+2.5 V 30 A +5.8 V 3 A -3.6 V 25 A +4 V 100 A +4 V 100 A Controller TGC1 subrack organization +4 V 65 A Controller First 84 HP (19”) subrack Controller:

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Advertisements

1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon.
Locations of Kinematic Mount Struts on Small Wheel MDT Chambers C-end C. H. Daly University of Washington Dept.of Mechanical Engineering 8 March 2007.
Locations of Kinematic Mount Struts on Small Wheel MDT Chambers A-end C. H. Daly University of Washington Dept.of Mechanical Engineering 8 March 2007.
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations.
MDT PS DCS for ATLAS Eleni Mountricha
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
SD-HCAL technological prototype: services Nick Lumb Lyon, 3 February 2011.
Muon works in the next months. MDT Up to May 15 Commissioning of EE From May 15 for (at least) 2 moths DCS works – Installation of new hardware – New.
HP Printer Support Number Dial
BIG DATA Initiative SMART SubstationBig Data Solution.
Visit Us hp-printer-support/ Call Us Toll Free :
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
Photo Album by hp.
RPC Barrel HV & LV system Lappeenranta University
Physics 111 Practice Problem Solutions 05 Force and Motion II – Friction, Circular Motion SJ 8th Ed.: Ch. 5.8, 6.1 – 6.3 Contents: 6-4E, 6-5E*, 6-19P,
Barrel stave allocation on the PP0 exhaust fitting
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
HP Printer Number Call Now :
HP Printer Number Call Here :
HP Printer Support Number Printer issue Call:

BACK SOLUTION:
Contact HP Support to Get Quick Help
Call us HP Support Phone Number.
HP printer support number.
WELCOME HP PRINTER SERVICE NUMBER
HP Printer Technical Support Number
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Orientation of Point in Space
RPC HV&LV status Introduction HV power supply tender
HP Printer Help Number USA To Get Instant Solution of HP Printer Toll Free Number:
RPC Detector Control System
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
HP Support. HP Support Number
Dr. Pierluigi Paolucci - INFN di Napoli
L H C A T L A S International Collaboration on the LHC Project
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
The Big 6 Research Model Step 3: Location and Access
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Overview of KLM Crate Utilization
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
18 - Confined Space Entry
- HP Printer Support Phone Number Dial HP is one of the most reliable brand names, which is known for offering some of the best electronic products, including photocopier, scanner, camcorders and printers. The lines are open 24/7 and exec
HP PrinHP Printer Support Phone Number Dial HP is one of the most reliable brand names, which is known for offering some of the best electronic products, including photocopier, scanner, camcorders and printers. The lines are open 24/7 and
Solution Free Body Diagram.
Presentation transcript:

+2.5 V 30 A +5.8 V 3 A -3.6 V 25 A +4 V 100 A +4 V 100 A Controller TGC1 subrack organization +4 V 65 A Controller First 84 HP (19”) subrack Controller: 15 HP 6 HV distributors (54 chs): 36 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 18 HP 12 x 2 subracks Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (5 chs): 60 HP Free space in subrack: 9 HP 12 x 2 subracks

+5.8 V 3 A -3.6 V 25 A +4 V 100 A Controller +4 V 65 A Controller First 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 28 HP 24 x 2 subracks Second 63 HP subrack Controller: 15 HP 2 LV distributors (3 chs): 30 HP Free space in subrack: 18 HP 24 x 2 subracks TGC2 – TGC3 subrack organization

+4 V 65 A Controller TGC Small Wheel and TGC11 subrack organization First 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 2 LV distributors (3 chs): 30 HP Free space in subrack: 9 HP 1 x 2 subracks +5.8 V 3 A -3.6 V 25 A +4 V 100 A Controller Second 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 24 HP 1 x 2 subracks

+6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A MDT HV and LV subrack organization for Barrel – I solution First 84 HP (19”) subrack Controller: 15 HP 11 HV distributors (99 chs): 66 HP Free space in subrack: 3 HP 14 subracks (BIS.8 -> 1 HV ch) Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 59 subracks Barrel656 – BEE 32 + EIL EEx 60 = 700 Controller

+6 V A +6 V A +6 V A +6 V A Controller Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (24 chs): 60 HP Free space in crate: 9 HP 30 subracks MDT HV and LV subrack organization for Barrel – II solution Controller Barrel656 – BEE 32 + EIL EEx 60 = 700 First 84 HP (19”) subrack Controller: 15 HP 11 HV distributors (99 chs): 66 HP Free space in subrack: 3 HP 14 subracks (BIS.8 -> 1 HV ch)

+6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A MDT HV and LV subrack organization for Small Wheel and BEE- I solution Controller Small Wheel64 + BEE32 + EEL.special 2 = 98 Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 5 x 2 subracks (1 x 2 with 1 ch) First 84 HP (19”) subrack Controller: 15 HP 10 HV distributors (82 chs): 60 HP Free space in subrack: 9 HP 1 x 2 subracks

+6 V A +6 V A +6 V A +6 V A Controller MDT HV and LV subrack organization for Small Wheel and BEE- II solution Controller First 84 HP (19”) subrack Controller: 15 HP 10 HV distributors (82 chs): 60 HP Free space in subrack: 9 HP 1 x 2 subracks Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (24 chs): 60 HP Free space in crate: 9 HP 3 x 2 subracks (1 x 2 with 1 ch) Small Wheel64 + BEE32 + EEL.special 2 = 98

+6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A MDT HV and LV subrack organization for Big Wheel - I solution Controller First 63 HP subrack Controller: 15 HP 5 HV distributors (40 chs): 30 HP Free space in subrack: 18 HP 4 x 2 subracks (one every two octants) Second 84 HP (19”) subrack 10 LV distributors (10 chs): 84 HP 8 x 2 subracks (one every octant)

MDT HV and LV subrack organization for Big Wheel - II solution +6 V A +6 V A Controller 84 HP (19”) subrack Controller: 15 HP 3 HV distributors (20 chs): 18 HP 2 LV distributors (10 chs): 30 HP Free space in subrack: 21 HP 8 x 2 subracks (one each octant) +6 V A +6 V A Controller OR 63 HP subrack Controller: 15 HP 3 HV distributors (20 chs): 18 HP 2 LV distributors (10 chs): 30 HP Free space in subrack: 0 HP 8 x 2 subracks (one each octant)

+6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A +6 V 1 15 A MDT HV and LV subrack organization for EO Wheel - I solution Controller First 63 HP subrack Controller: 15 HP 6 HV distributors (48 chs): 36 HP Free space in subrack: 12 HP 4 x 2 subracks (one every two octants) Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 8 x 2 subracks (one every octant)

MDT HV and LV subrack organization for EO Wheel - II solution +6 V A +6 V A Controller 84 HP (19”) subrack Controller: 15 HP 3 HV distributors (24 chs): 18 HP 2 LV distributors (12 chs): 30 HP Free space in subrack: 21 HP 8 x 2 subracks (one each octant) +6 V A +6 V A Controller 63 HP subrack Controller: 15 HP 3 HV distributors (24 chs): 18 HP 2 LV distributors (12 chs): 30 HP Free space in subrack: 0 HP 8 x 2 subracks (one each octant) OR