Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.

Slides:



Advertisements
Similar presentations
Compliance Dates The final rule was published on January 25, 1995,
Advertisements

New Source Review (NSR) Program Basics
Richard (Rick) Goertz, P. E
RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing.
Key Features of the Clean Water Act (CWA) Goal: The elimination of all discharges of pollutants into the navigable waters of the United States: § 101(a)(1).
MSW LANDFILL MACT STANDARD DEVELOPMENT SWANA’s 22nd Annual Landfill Gas Symposium March 22-25, 1999 Michele Laur Emission Standards Division US Environmental.
Modeling Guidance and Examples for Commonly Asked Questions (Part II) Reece Parker and Justin Cherry, P.E. Air Permits Division Texas Commission on Environmental.
TCEQ Air Permits Division Justin Cherry, P.E. Ahmed Omar Stephen F. Austin State University February 28, 2013.
Overview of the Clean Air Act and the Proposed Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards Public Outreach.
New Source Review in the SCAQMD November 2, 2005 Judy B. Yorke Yorke Engineering, LLC x25
Matthew Kovar Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Best available control technology (BACT) requirements
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
1 Control Techniques Guidelines Joel Leon September 16, 2011.
1 CE Air Pollution Control Regulations and Philosophies Jeff Kuo, Ph.D., P.E.
The world’s leading sustainability consultancy Generic Front Cover What’s this layout for? This is the generic slide front cover, but you can also make.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
American Public Power Association Washington, DC April 27, 2010 Leslie Sue Ritts, RITTS LAW GROUP, PLLC 1.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Implications of the 2008 Ozone Standard Changes Deanna L. Duram, P.E., C.M. August 7, 2008 trinityconsultants.com.
Proposed Rulemaking 25 Pa. Code Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review John Slade, Chief Division of Permits Bureau.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Flexible Air Permitting Innovation Done Right State-EPA Innovations Symposium Denver, CO January 24, 2006.
John A. Paul RAPCA. Background  Supreme Court Decision  Endangerment Finding  Johnson Memorandum  Light Duty Vehicle GHG Emissions Rule  Tailoring.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
GHG BACT Developments Justin Fickas Clay Raasch. Overview ˃ Since January 2011, Greenhouse Gases (GHGs) have been evaluated under Prevention of Significant.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
HAP Rule 372 Guidance Permitting Division Maricopa County Air Quality Department.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
Overview of Air Permitting Fees In Illinois
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
REGULATIONS & LEGISLATION BIG TEN ENVIRONMENTAL STEWARDSHIP GROUP STEVE MARUSZEWSKI – PENN STATE Greenhouse Gases.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Blue Skies Delaware; Clean Air for Life 10/8/08 Minor New Source Review Alberto Roybal.
Emissions Banking and Trading (EBT) Overview/Update Melissa Ruano Air Quality Division Texas Commission on Environmental Quality Advanced Air Permitting.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Modeling, Impacts, and Effects Review Dom Ruggeri, P.E., Manager Technical Program Support Section TCEQ, Air Permits Division Austin, Texas September.
Air Quality Technical Advisory Committee Meeting September 27, 2006 Virendra Trivedi Chief, New Source Review/Title V Section Division of Permits Bureau.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Stephen F. Austin State University February 27, 2014 Justin Cherry, P.E. Reece Parker TCEQ Air Permits Division.
Air Quality Division Emissions Inventories SAW: May 3, 2016 Page 1 Point Source Emissions Inventories Air Quality Division Susan Wampler May 3,
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
Kevin McLeod & Chris Horton OCE, Region 12 Houston 1.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Concepts and Practical Application
New Source As defined in the CAA, construction of a new source, or modification of an existing source, that will produce a significant increase in emissions.
Flexible Air Permitting
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
North Carolina Division of Air Quality Mike Abraczinskas
Clean Air Act (CAA) Purpose
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
Boiler Sheltered Initiative
Best Available Control Technology for Greenhouse Gas Emissions Sources
Presentation transcript:

Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015

Things to Remember Facilities may be subject to different requirements EPA & TCEQ regulations are updated at different times Applicant must demonstrate meeting the most current regulations

Legislative & Regulatory Basis Texas Health & Safety Code Clean Air Act 1990 Texas Administrative Code, Title 30 Code of Federal Regulations, Title 40

What is BACT ? (State) 30 TAC TAC 116: Best available control technology Best available control technology with consideration given to the technical practicability and the economic reasonableness of reducing or eliminating emissions from a facility.

