Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, 2001 1 Correlator.

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
David Hawkins Exascale Signal Processing for Millimeter-Wavelength Radio Interferometers David Hawkins
All things DBE… Francois Kapp Sub-system Manager: DBE On behalf of the DBE team present and past... S Rajan, E Bauermeister, A.
Implement a 2x2 MIMO OFDM-based channel measurement system (no data yet) at 2.4 GHz Perform baseband processing and digital up and down conversion on Nallatech.
Digital Baseband Converter Ying Xiang Xiuzhong Zhang Shanghai Astronomical Observatory China.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
STARLight PDR 3 Oct ‘01H.1 Miller STARLight Sensor Signal Processing Ryan Miller STARLight Electrical Engineer (734)
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
The ALMA Correlator Gianni Comoretto, J.C. Webber, A. Baudry, C.M. Broadwell, R. P. Escoffier, J.H. Greenberg, R.R. Treacy, P. Cais, B Quertier, P. Camino,
Transition Converter " Supply signals from new antennas to old correlator. " Will be discarded or abandoned in place when old correlator is turned off.
Programmer’s Guide to the EVLA Correlator B. Carlson EVLA Correlator S/W F2F Apr. 3-4, 2006.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
Backend electronics for radioastronomy G. Comoretto.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Cross Correlators & New Correlators Michael P. Rupen NRAO/Socorro.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
Digital Filters Mike Davis. Requirements Avoid non-linearity up to and through the analog to digital (A/D) converter Use enough bits to adequately represent.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Technology and Functionality of the EVLA Correlator (Next Corr Workshop, June 27, 2006)
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
1 Advanced ATNF Correlators Dick Ferris AT Electronics Development Group May 2003.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
EVLA Correlator Prototype and OTS Testing B. Carlson EVLA Correlator S/W F2F Apr 3-4, 2006.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
The Correlators ( Spectrometers ) Mopra Induction - May 2005.
Student: Vikas Agarwal Guide: Prof H S Jamadagni
Tenth Synthesis Imaging Summer School UNM, June 13-20, 2006 Cross Correlators Walter Brisken.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
New Technologies for Future VLBI Correlators B. Carlson High Res. Astronomy, June 8-12, 2003 Socorro NM.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen.
1 Advanced ATNF Correlators Dick Ferris AT Electronics Group.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
Possible Instrumentation Development Items for SKA at ASIAA Chau-Ching Chiong (ASIAA) and Yuh-Jing Hwang, Homin Jiang, Chao-Te Li.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
FP7 Uniboard project Digital Receiver G. Comoretto, A. Russo, G. Tuccari, A Baudry, P. Camino, B. Quertier Dwingeloo, February 27, 2009.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Digital Down Converter (DDC)
Mark 5 / VLBA Correlator Topics
Signal Processing for Aperture Arrays
EVLA Availability - or - When Can I Use It?
EVLA Advisory Committee Meeting System Status
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
Terry Cotter LO/IF Group Leader
The performance requirements for DSP applications continue to grow and the traditional solutions do not adequately address this new challenge Paradigm.
Prototype Correlator Testing
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Outline Requirements Architecture Technology Software Budget Schedule Installation

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Requirements 16 GHz bandwidth (8 x 2 GHz bands). 16,384 spectral channels/baseline (wideband), 0.25 million (narrower w/recirculation). 16 independently tunable digital sub-bands/baseband + N.B. radar filter. Flexible: tradeoff B.W. for freq. channels. 2 banks of 1000 phase bins/baseline. High performance, flexible dumping. Very long baseline capable (>10k km baselines). 1/16th sample digital delay tracking. Baseband and sub-band multi-beaming…on the same data. Simultaneous 1 GHz B.W. phased output on multiple sub-arrays.

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Requirements

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture FIR filter banks followed by complex XF correlator: –“Stitch” sub-bands together after correlation to yield wideband cross-corr. –Use small LO offsets in antenna to keep fringe rotators “wet”: fringe stopping, anti- aliasing, artifact decorrelation, digital sub-sample delay tracking, VLBI. –Each poly-phase FIR independently programmable for flexibility…scientific req’t. Three main modules: –Station Board (2 x 2 GHz). –Baseline Board (64 baselines ea). –Phasing Board (48 stations, 2 sub-bands, 5 sub-arrays). Plus some 4 small interconnect modules…expandable, flexible.

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Architecture Future upgrade possibilities: –“maxed-out” on bandwidth. –replace Baseline Board with “Moore” lags…(more channels and/or more bandwidth in bandwidth/number of antennas tradeoff.) –keep existing software and hardware infrastructure…painless upgrade.

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Technology 256 MHz system clock rate: –FPGA and gate array tech. supports this. –Development tools (Mentor/Cadence) well-equipped for this speed/complexity. –Can de-scope to 128 MHz on PCB (with 256 MHz interconnects) if absolutely necessary. FIR filter: –Prototype in FPGA (power, $$). Convert to 0.18  m gate array (AMIS). Should be able to get 1024 taps. ($200k NRE, $50 ea, 10k qty). Claim that they use 1/5th the number of gates for same function as Xilinx tap power estimate: 20 nW/MHz/gate * 300k gates * 256 MHz * 1.0 (switching fraction) = 1.5W

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Technology Correlator chip: –Original plan: develop full-custom 0.18  m standard cell from scratch ($900k NRE + $700k production). –Current plan: prototype with scaled-down (fewer lags) FPGA, convert to gate array or standard cell afterwards. Pushes back technology freeze to latest possible date to take advantage of improvements… Power: 20 nW/MHz/gate * 0.5 million (hi-speed switching) gates * 256 MHz * 0.75 transition fraction = 1.9W (2.5W with 1.0 transition fraction)

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Software Use hierarchical approach (mirrors AMCS): –1 SCC and 1 BCC (perhaps one platform). –Use NRAO MIBs on boards. Backend software/configs…

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Software

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Software

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Software

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Budget Could shave ~$1.3 million off this budget with cheaper cables and AMIS gate array for FIR (& corr chip).

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Schedule

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Installation

Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Summary Wideband, high-performance, flexible. Expandable, re-configurable. Painless upgrade path. (0  10k+ km baselines). $10 - $12 million (32 stations; another ~$6 million for 48 stations). Start installation ~2006. First “beta” science ~2007. Completion