ERP Status Overview Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health
Overview Number of approved ERPs Number of installed systems
C&T Inspection Procedures PIL being drafted Compliance with ERPCompliance with ERP PPL P09-V-01PPL P09-V-01 Qs & AsQs & As System components Part 23 approvedSystem components Part 23 approved Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surfaceVerify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface
C&T Inspection Procedures Responsible person on surface to monitor location of miners underground ( )Responsible person on surface to monitor location of miners underground ( ) Two way communication inside RA ( )Two way communication inside RA ( ) Identifying number on miner’s brass tag worn on belt matches identifying number in system ( )Identifying number on miner’s brass tag worn on belt matches identifying number in system ( ) Minimum safe distance to prevent interference with blasting circuits ( (a))Minimum safe distance to prevent interference with blasting circuits ( (a)) C&T systems shall remain operational during fan stoppages or a mine power outage (75.313) C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)
Overview - Consolidate Q&A documents for next round of ERPs
QUESTIONS?