MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?

Slides:



Advertisements
Similar presentations
Professional Services Overview
Advertisements

Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Transforming Content Archives Into Rich Data/Business Information ALM Media Ellen Siegel VP, Licensing & Business Development.
Sony Pictures Digital Backbone From the lens to the screen.
Procurement Review Recommendations Status and Projects Procurement Benchmarks Advisory Committee July 4, 2013 Randall Meades, Director General Procurement.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
6/2/20151 MARS MARS Management Administrative Reporting System Commonwealth of Kentucky.
© Copyright Lumension Security Lumension Security PatchLink Enterprise Reporting™ 6.4 Overview and What’s New.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Office 365: Efficient Cloud Solutions Wednesday March 12, 9AM Chaz Vossburg / Gabe Laushbaugh.
Power Series: Fulfillment Strategies Dan Kremers 4 Walls Solutions.
© 2009 IBM Corporation Delivering Quality Service with IBM Service Management April 13 th, 2009.
Web Development Process Description
Techlogger: a practical application… Sony Pictures Technologies Jason Brahms 07/19/11.
JDF in the Inter-Enterprise Workflow Achieving JDF workflow automation.
Agenda Teams Responsibilities Timeline Homework and next steps.
Bill Higbee April 12, 2011 Selecting an Enterprise Class Social Media Monitoring Vendor.
My Resource for Excellence. Canadian Heritage Information Network Creation of the Collections Management Software Review (CMSR) Heather Dunn, CHIN.
NON-LINEAR SCHEDULING October 24, Executive Summary – Business Problem The Networks group has experienced significant growth over the past 15 years.
What’s new in Project 2007? Presented by Ira Brown, President & CEO, Project Widgets, Inc.
EMEA Media Centre “Content Lifecycle – a Greenfield approach” 7 September 2011.
Agenda 11:00 am (3D Tech Center, Capra 116) Introduction to 3D at Sony and The Digital Backbone Project Chris Cookson President, Sony Pictures Technologies.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
EMEA Media Center (High Level) Data Flow Study. MDMRights Linear Scheduling and Traffic Identity Management Media CenterBroadcast Facility Non-Linear.
Metadata Strategy Case Study Bill Rosenblatt GiantSteps Media Technology Strategies (212)
FY14 TV PROJECTS VISION VERSION 4 EMEA UPGRADES Date 03/09/2013.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
21 st Century Broadcast Support Enabling Asset Management for the Enterprise Tim Senior 19 March 2009.
Welcome Georgia Infrastructure Transformation 2010 Kick-off Meeting January 30, 2008.
Rights Management and MediaCentre Overview. GPMS for SPTI Launched title system for International TV GPMS for SPTI Launched title system for International.
NON-LINEAR SCHEDULING 23 October Setting the Stage 2 To Launch Stand-Alone Online Service in 2015” – Deadline.com Oct 15, 2014 “This is the most.
EMEA NetOps MediaCentre Project Overview 14 January 2013.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
MediaCentre RFP Where we are, Where we are going.
[IT INFRASTRUCTURE OVERVIEW] Paul Ashurst Executive Director, EIS Global Network Services IT Corporate.
MediaCentre Planning Workshop Monday January 14 th, 2013.
MediaCentre Planning Workshop Wednesday January 16 th, 2013.
Ideal Design- Business Systems Integration Approach for EMEA Media Center (DRAFT) Media Center Broadcast Master GPMS (Global Product Master System) GPMS.
Denes Talosi 20/03/2013.  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes.
MDM IMPLEMENTATION TO REPLACE GPMS TITLE MANAGEMENT October 28, 2013.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
RUNNER April 29, Executive Summary Business Problem: – cineSHARE, ACORN and EAGL are critical components of major digital media workflows supporting.
MISC APPLICATION OVERVIEWS John Doe Executive Vice President Digital Division.
VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.
June 26,  Every SPE LOB has the need for B2C sites to promote titles and services, both domestically and internationally  Many of these sites.
Presentation Preparation Overview The format will be as follows for all of the sessions will be as follows – First third of the slot will be a presentation.
DATA MANAGEMENT CONTENT ORGANIZATION AND MEDIA IDENTIFICATION John Doe Executive Vice President Digital Division.
VISION & CHANDLER MIGRATION 10/03/2013. Executive Summary Last year we requested several critical Vision enhancements immediately post go-live.
Techlogger: a practical application… Sony Pictures Technologies Jason Brahms 08/02/11.
EMEA Media Center (High Level) Data Flow Study. MDMRights Linear Scheduling and Traffic Identity Management Media CenterBroadcast Facility Non-Linear.
MediaCentre Project Transition Planning/Support 18 January 2013.
Budapest Notes Priorities – NL Rights ( – NL Scheduling Action Items – Assess Short term options on Rights Short term – Merge Provys and Vision Schedling.
VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.
Agenda – Madrid 3/25/13 Content Processing Today – Ingest – Content Prep – Delivery Insourcing Plans – Molinare (sp?) Content Identification Business Case.
Digital Production Pipeline
EMEA Media Center Inception Funding 12/17/2012. Problem Statement, Objective and Scope Problem Statement –SPE spends too much on outside vendors to process.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Talent Acquisition, Staffing, Recruitment, Executive Search.
Agenda Leads work – Track Status Admin / Upcoming / Next Steps – RFP Document review – Vendor Question Review – GL Preparation – Orals – Harris.
Systems Analysis and Design in a Changing World, Fifth Edition
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Crackle and Digital Channels OTT Infrastructure
Dev Test on Windows Azure Solution in a Box
General Services Department
CLEARTM Media ERP and Azure
Sony Pictures Digital Backbone
Crackle and Digital Channels OTT Infrastructure
Presentation transcript:

