Parity Mtg, 7 Dec 2007 Bob Michaels Test Target for PREX and e06007 (tilted) No “active” cooling, conducts to Loop 3.

Slides:



Advertisements
Similar presentations
Robert Michaels PREX at Trento PREX Workshop 09 Physics Interpretation of PREX 208 Pb E = 1 GeV, electrons on lead Elastic Scattering Parity Violating.
Advertisements

Parity Mtg, 18 May 2007 Bob Michaels Lead Target and Warm Septum Interface Performance of Lead Target during e06007 Radiation for PREX, extrapolated from.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : density -dependence of the symmetry energy. Nuclear.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
Run Plan Document E04-007: Threshold Pion Production.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Radiopharmaceutical Production Target Foil Characteristics STOP.
RF Safety Discussion Derun Li/Bob Rimmer Center for Beam Physics Lawrence Berkeley National Laboratory SRF Institute, JLab.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
G2P Target installation and Beyond. Schedule Pivot before.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Hot Surface Igniters. PRESENTED BY: Joe Barker Brent Blume Sam Alauddin.
Noise Analysis for PREx - Pb Radius Experiment Presented by: Luis Mercado UMass - Amherst 6/20/2008.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
Jefferson Lab, Newport News, VA and the Hall A Collaboration E Spokepersons: K. Aniol, A. Saha, J.M. Udías, G. Urciuoli Students:Juan Carlos Cornejo.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Niobium Sputtered Havar Foils for FDG Production R Johnson 1, J Wilson, C Backhouse 2, B Der, C Doerkson and S McQuarrie Edmonton PET Centre, 2 University.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
HAPPEX-III, PVDIS, PREx targets D.S. Armstrong April 17 ‘09 1)Cryotargets – what we requested: new 25 cm racetrack cells – status 2) Solid Targets for.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
1/33CREX Workshop Jefferson Lab March 16-19, 2013 NASA/CXC/SAO.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Pb Electroweak Asymmetry in Elastic Electron-Nucleus Scattering : A measure of the neutron distribution PREX and CREX 48 Ca Neutron Skin Horowitz.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
EPPOG - LHC Machine LHC machine (and some outreach) Mike Lamont.
Beam line Experiment area SC magnet Pion production target
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
PREX Mtg, July 2008R. Michaels, JLAB Warm Septum : Status Septum Team: Kees deJager, Paul Brindza, Javier Gomez, John Lerose, Al Gavalya, & me New Design.
CERN: The ATRAP Experiment. Preview Overview of the ATRAP Experiment  History  Ongoing work  Goals Presentation of my jobs and projects.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Moller SC Magnet Status. Installed Magnet is installed and cooled down EPICS controls tested and working Magnet has been ramped several times in its current.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Hall A Collab. Mtg, 6/ 2010R. Michaels, JLAB Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
(4 areas/website front)
Hybrid Pixel R&D and Interconnect Technologies
Challenges of vacuum chambers with adjustable gap for SC undulators
D. J. Margaziotis HAPPEX Collaboration Meeting
IHEP group Shashlyk activity towards TDR
Raster Update Aug 9, 2016 R. Michaels
Noise Analysis for PREx - Pb Radius Experiment
PREX: Lead / Diamond Target
AIDA 2020 Tel Aviv group.
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
November technical stop activities:
PREX / CREX Collaboration Meeting and Status
ISO view of pipe w/ individual EC detector installed
Beam Halo Considerations for Back Angle Running
Presentation transcript:

Parity Mtg, 7 Dec 2007 Bob Michaels Test Target for PREX and e06007 (tilted) No “active” cooling, conducts to Loop 3

Parity Mtg, 7 Dec 2007 Bob Michaels Lead Target Assembly Ladder Design is in machine shop Fabrication completed Jan 7. Install Pb / diamond sandwiches (~ Jan 10) Belleville washers maintain pressure & contact. Use vacuum grease (except thin lead) Some chance can improve contact with vacuum deposition of C12 and cold welding (Bogdan)

Parity Mtg, 7 Dec 2007 Bob Michaels Pb #4 Ran 2 45 uA Pb #3 Ran 2 55 uA Failed near 85 uA Reminder: History in 2007 (E06007 Lead Targets ) discoloration from beam (rastered) Also : A test in Y2000 of a design closer to the Jan 2008 design : Ran 82 uA, 20 min no failure

Parity Mtg, 7 Dec 2007 Bob Michaels Lead Target Test Plan 1.Center the beam on target. Raster 4 mm. Use a “holey” target in ladder and the tilted targets – which have tighter clearance than our target). 2. VDCs off. Scintillators on. Measure rates in scint. 3.Establish rates up to 0.5 uA Do not exceed 10 Mhz ! See * below 4. Use Lumi as another rate monitor. 5. Protect the HRS detectors (If necessary (*) detune HRS magnets. Leave scintillators on as a relative rate monitor.) * If using E = 2.77 GeV beam, the rates should not be a problem. (continued …)

Parity Mtg, 7 Dec 2007 Bob Michaels Lead Target Test Plan (cont.) 6. Ramp the beam up slowly to 100 uA. 7. Steps of 10 uA, pausing 20 min. each step 8. Monitor the following: Rates in scintillators and Lumi Target temperatures Vacuum pressures Radiation monitors 9. Run at “M” uA for “N” hours. (perhaps M = 100, N = 8 ) (Note, the tilted targets are only rated for ~80 uA. We don’t really want to melt targets. Creates a huge mess.)

Parity Mtg, 7 Dec 2007 Bob Michaels Idea to Improve Contact (Bogdan) Vacuum deposit pure C12 on lead and on diamond. Layer is ~1 um. Press the lead / diamond sandwich under vacuum (``Cold welding’’) No need for vacuum grease. Reliable, 100% contact of lead & diamond. Arun Saha and SRF group may succeed in time, practicing with chemically pure lead and thin carbon foils.