Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Space Jam Conceptual Design Review Ben Azlein, Bridget Chase, Paul Guerrie, Taylor King, Shane Meikle, Megan Scheele, Jamie Usherwood 09/16/10 Fall.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Team Delta Special Recon Ops Launch Readiness Review Taylor Boe Andrew Gilbert Bobby Stillwell Emily Howard Grace Harsha Andrew Buckner November 11, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Team Dionysus Critical Design Review Alijah Smith, Chris Koncilja, Elise Kowalski, Josh Tiras, Mike Beach, Becca Seigel 10/06/09.
Team R3D3 Conceptual Design Review Henk Wolda Kate Kennedy Greg McQuie Nicole Ela Marisa Antuna Devon Campbell Tyler Smith 9/20/2011.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team SST Conceptual Design Review Eric James, Vlad Soukhovei, John Marcantonio, Kara Bongiovanni, Sean Rivera 09/16/10.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Oddballs Critical Design Review Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend 10/18/07.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Team Ramrod Critical Design Review Dan Armel, Michaela Cui, Andrew Grimaldi, Kyle Kemble, Silvia Peckham, Chris Sawyer, & Kelsey Whitesell 2007 October.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Team Magnaritaville Final Presentation Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya December 1, 2009.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Skillz That Killz Critical Design Review Jocelyn Mulkey, Jess Davidoff, Kaitlyn Zimmitti, Taylor Smith, Travis Dowdy, Hunter Hoopes October 8, 2009.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
Team SST Critical Design Review
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team SCREAM Launch Readiness Review
Panoramic Rays Critical Design Review
Presentation transcript:

Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009

Mission Overview  The twofold purpose of this BalloonSat mission will be to show that the Earth's magnetic field varies and to show that magnetometers can be used to determine the attitude of a BalloonSat.

Mission Overview Continued Hypothesis – Fluctuation in the Earth’s magnetic field – Finding a vector which will facilitate in determining in which direction the camera is pointed Satellite attitude To better understand the magnetic field

Requirements Flow Down – Objective One Goal (G1) – The BalloonSat CATEOS will ascend to an altitude of 30km to measure the Earth’s magnetic field vector in order to determine the strength of the Earth’s magnetic field as it varies with altitude and determine where the on-board camera is pointed. Objective 1 (O1) – Build a BalloonSat that will ascend from the ground to 30 km with the equipment necessary to support the scientific mission. Objective requirements: o The 16 cm cube BalloonSat structure will be constructed to include a flight computer, power system, camera, and heater. System Requirements: o Foam Core Structure o AVR microcontroller o Power system o Camera o Heater

Requirements Flow Down – Objective 2 Objective 2 (O2) – Measure the strength of the Earth’s magnetic field as it varies with altitude and analyze the data to determine any trends in the field. Objective requirements: o A magnetic field sensor, connected to the flight computer with an analog proto board, will output the measured strength of the Earth’s magnetic field within a range of ±3.2 gauss (±3.2 x tesla). System Requirements: o The magnetic field sensors must be placed in a position that will allow it to accurately and predictably measure the strength of the Earth’s magnetic field, as well as in a position that will allow for easy correlation to the direction of the camera. The sensors must receive an input of 5V DC to operate and be connected to flash memory that will store its analog data output.

Requirements Flow Down – Objective 3 Objective 3 (O3) – Use the vector output of the sensors to determine the orientation of the BalloonSat which will be used to determine the direction that the camera is pointed when each picture is taken. Objective requirements: o Each picture will be coded with a time stamp and number that will be used to correlate each picture with the magnetic field vector at that point, making it possible to determine the direction in which the picture was taken. System requirements: o Write a program that the AVR controller will execute during flight that will correspond each picture to a magnetic field measurement. o The magnetic field sensor will record data on the same timer as the camera. When the camera is instructed to take a picture, the magnetic sensor will also record the current vector.

Design

Functional Block Diagram

Monetary Budget ComponentPurchase LocationQuantityUnit Cost Magnetic Field Sensor Vernier Software and Technology2$58.00 Analog Proto Board Connector Vernier Software and Technology2$10.00 Shipping Vernier Software and Technology2$15.64 Flight BatteriesProvided4 Foam CoreProvided3 Temperature CableProvided1 AVR Microcontroller BoardProvided1 SwitchesProvided2 HeaterProvided1 Aluminum TapeProvided1 Adhesive (Hot Glue Sticks)Provided10Provided Additional MaterialsLocal Stores ~ $16.36 Total Cost $183.64

