Mhz) read out with a very low BER.  Both “grey cable” and LVDS links  AFE1’s have a stable calibration for all aspects –cryo, bias, threshold, peds.

12/7/2015 Paul Rubinov PRR Mar AFEIIt vs AFE1  Due to shutdown schedule we will not be able to do thorough testing of AFEIIt with beam before going into production.  GG actually pointed this out to director when the shutdown schedule was discussed  Our solution:  Test as much as possible with beam.  Test as much as possible without beam on the platform.  Don’t install a particular flavor of AFEIIt boards in quantity until we know it works.

12/7/2015 Paul Rubinov PRR Mar AFEIIt vs AFE1  Strategy to make sure we do no harm: 1. Get an AFEIIt into CFT stereo slot on platform before shutdown because this requires the least infrastructure and CFT stereo is very well understood. 2. Instrument CFT stereo first. Leverage that experience to understand CFT axial performance. 3. Leverage platform experience and the 4CC cryostat to understand PS performance. Bottom line: don’t install boards until sure they are not WORSE than AFE1s they replace.

12/7/2015 Paul Rubinov PRR Mar AFEIIt vs AFE1  Strategy to make sure we do no harm: Requires that we be able to operate almost any mixture of AFE1s and AFEIIt’s in the same crate/sequencer, side by side, face to face.  This is what we call “plug compatible” and this was a design requirement.  Same data format as AFE1, but not necessarily the same download. They are very different boards! “Best is the enemy of good”

12/7/2015 Paul Rubinov PRR Mar AFEIIt vs AFE1 A: We have a solid strategy which we are following to make sure that the AFEIIt will not degrade any aspect of the current detector performance. But this requires that we be able to operate a mixed system of AFEIIt and AFE1 in a transparent fashion. (except for downloads!)

12/7/2015 Paul Rubinov PRR Mar AFEIIt + AFE1 = ♥ 7 Feb 06 AFEIIt # 6, prototype, inserted into stereo slot 2B0. Data taken: store 4631, runs (during run timing was being adjusted). About 7 % of events have readout errors. 17 Feb 06 AFEIIt # 6, with new terminations, inserted into stereo slot 2B0. No readout errors. Data taken: store 4653, runs (solenoid and toroid off during run ) store 4654, runs , SMT Sequencer off store 4658, runs Feb 06 AFEII #12, pre-production, inserted into 2B0 Data taken: store 4664, 36x20 (pbars lost in transfer), runs

12/7/2015 Paul Rubinov PRR Mar AFEIIt + AFE1 = ♥  The 1 st run with AFEIIt on platform revealed a readout problem we had not detected before!  No errors bench testing with SaSeq  No errors in Phase V  No errors in CTS with Seq  No errors on platform during calibration or LED injection  Data dependent errors with beam!

12/7/2015 Paul Rubinov PRR Mar AFEIIt readout errors  Readout errors ~7% in SOME slots on the platform and only with DATA (not even LEDs)  Required a lot of work to understand  But we do understand!  We can cause errors without beam by special “random” firmware  Cross talk in grey cable – can fix by adding series resistors.  But adding series resistors reduces voltage swing very close to the minimum!

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “knee” This is AFE 1c!

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “cross talk in the middle of VSVX” This is AFEIIt

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “cross talk in the middle of VSVX” This is AFE 1c!

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “knee” This is #12 in 12B0

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “knee” This is AFE 1c!

12/7/2015 Paul Rubinov PRR Mar Problem understanding  I think we have an ok model that reproduces the salient features  Problems are caused by: cable, sharing grounds, RC termination

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “knee”

12/7/2015 Paul Rubinov PRR Mar Problem understanding  The “baseline shift”

12/7/2015 Paul Rubinov PRR Mar Problem fixes  Remove the RC termination on the SEQ!

12/7/2015 Paul Rubinov PRR Mar Problem fixes  The “baseline shift” is virtually solved

12/7/2015 Paul Rubinov PRR Mar Problem fixes  The “knee” is much improved

12/7/2015 Paul Rubinov PRR Mar New idea 12ma -240mV

12/7/2015 Paul Rubinov PRR Mar Put in the “pull down bias”  Very small layout change 2.Change from ABT to ACT  Just BOM, no effort, small cost  Gives larger driver (closer to “rails”) 3.Optimize seq timing  Plug in delay 4.Reprogram seq to fix cross talk  This allows async running Final Fix

12/7/2015 Paul Rubinov PRR Mar Final Fix No errors report in AFEIIt preproduction boards since the “Final Fix” AFEII in 5A0,2,4,6 20 March 06 Pre-production boards inserted in 9A 9A #12 #14 #18 #20 (afe ) AFEII in 9A0,2,4,6 16 March 06 Pre-production boards inserted in 9A 9A #12 #14 #18 #20 (afe ) AFEII in 4B0-4B7, 10 March 06 Pre-production boards inserted in 4B0-4B7 4B #20 #13 #18 #19 #12 #11 #14 #15 (afe ) No readout errors, however 4B2 disabled during tests because of problems with board #18 AFEII in 12B0, 12A4, 11B6, 2A4, 2A0, 12A0 March

12/7/2015 Paul Rubinov PRR Mar Readout on the platform  Confident that this is DONE  But took a lot of time Q: What about other aspects of the boards? Will they operate as smoothly, reliably and safely as the current boards?

