Dr Tony Price-Ford, Andrew Nixon, Stuart Hill, Dr Spyros Manolopolous, Prof. Stuart Green, and Prof. David Parker oPAC International Conference, Seville.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Detector Characterisation Group
December 10, 2008 TJRParticle Refrigerator1 The Particle Refrigerator Tom Roberts Muons, Inc. A promising approach to using frictional cooling for reducing.
Beam Therapy Equipment 2 Linear Accelerator Head.
The best collimator configuration (material, number of collimators, collimator shape) is determined by minimizing the ratio R, where N ae is the number.
Experience, Expertise and a Commitment to Excellence™
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Alexandr Drozhdin March 16, 2005 MI-10 Injection.
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Clinical Neutron Therapy Center Donna Kubik Spring, 2005.
Tissue inhomogeneities in Monte Carlo treatment planning for proton therapy L. Beaulieu 1, M. Bazalova 2,3, C. Furstoss 4, F. Verhaegen 2,5 (1) Centre.
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
Beam Therapy Equipment 3 Patient Treatment and Accessories.
COMPUTED TOMOGRAPHY I – RAD 365 CT - Scan
Chapter 8 Ion Implantation Instructor: Prof. Masoud Agah
ECE/ChE 4752: Microelectronics Processing Laboratory
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
FACET II Project – User Area Christine Clarke 26 th June 2015.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
DDEP 2012 | C. Bisch – Study of beta shape spectra 1 Study of the shape of  spectra Development of a Si spectrometer for measurement of  spectra 
CT Instrumentation and X-ray system
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
Magnet Design & Construction for EMMA
Multi-colour sctintillator-based ion beam profiler James Green, Oliver Ettlinger, David Neely (CLF / STFC) 2 nd Ion diagnostic workshop June 7-8 th.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Crystal collimation for LHC Valery Biryukov IHEP Protvino Vincenzo Guidi Ferrara University and INFN Walter Scandale CERN CERN, Geneva, 24 April 2003.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Improvement of the Monte Carlo Simulation Efficiency of a Proton Therapy Treatment Head Based on Proton Tracking Analysis and Geometry Simplifications.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
00 Cooler CSB Direct or Extra Photons in d+d  0 Andrew Bacher for the CSB Cooler Collaboration ECT Trento, June 2005.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Non Double-Layer Regime: a new laser driven ion acceleration mechanism toward TeV 1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Implementation of a New Monte Carlo Simulation Tool for the Development of a Proton Therapy Beam Line and Verification of the related Dose Distributions.
Recent development of the Supersonic Gas-Jet Beam profile monitor
Beam Profile Monitor for Spot-Scanning System Yoshimasa YUASA.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Dae-Hyun Kim Dept. of Biomedical Engineering The Catholic University of Korea Department of Biomedical Engineering Research Institute.
CHANNELING 2014 COMPTE-RENDU R.CHEHAB R.Chehab/Channeling20141.
Se Byeong Lee, Ph.D Chief Medical Physicist Proton Therapy Center in NCC, Korea.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
Treatment Machines for External Beam Radiotherapy
Beam dynamics and linac optics studies for medical proton accelerators
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
Halo Collimation of Protons and Heavy Ions in SIS-100.
3/15/2011Nigel Watson / NA62 Meeting. History Radial Ridge Cyclotron – since 2004 Scanditronix MC40 variable energy cyclotron maximum energies 40 MeV.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Collimation Concept for Beam Halo Losses in SIS 100
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
MeV Ion Microbeams and Radiation Biology at the University of Surrey
Cross-section Measurements of (n,xn) Threshold Reactions
Resident Physics Lectures
Longitudinal Effects in Space Charge Dominated Cooled Bunched Beams
Beam-Based Alignment Results
Resident Physics Lectures
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Summary & Concluding remarks
Physics Design on Injector I
Computed Tomography (C.T)
Presentation transcript:

Dr Tony Price-Ford, Andrew Nixon, Stuart Hill, Dr Spyros Manolopolous, Prof. Stuart Green, and Prof. David Parker oPAC International Conference, Seville 07/10/2015 Developments and Optimisation of the University of Birmingham Cyclotron

Scanditronix MC40 Cyclotron The Scanditronix MC40 was brought at auction from the Veterans Affairs Medical Centre, Minneapolis in 2002 and following transfer and commissioning has been operational since 2004 Capable of accelerating beams of: Protons (3-38 MeV) Deuterons ( MeV) Helium-3 (9-53 MeV) Helium-4 (11-37 MeV) Currents of fA to μ A are possible 07/10/2015 oPAC International Conference, Seville, Spain,

Past and Current Uses Isotope production Thin layer activation studies Creation of PEPT tracers (F-18Water & Solid beads) Radiobiology Rb-81 production for medical purposes Accelerated radiation damage tests for LHC Metallurgy Nuclear Physics Development & testing of novel proton CT device 07/10/2015 oPAC International Conference, Seville, Spain,

Typical day on the cyclotron Two shifts Sun-Monday 13:00-21:00 Monday-Friday 6:00-13:00 Between 6:00-9:00 every morning PEPT isotopes are created for the PEPT group to allow industrial developments After 16:00 every evening Rb-81 is produced for medical purposes. This has a half life of 4.6 hours and decays to Kr-81m gas. This is collected each evening and distributed to NHS centres around the country for imaging lung functionality Between these times the cyclotron is available for research purposes. To maximise the impact of this research this window must be optimally utilised 07/10/2015 oPAC International Conference, Seville, Spain,