MediaCentre Overview

Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?

The current outsourced model and workflows for content preparation are at design capacity, have limited scalability, are inefficient and error-prone –Materials processing methodology must be restructured to ensure our ability to support current operations as well as grow efficiently and cost effectively –Content preparation must be brought in house and outside vendors eliminated –The disparate workflows in our three sub-regions must be integrated and unified –Result will be higher productivity, better quality, increased throughput, uniform management reporting and performance tracking Virtually all marquis programmers in region now perform content prep in-house Project would commence Q1FY14 and go live Q1FY15 Executive Summary 3

The MediaCentre “Project”

Overall Picture

EMEA MediaCentre The Media Centre is the key to organizing and simplifying the process of content acquisition, preparation, file management, file delivery to playout, and deep archive of assets. Benefits provided: – Better exploitation of program assets across sub-regions/brands – Synergistic workflows – Ability for territory programmers to have visibility of TX assets in other regions – Standardized policies/procedures to maintain corporate compliance – Complete internal control and flexibility of all workflow and decisions – Reduced time to market on new product offerings – Establish “best practices” to improve quality – Eliminate expensive third party vendor media management costs – Channels retain complete control of all creative and editorial functions – Designed to accommodate needs of all current and future linear and VOD – Built-in hooks to link to non-linear / digital platforms content prep infrastructure Functions performed by MC: – Media Asset Management, Transcoding, Deep Archive, Formatting, Proxy Creation, Workflow/Process management, Materials tracking, Creation and delivery of TX-ready materials to playout, Automated Technical QC, Facilities to support editorial QC, Processing of content for non-linear distribution 6

Background - Methodology of Analysis 7 Comprehensive analysis of regional workflow was conducted by hired consultant Recommendations made to attain efficiencies within and between regions RFPs developed and bids were solicited from vendors for two scenarios: Scenario 1 – Construct SPT “Owned and Operated” in-house operation Designed, financed, staffed, and operated internally Central Technical Area to be co-located at London-based data centre and operated remotely from London, Budapest, and Madrid SPT Networks offices RFP sent to 5 systems integrators (SIs) – 5 different MAM applications were vetted 2 SI solutions were short-listed: Television Systems Limited “TSL” (proposing Dalet) Sony Professional Systems, Europe “SPSE” (proposing MBC) The commercial proposals of both are comparable An in-depth comparative analysis has started – Goal for selection: 1 April 2013 Scenario 2 – Utilize Outsourced Managed Service (with a single vendor) SPT defined new expanded workflow and volumes Services provided to Networks for a monthly fee RFP sent to multiple Content Prep Services providers Primary purpose is to “benchmark” pricing against an in-house solution

Implementation Plan Specifics – London London is the primary MC administration point Requires new infrastructure and additional staffing: – MC Central Technical Area to be constructed at London-based Data Centre – Modifications required to SPE IT Network infrastructure to integrate MC – Development required on multiple support systems to tie into MC (e.g., Harris) – London NetOps will require new heads – Transition workload from third-party vendors to in-house ops Anticipated go-live date of Q1, 2014, however schedule still not finalized 8

The RFP Story (MediaCentre Core) … So Far…  March 2012 – TSL consultant provides Workflow and Content Process analysis, content flow numbers, and recommendations.  June 2012 – RFP written and distributed  January 2013 – Involve Procurement, Legal, Risk Management, InfoSec  Jan-Jun 2013 – Validation & Review of Functional Design  Jan-Jun 2013 – Decision Process to select vendor Analysis Mar 2012 RFP Release Jun 2012 Final Decision Process Jan –Jun 2013

Importance of the Worklows The value of the workflows to the effort cannot be understated. The entire RFP and wider effort is based on these. Huge thanks to the entire team for their time, knowledge, and effort to make these comprehensive touchstones.