Mass Budget ComponentPurchase Location Item Code Quantit y Single Item Mass (grams)Sum (grams) Magnetic Field Sensor* Vernier Software and TechnologyMG-BTA Analog Proto Board Connector* Vernier Software and TechnologyBTA-ELV Camera with Batteries*Provided HOBOProvided 130 AVR Microcontroller Board, Heater, Power Connectors, and Switches*Provided V Batteries*Provided Washers*Provided Paper Clips*Provided American FlagProvided 111 Foam Core StructureProvided 1563 cm Tape, Glue, etc.Provided as needed6.2 (remaining weight)6.2 Total 850 *all weights measured for our actual components

Schedule:  9/22 - Conceptual Design Review (CoDR)  9/25 - Design Complete  9/27 - Program AVR (Microcontroller, Camera, and Heater)  9/29 - Hardware Ordering and Authority to proceed (ATP)  10/6 - Design Document revision A/B  10/8 - Critical Design Review (CDR)  10/9 - Acquire hardware  10/9 - External structure complete  10/11 - Drop test, Stair Test, Whip Test.  10/12 - Magnetometer testing (Faraday cage determination)  10/16 - External testing complete (whip test, drop test, and stair test)  10/16 - Internal component assembly complete  10/18 – Cold test, functional test, and data test  10/25 - Internal testing complete (cold test, functional test, and data test)  10/26 - Final assembly complete  10/27 - Pre-launch inspection  10/29 - Mission simulation  11/3 - Launch readiness review and design document revision C  11/6 - Final weigh-in and turn in  11/7 - Launch 6:50 am. ("Bad" weather launch days: 11/8 or 11/14)  12/1 - Final presentation  12/5 - ITLL deign expo (from 9:00 - 4:00)  12/5 - Design document revision D due  *Team meeting will be every Sunday and during the week as needed.

Proposal Requirements RequirementCompliance ScienceMeasuring Earth’s magnetic field with respect to altitude changes Analog sensor inputs cannot exceed 5vProvided sensors and magnetometers use 5V DC Ready to fly again after flight Structure will be tested thoroughly in order to ensure the ability to fly again after flight Secure, non-metal flight string tube A paper clip will be used to secure the tube, as well as hot glue if needed Internal temperature must remain above -10 degrees Celsius A heater system will maintain the temperature of the internal structure Total weight cannot exceed 850gMass of payload has been budgeted and is within the requirements Acquire ascent and descent rates of flight The design will be constructed to withstand the changes in pressure and high speeds during ascent and descent Design shall allow for a 30g HOBOProvided, set-up, and accounted for in mass and design External Temperature CableProvided AVR Microcontroller Board and Batteries – 150gProvided, set-up, and accounted for in mass and design Heater - 100gProvided, set-up, and accounted for in mass and design Canon Digital Camera - 220gProvided, to be set-up, and accounted for in mass and design Foam CoreProvided and is being used for the external structure Allowance for spare parts on budget and parts listSome money has been allotted within the budget for spare parts U.S. Flag and Contact info on outsideProvided and will be attached on external structure Keep documents and design in metricDesign and documents are consistently kept in metric units Launch on November 7, 2009 The team has created a schedule which accommodates for launch date on 11/7 No one shall get hurt Team shall use goggles, gloves, and other safety gear when necessary Return hardware to program in working order Hardware will be securely placed inside the structure to ensure that it returns in working order All parts paid by Chris Koehler and receipts provided Order forms are completed, orders have been made, receipts have been sent Turn in receipts within 60 daysAdditional receipts will be sent when purchases are made Have fun and be creative Team Magnaritaville is having fun and being creative with its satellite, Cheeseburger at the Edge of Space No living things on payloadNo living things are being used in the experiment, or in the payload Complete final report with bonus videoThe team plans to make a video and complete report on time

Test Plan  Structural Testing Drop test, Whip test, Stair test, and the Kick test Complete on 10/11 – at latest by 10/16  Magnetometer Testing Connect magnetometers to AVR and measure in different positions Test the effect or interference of electronics in the presence of the Magnetometers Complete by 10/12  Internal Testing Cold test, functional test (flight duration), structural security Complete on 10/18 – at latest by 10/25

Expected Results - We expect to see the magnetic field decrease as 1/(R), where R = the radius of the Earth. - We expect these results because we are traveling away from the source of the magnetic field, the Earth. - Using a single magnetometer we expect to determine the direction of each photograph.

Potential Problems  Magnetic field may fluctuate due to the composition of the Earth’s crust.  May also fluctuate based on the solar cycle.

Team Organization

Biggest Worries  Coordinating the acquired data with the time  Finding the magnetic strength with two magnetometers  Constructing a Faraday Cage and determining if needed  Mass

Questions?