Progress Photos March 2007. Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

THORNE GROUP Earthworks : Recycling : Reclamation : Demolition : Dismantling THORESBY LAKE PHASE 1 PRE-SUBSIDENCE WORKS Client: UK COALConsultant: Black.
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Cairo Metro Line3 / Medinah Car Park II
APTA BRT Conference Seattle, Washington WHAT IN THE WORLD? AUSTRALIAN BUS RAPID TRANSIT – THE BRISBANE BUSWAYS Stephen Lucas Immediate Past Chairman Bus.
Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Luas Cross City Main Infrastructure Works April 2015.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Reconstruction of the Eads Bridge Highway Deck
Chilterns Tunnel Vent Shafts
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Innovating in a compact environment
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Unit 1 Types of Construction
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
Highways/BridgesHighways/Bridges American Bar Association Forum on the Construction Industry American Bar Association Forum on the Construction Industry.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
PRESENTER’S NAME DATE Using Smartphone to carry out Risk Assessment HY/2012/07 – Tuen Mun Chek Lap Kok Link – Southern Connection.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
CAISSON FOUNDATION.
Building Plans.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Schematic Design CCCC-FHDI July, 2011 Port Sudan SPC Flyover Engineering Let the world more smoothly.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Joints for Diaphragm Walls
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Locrete Palestine Mr. Fahim Kasis, Managing Director Locrete Industries.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Pedestrian knocked over by fork lift truck What happened: Injured Party was part of a 3 man group walking towards the Admin buildings, shortly after the.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CAISSON FOUNDATION.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) LAGUNA LBNO Hamburg - February 2013 ALAN AULD.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Environmental Assessment
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
CHANNEL DISTRICT ACTION TEAM
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
Minuteman Vocational Technical Regional High School Progress
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Minuteman Vocational Technical Regional High School Progress
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Progress Photos March 2007

Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of construction activities

Construction Progress Rosebank General views of construction site, road diversion and pedestrian footbridge spanning Oxford Road and station site View towards South 16 March 2007 View towards North 16 March 2007 View towards South 16 March 2007

Construction Progress Rosebank Batch Plant 16 March 2007 Wheel Wash Pit 16 March 2007 Site establishment is ongoing

Construction Progress Shaft E5 Looking up from Platform 20 March 2007 Looking down from Platform 20 March 2007 Shaft depth 24 metres at 20 March 2007

Construction Progress Sandton Station Demolition of Old Taxi Rank 20 March 2007 New Taxi Rank 20 March 2007 Taxis were relocated to new rank on 9 March 2007 Official opening took place on 15 March 2007 Demolition of old taxi rank commenced on 12 March 2007

Construction Progress Sandton Station Diaphragm wall construction 4 D-Wall panels concreted on 16 March 2007 Completed Panels 20 March 2007 Cutter Excavation at North Shaft 20 March 2007

Construction Progress Mushroom Farm Park Blast Preparation 19 March 2007 Mucking Out 20 March 2007 Blast Protection Grids 19 March 2007 Shaft depth 15 metres at 20 March 2007

Construction Progress Marlboro Portal Third set of canopy tubes installed Arch ribs visible in preceding sections 29 metres of tunnel excavated by 23 March 2007 View from Portal 20 March 2007 Santa Barbara 20 March 2007

Construction Progress Marlboro Viaducts View towards South showing Marlboro Station site in foreground, Viaducts 1a and 11 in centre and clearing of alignment towards Marlboro Portal behind Piling (4 piles as at 23 March 2007) and foundations in progress View towards South 22 March 2007 Piling at Viaduct March 2007 Foundations V11 and V1a 22 March 2007

Construction Progress Area 2 Marlboro to Depot Section View towards Depot 19 March 2007 View towards East (behind Linbro) 19 March 2007 View from Landfill 19 March 2007 Clearing and grubbing, topsoil stripped, and earthworks in progress from Linbro Junction to Depot

Construction Progress Depot Train Depot Earthworks Platform 20 March 2007 Bus Depot Admin Building 20 March 2007 Bulk earthworks to both Train and Bus Depot areas is complete

Construction Progress Depot Precast Yard Construction of M-Beam casting beds M-Beam Pits 20 March 2007 M-Beam Soffits 20 March 2007 M-Beam Pit Walls 20 March 2007

Construction Progress Viaduct 13 First lift of Pier 8 being backfilled Shutter erected for first lift of Pier 7 on the opposite side of Centenary Way

Construction Progress OR Tambo Station The station concourse shell is being constructed by ACSA above the new elevated drop- off road CJV site establishment at ORT will commence at the end of March Station Concourse Shell 22 March 2007