OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.

Slides:



Advertisements
Similar presentations
RavensNest 60 Channel Intelligent Video Solution The RavensNest is an enhanced video command and control platform that transforms any centralized analog.
Advertisements

Prescient II Extinguishing Control Panels
Variable Frequency Drives Bypass Options
Security Systems BU Communication Systems ST/SEU-CO 1 DCN MCCU SD Hardware Multi- Central Control Units MCCU System Hardware Basic PC Multi-
Zone Control Air System Why? 1.Provides room by room comfort control. 2.Reduces equipment run time. 3.Eliminates hot/cold rooms. 4.Works with conventional.
GE job title/1 GE internal information - Not for external distribution 1 GE Security EMEA NPI template – v1 1X Series (phase 1) Conventional Fire Panel.
PYROCON12 De-Ice controller Technician Operation Presentation 2013.
22 March Controller Diagnostics. 22 March Topics Covered: Diagnostics that allows you to check basic controller and reader functionality through.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Register Digital Multimeter Usage Click Register to begin the course.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Medical Gas Alarm Panels
Clean Air Box Usage & Care CABs RAMs CO Monitors.
TECHNICAL TRAINING 2008.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
ZigBee Calvin Choy David Kim Jason Chong Devin Galutira.
ECE 265 – LECTURE 13 Interface to switches and LEDs 7/3/ ECE265.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
WELCOME EVERYBODY!.
PYROCON12 De-Ice controller User Operation Presentation 2013.
battery care  Proteggono le batterie  Ne esaltano le prestazioni  Ne preservano la durata nel tempo I Carica Batterie cambiano filosofia.
S9200U1000 Universal Integrated Furnace Control (UIFC) Training Module
Pump Application Interface. 30 October 2006 Overview Increases the functionality of the soft starter for pumping applications - four additional trip inputs.
New AS-i Profinet Gateway AC1401 and AC1402. Date: October 2010© VNC sr/rk Main features of the Gateway  WEB server for remote configuration and diagnosis.
Office of Emergency Communications Gateway Training Workshop Module Three Hands-on Configuration Incident Commanders Radio Interface (ICR)
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
SB-CMS-PIR - ceiling mounted PIR sensor. Subnet ID and Device ID Device Remark Change the ID if needed.
ZTF Interconnecting Scheme Stephen Kaye
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
POWER PLANT USED IN TELECOM
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
2HONEYWELL - CONFIDENTIAL File Number ACM-24-AT Series A1P1 A1P2 A1P3 A1P4.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
Single Loop Analogue addressable fire control Panel
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Vela NDU EAS Controller BEFORE connecting any hardware, verify that the NDU front power LED indicator is OFF. BEFORE connecting any hardware, verify that.
ECP Extinguishing Control Panel. Extinguishing Control Panel General overview Technical overview.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
Parts of a Computer System
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Oct 29, 2001 Ron Sidwell 1 Purple Card. Oct 29, 2001 Ron Sidwell 2 Purple Card Spec Two channels per printed circuit board Size ~20 sq. in. or best effort,
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Programmable Logic Controller (PLC)
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
User Interface – Switch Panel 6 Gang Switch Panel Configuration guide RS485 Terminal Fixing hole Bayonet Front ViewBack View.
Neptune Power Versions compared 1 All rights reserved © 2003, Neptune Power sub-system Versions 1 and 2 Key features V2 is functionally equivalent to V1.
The world leader in serving science Noran System 7.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
Application & Control method for 62000B Series DC Power Supply.
LV & HV Updates Vasileios Martos. Start / Stop GapsCheck Script Instead of using Browser or the Console Manager to Start/Stop The Script.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Introduction to IP Cameras Over Coax. Replacing Analog Cameras With IP Cameras Over Coax Analog Camera RG59U Coaxial Cable 18/2 Power Cable Low Voltage.
Start of Sales MSI-XXXB Safety Relays Plugable screw or spring-cage terminal blocks.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Redundancy Switching Components
HVI HIPOT TEST SET Pft sERIES.
MONITORING & METERING.
Technician Operation Presentation
Presentation transcript:

OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01

New OD HV Paddle Cards: VME 9U height (14.4") Standard VME C-type front panel and ejector latches for robust and precise mounting High voltage relay instead of jumper for each PMT channel. Front panel DIP switches for manual enable/disable of each channel. LEDs for HV status of each PMT channel on front panel (relay on/off display). Header jack on front panel for relay remote control input. –Remote control system is under development LEMO jack on front panel for each PMT signal –Scope signal available without disconnecting the coax ribbon cable to the QTC.

New OD HV Paddle Cards

Channel circuit changes Old paddle cards New paddle cards

Installation Test installation (Hut 1): 11/21/00 Full installation began: 4/27/01 Completed: 5/2/01

Shift workers’ notes Switches and indicators: –enable/disable channel with DIP switch –LED on = enabled Ribbon cable = HV relay power/control Lemos for scope ports HV in from LeCroy supplies Same cables to QTCs

Procedure for disabling OD channels Procedure for disabling or enabling an OD channel: –DISABLE the selected HV channel using the LeCroy HV controller in the appropriate hut. –Change the setting of the dip switch for desired channel on its paddle card »red LED next to the LEMO jack of each channel shows whether the relay is on or off. Note: The LEDs monitor relay status only, NOT HV status! –RE-ENABLE the selected HV channel. For full details: see ~berns/SUPERK/odhelp.html#paddlecards