12/7/2015 Paul Rubinov PRR Mar Other aspects of AFEIIt  Required for CFT stereo:  Good signal to noise  Downloads/Calibration  Bias  Cryo

12/7/2015 Paul Rubinov PRR Mar LED Spectra: AFE1 AFEII 2006Mar21

12/7/2015 Paul Rubinov PRR Mar LED Spectra: AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar Pedestals, triggering on all crossings AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar Pedestals, triggering on clock tick 63 AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar LEDs on, rms of pulse height vs VLPC pixel# AFEII #12 in 5A0 AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar LEDs on, rms of pulse height distribution vs VLPC pixel # AFEII #14 in 5A2 AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar LEDs on, rms of pulse height distribution vs VLPC pixel # AFEII #18 in 5A4 AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar LEDs on, rms of pulse height distribution vs VLPC pixel # AFEII #20 in 5A6 AFE1 AFEII

12/7/2015 Paul Rubinov PRR Mar Peds rms, 5A0,triggering on all crossings or triggering on clock tick 63 AFEII AFE1

12/7/2015 Paul Rubinov PRR Mar Peds rms, 5A2, triggering on all crossings or triggering on clock tick 63 AFEII AFE1

12/7/2015 Paul Rubinov PRR Mar Other aspects of AFEIIt  Required for CFT stereo:  Good signal to noise You bet! And the mapping is correct- same as AFE1  Downloads/Calibration  Bias  Cryo

12/7/2015 Paul Rubinov PRR Mar Platform test of AFEIIt  Elog entry

12/7/2015 Paul Rubinov PRR Mar Platform test of AFEIIt

12/7/2015 Paul Rubinov PRR Mar CFT gui  CFT gui works with AFEIIt, but needs to be made faster if we have many boards

12/7/2015 Paul Rubinov PRR Mar Other aspects of AFEIIt  Required for CFT stereo:  Good signal to noise You bet!  Downloads/Calibration Done! (JW and DS)  Bias Seems fine. No calibration required for AFEIIt preprod boards.  Cryo

12/7/2015 Paul Rubinov PRR Mar Cryo control works ~75 counts/ohm ~40 counts peak to peak noise

12/7/2015 Paul Rubinov PRR Mar Other aspects of AFEIIt  Required for CFT stereo:  Good signal to noise You bet!  Downloads/Calibration Done! (JW and DS)  Bias Seems fine. No calibration required for AFEIIt preprod boards.  Cryo Seems fine also. (SG and RA)

12/7/2015 Paul Rubinov PRR Mar Reliability  Only time will tell, but…  Pick very good vendors for PCB and assembly  Vendors (and we) got plenty of practice with these boards: prototype AFEII (not t!) designed by JA prototype AFEIIt preprod AFEIIt

12/7/2015 Paul Rubinov PRR Mar Reliability  Of the 16 preproduction boards:  9/10 boards delivered first had 0 problems  1 board had a solder splash between pins on a TriP-t -> cleared it up, board ok.  Of those 10, 1 failed in service. Was found to be a loose solder joint. Now fixed.

12/7/2015 Paul Rubinov PRR Mar Reliability  Of the 16 preproduction boards:  Of the last 6, 2 had one bad via each  1 board had two reversed LEDs installed; this same board had a cold solder joint on an FPGA.  1 board will not program - JTAG not working - investigating.  That's 6 out of 16 with problems. 4 in assembly, 2 in pcb mfg. We think these last boards were reworked by hand.

12/7/2015 Paul Rubinov PRR Mar Safety AFEIIt draws a LOT less power than AFE1 (at least the way we operate it right now) Voltage Current Required per board Current per backplane (estimated) Current available from PS per backplane Power dissipation per AFE II board (rounded up) +5 Volts1.7 Amps14 Amps40 Amp10 Watts +5.5 Volts1.0 Amps8 Amps20 Amps 6 Watts ±12 Volts0.5 Amps4 Amps6 Amps 6 Watts +3.3 Volts2.5 Amps20 Amps40 Amps 9 Watts Total 31 Watts (~ 45W/ AFE1)

12/7/2015 Paul Rubinov PRR Mar So its perfect? Well, no, I never said that. But: no green wires on the preprod boards, only stuffing/DNI errors We should not be afraid to make the changes we think will add value!

12/7/2015 Paul Rubinov PRR Mar Not so perfect DNI mistakes – both LH/RH. 1.R358 not stuffed. Should be 0 ohms. 2.TS4 (PIC ISP header) not stuffed. Should be stuffed. 3.X1 socket installed. Should be soldered directly in to the board to avoid height clearance problems. 4.R97 resistor (part of the voltage watchdog divider for +5.5V) should be changed from 5.23K to 5.49K to allow better margins with the platform supplies (upper reset at 6.15V) DNI mistakes – LH/RH specific. DO NOT INSTALL ON RH BOARDS: 1.R339,D31,R338,D30. These are the LH bayonet ok LEDs 2.U172, U173, U174, TS19, R345, C133, R343, C1152. These are the LH JTAG components. They should not be stuffed on RH boards. 3.Fuse sockets for F1 to F5 since these are for LH boards.

12/7/2015 Paul Rubinov PRR Mar Changes from pre production to production 1.Add the -12V pulldowns  Done: 8x R0805 1Kohm 2.Move up the “shield plate” to remove the small ridge under the backing bar  Done 3.Space out the 7-seg display holders a little  Done 4.Add protection resistors to PCF8574  Not done

12/7/2015 Paul Rubinov PRR Mar PCF8574 can get -12V if… Shorting risk

12/7/2015 Paul Rubinov PRR Mar V pulldowns

12/7/2015 Paul Rubinov PRR Mar V pulldowns

12/7/2015 Paul Rubinov PRR Mar V pulldowns

12/7/2015 Paul Rubinov PRR Mar V pulldowns

12/7/2015 Paul Rubinov PRR Mar seg LED

12/7/2015 Paul Rubinov PRR Mar Shield bar