What is BACT ? (Federal) 40 CFR §51.165(xl) 40 CFR §51.165(xl) (summarized): An emissions limitation based on the reduction of each potentially emitted pollutant from any proposed major stationary source or major modification, which TCEQ determines is achievable after considering several factors.

When is a BACT review required ? Initial Permit Amendments

Evaluation Methods Three-Tiered Approach (TCEQ)Top-Down Method (EPA) Three Tiered Approach (TCEQ) Top- Down Method (EPA)

Tier I Emission reduction performance levels accepted as BACT in recent permit reviews Same process and/or industry Consider new technical developments

Tier I Example Tier II ExampleTier III Example Ethylene Oxide (EtO) Sterilization Units (MACT 40 CFR 63, Subpart O) Source Type: Sterilizer Pollutant: EtO Minimum Acceptable Control: 99.0% reduction Details: Typically wet scrubber, catalytic oxidizer, or condenser

Tier II Tier I Different process or industry Consideration of controls accepted as BACT in recent permits for similar air emission streams Detailed technical analysis may be required

Tier II Example Tier I ExampleTier II ExampleTier III Example Company A: 35 TPY SO 2 Tier I BACT - Caustic scrubber Company B: 40 TPY SO 2 Tier I BACT – Unestablished

Tier III Tier I Tier II Use only if nothing available at Tier I or Tier II Highly complex and quantitative Numerous assumptions required for completion Time and resource intensive

Tier III – More Information Tier I Tier II Identify all emission reduction options Eliminate technically infeasible options Rank by total emissions reduced Determine cost effectiveness ($/ton)

Tier III-Question When do you conduct a Tier III review? Only if Tiers I and II fail to identify an emission control option.

Three-Tiered Approach = Top-Down Recently issued/approved Texas permits Recently issued/approved permits in other states Control technologies contained within EPA’s RBLC

Top-Down Method Identify all control options Eliminate technically infeasible options Identify all control options Eliminate technically infeasible options

Reduction Strategy Options Pollution Prevention Equipment Specification & Monitoring Add-on Abatement Good Engineering Practice (GEP) Best Management Practice (BMP)

Top-Down Method Identify all control options Eliminate technically infeasible options Rank remaining control options Identify all control options Eliminate technically infeasible options Rank remaining control options

Performance Elements Capture Efficiency Reduction Efficiency/Resulting Emissions Reliability On-Stream Time Enforceability

Top-Down Method Identify all control options Eliminate technically infeasible options Rank remaining control options Eliminate options on collateral impacts Select BACT Identify all control options Eliminate technically infeasible options Rank remaining control options Eliminate options on collateral impacts Select BACT

Tier III Example Tier I ExampleTier II ExampleTier III Example Company C: Tier I and Tier II reviews completed New process, unique stream-Tier III review Tier I review complete Tier II review complete New process, unique stream- Tier III review

How to Improve BACT Review Sufficiently justify control option eliminations Identify recent control options Fully document and elaborate costs Provide sufficient justification when differentiating emission rates for similar facilities Provide documentation related to performance elements

What is LAER ? Generally considered to be the most stringent level of control required under the Clean Air Act

Why Conduct LAER ? You’re proposing new construction or major modification to existing sources in an area already out of compliance with federal standards.

Federal BACT v. LAER (Pollutants) Analysis/RuleApplicable Pollutants BACTEach regulated NSR pollutant LAERCriteria pollutants (or precursors where applicable) for which the area is designated nonattainment

Federal BACT v. LAER (Applicable Sources) Analysis/RuleApplicable Sources BACTAny proposed major stationary source or major modification emitting a regulated air pollutant LAERMajor source or major modification in a nonattainment area

Federal BACT v. LAER (Requirements) Analysis/RuleRequirement BACTEmissions limit considering technical practicability and economic reasonableness LAER1)Emissions limitation contained in the SIP 2)Most stringent limitation achieved in practice

Federal BACT v. LAER Question Can you consider economic reasonableness in the evaluation of LAER? No. LAER does not provide for a consideration of economic reasonableness.

How do you determine LAER ? Check the RBLCRBLC Check all state SIPs

LAER Question Are there other places you can check for LAER determination? Yes. Recently issued/approved Texas permits Recently issued/approved permits in other states.

LAER Example You did it! You conducted your nonattainment review analysis!

LAER Example continued Puerto Rico Business

LAER Example Conclusion Do you consider the Puerto Rico control technique in your analysis? Yes. U.S. territories are also considered.

Questions? Thank you! Air Permits Division (512)