Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.

Slides:



Advertisements
Similar presentations
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Alice overview New detector and chamber ALICE TC.
Compressor status AWAKE Technical Board meeting 19 August 2015.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
The integration of 420 m detectors into the LHC
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum System P. Chiggiato TE-VSC
“CENTRAL SUPPORT FRAME” -
L. Gentini, A. Bertarelli, F. Carra
STRAW TRACKER SYSTEM CAD STATUS :
Ultra-vacuum components and systems
Alignment of VSC components along LSS 1&5
HIE-ISOLDE HEBT vacuum system
Installation of an Instrument on a CERN machine
Preliminary Y-chamber specifications – First draft
LHC Experimental Vacuum Systems Status October ‘07
Long Shutdown for the LHC: Vacuum Beam Pipes
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
TAS at IP1 Present situation and plans
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Integration issues at IHEP
The 11T cryo-assembly: summary of design and integration aspects
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
XFEL Collimation and Beam Switchyard Vacuum Issues
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
LARP Phase II Secondary Collimator RC-1
Presentation transcript:

Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC

Technology Department IntroductionFeasibility - IntegrationProduction planningInstallation planningConclusion

Technology Department Current situation 4L2, part of VACSEC A4L2.C Insertion of a TCTVA Arc 1-2 IP2: ALICE Introduction Collimator areaID800 area

Technology Department Current layout 4L2, part of VACSEC A4L2.C Insertion of a TCTVA Constraint:  acceptable is 1360 mm maximum 2.Collimators should move along their 5 th axis Arc 1-2 IP2: ALICE Introduction

Technology Department Current layout 4R2, part of VACSEC A4R2.C Arc 2-3 IP2: ALICE Introduction

Technology Department Collimator area on 4L2 side, identical on 4R2 side (outer) new issue to solve: supports collision Feasibility - Integration New TCTVA New module New chamber Arc 1-2 IP2: ALICE

Technology Department ID800 area on 4L2 side, identical on 4R2 side Feasibility - Integration Arc 1-2IP2: ALICE

Technology Department Vacuum elements necessary for inserting the new TCTVA:  4 modules and 2 chambers. Most of the components is available from the stock which needs to be completed. Time necessary to produce these elements (from the drawings to the reception):  3 months. Collimator area Production Planning

Technology Department Fabrication of 2 new VCDG_ vacuum chamber and consolidation of spare elements: Time necessary to produce these elements (from the drawings to the reception):  4.5 months (the design office and the workshop should be informed 3 months in advance).  Processes: LHC database modification Design Office Mechanical machining 3 thermal treatments Degreasing before firing Final cleaning Leak detection Metrology Internal transports Validation test  Material: 4 flanges Ø m tubes ID800 6 Helicoflex ® gaskets 4 DN150 CF 4 supports for 2 tubes Production Planning ID800 area

Technology Department Steps necessary for the installation for one sector :  Venting of the vacuum sector,  Displacement of the moving elements (TCTH, modules, VCTY_, VCTCR, VCDGA + supports),  Installation of the old support to the new location + installation of new supports (new modules),  Installation of the new modules + new VCDG_ chamber,  Survey of the moved and installed elements,  Closing of the sector,  Pumping and leak detection of the sector,  Bakeout installation,  Bakeout and NEG activation,  Bakeout desinstallation and cleaning of the area Time and TE-VSC team necessary to ensure the work (on one side):  1.5 months with 3 people (helped punctually by a transport team). Another team will pull the cables for controlling the new vacuum pumps + pumps and instrumentation moving (done in parallel). Installation Planning Collimator and ID800 area on one side

Technology Department Conclusion The new vacuum layout ensures the ZDC movement (1360 mm down to the IP). The new vacuum layout and special fabricated components allow the 2 collimators 5 th axis motion. Integration Collimators area: 3 months. ID800 area: 4.5 months. Production Planning 1.5 months for vacuum sector A4L2.C. 1.5 months for vacuum sector A4R2.C. Installation Planning

Technology Department SPARE SLIDES

Technology Department 4L2, database configuration, B1 (external beam line): Current database Modified database New vacuum elements Feasibility

Technology Department 4L2, database configuration, B2 (internal beam line): Current database Modified database New vacuum element Feasibility

Technology Department C urrent situation of 4L2 and 4R2 concerning the TCTH collimator bakeout NO JACKET REMARK #1

Technology Department 4L2 and 4R2 are symmetric for the integration but… The mechanical aperture is different between 4L2 and 4R2 around Y chambers: REMARK #2.1 VMGAB VCTNP Apertures are 80 to 80mm Apertures are 65 to 80 mm VTCYD chamberVTCYB chamber B1 B2 4L2 4R2 IP2

Technology Department 4L2 and 4R2 are symmetric for the integration but… The mechanical aperture is different between 4L2 and 4R2 around BPMs: REMARK #2.2 Apertures are 80 to 80 mm Apertures are 80 to 63 mm 4L2 4R2 VAMTK B1 VAMTJ BPMWITCTHBPMWB IP2 TCTH B2

Technology Department How does a vacuum module (VM) looks like internally:

Technology Department Creation of new vacuum elements for 4L2: VMTBA: Collimator Module - DN100/QCF /80  aperture is 80 mm, L=220 mm, the bellow connected on the collimator side accepts the 5 th axis motion. VMTQC: Collimator Pumping Module - DN100/QCF /80  aperture is 80 mm, L=460 mm, the bellow connected on the collimator side accepts the 5 th axis motion. VCRLP: Vacuum - Chamber - Circular - Long Straight Section - ID67 - OD70- Type LP - QCF100/QCF100  aperture is 67 mm, L=3800 mm. Integration issues: The connections of QCF100 (DN100 conical flanges) require space for a MKT collar: Ø is 230 and thickness is 35 mm. The thickness of the bakeout (PI thin layer) envelop for the VCRL% chamber is 5 mm which means a total outer diameter of 70+10=80 mm.

Technology Department Creation of new vacuum elements for 4R2: VMTBB: Collimator Module - QFC100/DN /63R  aperture is 80 to 63 mm, L=220 mm, the bellow connected on the collimator side accepts the 5 th axis motion. VMTQD: Collimator Pumping Module - QFC100/DN /63  aperture is 80 to 63 mm, L=460 mm, the bellow connected on the collimator side accepts the 5 th axis motion. VCRLP: Vacuum - Chamber - Circular - Long Straight Section - ID67?? - OD70?? - Type LP - QCF100/QCF100  aperture is 67 mm??, L=3800 mm, same chamber as 4L2.

Technology Department ID800 area on 4L2 side