March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Sept 25, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range: 14 bit range, 10 bit accuracy ● Summing signals from 6 detectors.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Design studies of a low power serial data link for a possible upgrade of the CMS pixel detector Beat Meier, Paul Scherrer Institut PSI TWEPP 2008.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Calorimeter Digitizer Electronics Cheng-Yi Chi Columbia University Nov 9-10, 2015sPHENIX Cost and Schedule Review1.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
A General Purpose Charge Readout Chip for TPC Applications
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
14-BIT Custom ADC Board JParc-K Collaboration Meeting
VeLo Analog Line Status
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
RPC Front End Electronics
BESIII EMC electronics
RPC Front End Electronics
DCM II DCM function DCM II design ( conceptual ?)
Local Level 1 trigger Hardware and data flow
RPC FEE The discriminator boards TDC boards Cost schedule.
DCM II DCM II system Status Chain test Schedule.
New DCM, FEMDCM DCM jobs DCM upgrade path
RPC Electronics Overall system diagram Current status At detector
sPHENIX DOE-SC CD-1/3a Review WBS 1.5.3: CalElec Digitizers
Digitally subtracted pulse between
TOF & BB FEE Safety Review
PHENIX forward trigger review
Cheng-Yi Chi Nevis Lab Physics Dept Columbia University
Beam Beam electronics Block diagram disc gated disc gate disc gated
TELL1 A common data acquisition board for LHCb
Presentation transcript:

March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain located in the rack. –Cable –Block diagram –Individual components HBD LL1 trigger Outlook

March 9, 2005 HBD CDR Review 2 Charge Preamp with On-Board Cable Driver (IO REVA) Features: 1)+/- 5V power supply. 2)165 mW power dissipation. 3)Bipolar operation (Q_input = +/- ) 4)Differential outputs for driving 100 ohm twisted pair cable. 5)Large output voltage swing -- +/- 1.5V (cable terminated at both ends) (+/- 3V at driver output) 6)Low noise: Q_noise = 345e (C_external = 5pF, shaping =.25us) (Cf = 1pF, Rf = 1meg) 7)Size = 1.04” x 0.775” 10pins 8)Preamp output (internal) will operate +/- 2.5V to handle large pile-up.

March 9, 2005 HBD CDR Review 3 IO REVA

March 9, 2005 HBD CDR Review 4 Test with GEM Detector PA Pulse Trace on Scope   PA Pulse Height Spectrum Pulser Input (1.2pF)~ 13mV  100,000 e-’s  (Baseline Noise) ~1100 e-’s Input capacitance ~ 0.0 pF?? 20 pe x 5E3 (gain) ~ 100,000 electron input into pre-amp Baseline Noise~ 1100e-’s after background is subtracted off. PA Output~48mV B.Azmoun

March 9, 2005 HBD CDR Review 5 S-S+G S- Signal arrangement Use 2MM Hard Metric cable to move signals between preamp/FEM 2mm HM connector has 5 pins per row and 2mm spacing between pins and rows There are two types of cable configuration: *100 ohms parallel shielded cable 50 ohms coaxial cable Our choice is This gives us signal density 2mm x 10mm for every 2 signals. Same type of cables will be used for L1 trigger data.

March 9, 2005 HBD CDR Review 6 HBD FEM 48 channels per FEM –12(11) bits 60MHz sampling per channel. –3 bits LL1 data output per channel 7 individual threshold levels per channel –Optical output to DCM, 6xbeam crossing rate(~60MHz). Use commercial 8b/10b chip (TI) plus optical transceiver –6UX220mm card size Interface module –GTM (clock, L1 trigger etc.), Ethernet interface for slow download. –Control test pulse. 6U x 220 mm card size HBD readout will fit into 3 6U crates HBD LL1 module potentially could fit into one 6U crate.

March 9, 2005 HBD CDR Review 7 Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing /clocks Data path interfaceFEM Optical GTM/Ethernet Detector signals DCM Trigger data FEM Block Diagram FEM Crate Diagram LL1 trigger

March 9, 2005 HBD CDR Review 8 The differential receiver Use Analog Device AD8138 receiver set up as unity gain Total voltage On the cable Total voltage Seen by ADC Simulation result For 16fc input charge ADC +/- inputs ADC has 1V range Max ADC range is about ~10 time of 16fc

March 9, 2005 HBD CDR Review 9 The 8 channel 12 bits 65MHzADC The ADC receives differential signals The V common is 1.5V The +/- input can swing from 1V to 2V + side 2V, - side 1V -> highest count - side 2V, + side 1V -> lowest count Our +/- input will swing from 1.5 to 2V/ 1 to 1.5V we will only get 11 bits out of 12 bits 16fc will be roughly sitting 200 count We will run the ADC at 6X beam crossing clock 6X9.4 MHz = 56.4 MHz or ~17.7ns per samples

March 9, 2005 HBD CDR Review 10 FPGA Receive ADC data, provide L1 delay, Multiple L1 triggered events, format data, generating L1 trigger primitives, transfer L1 trigger data,manage clocks and test pattern etc. 48 channel of serial ADC => 48 *720 Mbits/sec or 34 Gbits/sec need to be received. We choice Altera Stratix II 90nm EP2S pins to received the ADC data.

March 9, 2005 HBD CDR Review 11 current progress on the FEM board Signal Flow Differential receiver ADC EP2S60 FPGA Signal input Majority of boards is set We now try to deal with the power issues +3.3 for ADC +/- 2.5V for receiver FPGA needs +3.3V, +2.5V, +1.2V

March 9, 2005 HBD CDR Review 12 HBD data to DCM 12 samples per channel –Cover 2 beam crossing Assume the optical will run 6X beam crossing rate. –48 channel will take ~16.6 ns*48*12=9.6 microsec. We will merge 4 FEMs’ data into one optical link in un-multiplexed mode

March 9, 2005 HBD CDR Review 13 HBD L1 trigger Each FEM output 3 bits per channel, 7 threshold setting. –Total bandwidth is 3*48 channel*9.6MHz ~1.4 GHz (~1.7 GHz optical bandwidth) Multiplex FEM L1 data into 3 differential pairs + 1 clock pair cable Use 4mm vertical space. The HBD LL1 crate could locate within the HBD FEM rack. Each arm of the HBD has 12 panels. Each panel has 96 channels. Each FEM cover 48 channels. –Each LL1 covers 24 FEM’s data –Generic LL1 has 16 optical inputs The Stratix II EP2S60 chip can receive 8 FEM inputs. 3 chips could cover 24 FEM’s data. We should have enough logic to deal with reasonable trigger algorisms. HBD LL1 decisions will be send to GL1 and LL1 calculation result will be send to DCM.

March 9, 2005 HBD CDR Review 14 Outlook The prototype FEM layout will be done soon. We need to work on the interface board and dataway. –Test can be underway once these boards exist. Need to deal with how to receive optical data in the DCM end. –Probably with a special daughter card