RFP Overview - 5 Major Areas in the RFP Technical Buildout Technical Buildout Content & Workflow Management System (Workflows) Content & Workflow Management System (Workflows) Regional Requirements Project Management Requirements Project Management Requirements Supporting Information A compilation of specific technical requirements, workflow diagrams, functional specifications, scenario descriptions, planning assumptions, and project guidelines.

Reference & Test Signals Status & Alarm Monitoring Signal Monitoring & Measurement Reference & Test Signals Status & Alarm Monitoring Signal Monitoring & Measurement Technical Buildout – Central Technical Area “Things that bolt into racks and have LED lights” Comms/TalkbackExternalFeedsComms/TalkbackExternalFeedsAutomated QC QCSignalRoutingAutomated SignalRouting Disk & DatatapeStorage With HSM Transcoding Disk & DatatapeStorage With HSM Transcoding Technical Buildout Technical Buildout

Technical Buildout – Key Items 6 New QC/Version Edit RoomsNew Traffic Area for 8 people New Playout Area for 3 people Technical Buildout Technical Buildout

Technical Buildout – Key Items New Storage Infrastructure 180 terabytes of spinning disk storage 2.1 petabytes of datatape storage New data network Approx 1 TB inbound data per day Transfer of 1.25TB of new content to playout per day 365 GB of content to non-linear platforms per day Extensive Transcoding Capabilities Approx 1 TB of transcoded data created per day Technical Buildout Technical Buildout

Technical Buildout – Key Items Existing OAP Edit Suites/Seats Existing Graphic/Audio/VO Rooms Post areas will remain connected to their own dedicated shared storage. The CWM system will connect and help manage the existing post production areas to improve the process workflow. Technical Buildout Technical Buildout

CWM helps manage all aspects of preparing content for air. Content and Workflow Management System Ingest Voiceover QC Playout Distribution Localisation Compliance On-Air Graphics On-Air Graphics Promo Production Content & Workflow Management System “Getting the raw content ready for air” Content & Workflow Management System (Workflows) Content & Workflow Management System (Workflows)

CWM Key features and benefits Automates transcoding to needed formats Central tracking of all assets Common system for all content preparation Automation of file movement Coordination of the QC process Manages ingest of all files from the variety of sources Push to playout systems Direct integration with Vision/BMS/Landmark Content & Workflow Management System Content & Workflow Management System (Workflows) Content & Workflow Management System (Workflows)

Regional Requirements “What happens in Budapest & Madrid” Content preparation for linear & digital would occur at the MediaCentre, as requested by channel office personnel using the CWM Opportunity to share content and resources across the region Standardized workflows in place at channel offices managed by the CWM Regional Requirements

What’s not in the RFP Business Systems / SPE Enterprise Systems Detail GPMSEAGL/DMRCineShareDigital BackboneVisionBroadcast MasterLandmarkCrackleOver The Top MediaCentre (within the RFP) Content Workflow Management Technical Buildout MediaCentre is part of the larger effort toward improvement. Multiple interfaces with existing systems are required but this effort is intentionally not in the RFP. Not In RFP

Contract Rights VOD/OTT Program Scheduling LNL Playout Media Producers External Studio Production Company SPE Other Contract Digital Media Management Ingest Conforming QC Edit Transcode QC Edit Transcode Library Transmission Ready Transmission Ready Transcode Package Transcode Package Finance LNL Business Intelligence Master Data Content Organization Global Rights Key Areas of Focus

Title Organization Today Typical Vision Content Organization

Proposed MediaCentre Content Organization

Integration Exchange Automated Ordering & Inventory Visibility Automated Ordering & Inventory Visibility

MediaCentre Project… The Other Pieces 24 Media Center Broadcast Master GPMS (Global Product Master System) GPMS (Global Product Master System) Vision 3.5 Vision 4.3 CE / Budapest WE / UK Integration Software Spain EAGL Websites Marketing (TBD) Enhancements & Data Conversion Vision 4.3

Networks Integration Landscape

Schedule to Launch Project