Beam Setup and QA RF tuned for appropriate frequency. Currents in main coils, 8 concentric trim coils and 4 sets of harmonic centring coils adjusted to optimise internal beam Beam extracted by adjusting deflector voltage Cyclic process until stable coherent beam is found on FC outside the cyclotron Switching magnet then used to direct beam down one of 12 beam lines This process usually takes ~30 minutes. Rest of the talk will focus on developments made to the research beam line to reduce setup and QA times where possible 07/10/2015 oPAC International Conference, Seville, Spain,

Beam Flattening Relatively quick & simple to achieve a small (1-2cm) diameter uniform beam For anything much larger than this the beam is defocused using two sets of Quadrupole magnets Achieving a large (5 cm) uniform beam in this way can be challenging and time consuming Typically 45 mins of optimising would yield a beam with ±20% dose uniformity Dose distribution collected on EBT3 GaFChromic film for a defocued 36 MeV beam 07/10/2015 oPAC International Conference, Seville, Spain,

Beam Flattening System A beam flattening system has been developed in conjunction with Stuart Hill (Masters student with Open University) Aims of the flattening system were to: Achieve a 5 cm beam uniform to greater than 90% Reduce the beam energy of the 36 MeV beam by < 1 MeV Reduce the setup time Make the beam more reproducible day-to-day Decided to use a single scattering system with a large throw distance to minimise material budget in the beam Following preliminary measurements Ta chosen as the thin scattering foil as gave the largest angle per energy loss 07/10/2015 oPAC International Conference, Seville, Spain,

Beam Flattening System Plunger to allow complete removal of system from beam when not required Double collimator system to ensure parallel beam BNC connectors to measure current to scattering foil and collimators 80 μ m Ta foil to scatter beam fixed to final collimator 3500mm to nozzle 300mm from Quads 300mm separation 07/10/2015 oPAC International Conference, Seville, Spain,

The scattering foil for both energy beams yields a 5 cm beam which is uniform to > 90% over whole area. The time to setup this beam is significantly reduced (now 15 mins not 45 mins) due to optimising and then scattering a small beam. Beam Flattening System 29 MeV Beam36 MeV beam Certainly reproducible! But need to understand why we see same pattern all the time even when we change the energy of the beam. 07/10/2015 oPAC International Conference, Seville, Spain,

Collimation System Previously on this beam line the options were a 10, 20, or 50 mm diameter beam To change between these required the breaking of the vacuum and a complete change of nozzle. Work with Andrew Nixon (Clinical Scientist at QEHB and Masters student) led to the development of a new nozzle which better mimics a clinical environment and allows for the rapid change of collimators. 07/10/2015 oPAC International Conference, Seville, Spain,

Collimation System Wide range of collimators available, any shape can be cut 07/10/2015 oPAC International Conference, Seville, Spain,

Collimation System 07/10/2015 oPAC International Conference, Seville, Spain,

Measuring the beam energy To ensure a clean, coherent beam is extracted which has not scattered down the beam pipe or interacted with anything left in the beam pipe from previous experiments a Bragg Peak is reconstructed Various known thicknesses of Perspex are inserted between two ionisation chambers (Transmission Chamber upstream and Markus Chamber downstream) and the ratio of charge collected calculated As the proton slows the signal collected in the Markus Chamber increases relative to the Transmission Chamber and the Bragg Peak is mapped out Conventional method required the opening of a large mechanical door and breaking of interlocks to change the Perspex. A typical Bragg Peak took 75+ minutes to measure An example BP where a small collimator had been left upstream from previous experiments 07/10/2015 oPAC International Conference, Seville, Spain,

Automated PeakFinder Using an old Scanditronix RFA-300 controller we can now use a 1D scanner to change the Perspex thickness A graduated piece of Perspex with 100 μ m steps around the Bragg Peak Still uses transmission and Markus chambers so read out systems unchanged Major time now is collecting data not setting up! 07/10/2015 oPAC International Conference, Seville, Spain,

Automated PeakFinder 36 MeV uses a 4 mm block of Perspex to get additional range Measurements with automated arm took just 26 minutes and the interlock was broken just once during the 29 MeV data taking to add a 50 μ m Perspex shim to improve resolution of Bragg Peak Excellent agreement of 29 MeV methods shows density of Perspex is the same and we can still use all current MC simulations! 07/10/2015 oPAC International Conference, Seville, Spain,

Alignment Tool 07/10/2015 oPAC International Conference, Seville, Spain, A lot of time is currently spent aligning different apparatus to the beam New collimator insert is a self contained laser pointer Project small laser point which coincides exactly with the centre of the beam Will make alignment much faster and easier!

New Table Metamorphasis 07/10/2015 oPAC International Conference, Seville, Spain,

Future Ideas – Spot Scanning! 2D contoller 2D Wellhofer Headscanner Kindly donated by Dundee Hospital 07/10/2015 oPAC International Conference, Seville, Spain,

Conclusions MC40 Cyclotron is extremely flexible and has a varied workload. Research time is limited to ~7 hours in the day We have developed the research beam line to be more user friendly and faster to set up to optimise the use of this time Beam flattening 45 mins  15 mins Energy Measurement 75 mins  26 mins Changing of collimators 30 mins  1 min (every change) Alignment Tool mins  10 mins Total saving of mins + every collimator change Leads to 35+% more useable time in a day!! Future plans to develop spot scanning as well as scattered beam are very interesting! 07/10/2015 oPAC International Conference, Seville, Spain,

Acknowledgments 07/10/2015 oPAC International Conference, Seville, Spain, Would like to thank the organisers for assistance with attending the conference. This work was supported by the Wellcome Trust translational grant (PRaVDA). Supported by the H2020 project AIDA-2020, GA no

Thank you for listening! Any Questions? 07/10/2015 oPAC International Conference, Seville, Spain,

Dr Price-Ford with assistance from Sandcross Primary School, Surrey 07/10/2015 Children In Space – What does the future hold for young scientists in the 21 st Century?