NAVFAC MID-ATLANTIC 0318/2009 NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE – FY 2008 ACTUAL COSTS AND FY 2009 EXECUTION PLAN.

Slides:



Advertisements
Similar presentations
Former NAS Moffett Field
Advertisements

Presented by: Ronald O. Nichols LADWP General Manager
BoRit Superfund Site Timeline
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
1 Aggregate Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3,
Orange County Budget Budget Worksession Summary July 18, 2013.
TaskFFA SubtaskDue Date SUPPLEMENTAL INVESTIGATION (OFFSHORE) Submit Draft Report - FFA Date2/2/2012 ENGINEERING ESTIMATE/COST ANALYSIS (EE/CA) (OFFSHORE)
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Financial Rep Meeting July 14, OPENING REMARKS & BUDGET UPDATE RALPH ALVAREZ 2.
1 Association of Defense Communities Conference June 22, 2014 Ms. Laura Duchnak Director, BRAC Program Management Office Naval Facilities Engineering Command.
CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well.
NAVFAC MID-ATLANTIC 11/14/2007 NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE – FY 2007 ACTUAL COSTS AND FY 2008 EXECUTION PLAN.
FIELDWORK AT TEIGNMOUTH, UK Overview of the characteristics of the May 2003 Campaign (Phase II 12/05/03 – 30/05/03)
NAVAL FACILITIES ENGINEERING COMMAND 13 July 2015.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
Naval Facilities Engineering Command Small Business Overview
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Environmental Programs Update SAME Northern Virginia Post Monthly Meeting Rob Sadorra, MBA, M.Eng., P.E. Director, Environmental Restoration Division NAVFAC.
Time Series for the east end of Raccoon Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental.
Navy Munitions Response Program Update NAOC Winter 2013 Meeting Mr. Stephen Hurff, P.E. NAVFAC HQ Munitions Response Program Manager 11/20/2013.
Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 The FY12 Environmental Restoration Program and Draft Restoration.
History and Progress of DEQ’s Mercury Programs Albert E. Hindrichs.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
April 20, 2011 Shoreline Protection Emergency Restoration Plan.
DNAPL Recovery System July 2010 Progress Meeting McCormick & Baxter Superfund Site Portland, Oregon.
Tides & Currents Seminar  These east coast slides may be  Added to or substituted for Slides in the seminar Slide 1.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Waste Program Monitoring Technology Needs and the 21M 2 Effort ETC Brownbag Thursday, May 19, 2005 Daniel Powell, U.S. EPA Office of Superfund Remediation.
Demolition Management and Monitoring Contract Update December 13,
NAVFAC MID-ATLANTIC January 15, 2014 (Revised 3/11/2014) NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE FY 2013 ACTUAL COSTS AND.
Navy EMS Implementation Status September Title/Group/Section,etc. Navy EMS Requirements  Fully conforming EMS by Sept 2009  U.S. (by EO) and.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
1 Venezuela. AECOM VENEZUELA AECOM Venezuela was established since the year 1992, registered under the local environmental authority, traditionally providing.
Challenge Grant Program Water 2025: Preventing Crises and Conflict in the West Eligible applicants are irrigation and/or water districts in the western.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
FY 2015/16 Financial Overview Revenues: Operating revenues for FY 2015/16 are projected to be approximately $116,550 or 1.6% higher than operating revenues.
Western Avenue WQARF Site Western Avenue/Phoenix Goodyear Airport CAG Meeting of August 8, 2013 Delfina Olivarez.
Status of Sediment and Groundwater Remedies. Or… What’s up with that O&F Determination?
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
Haley & Aldrich, Inc. 1 Strategic Data Use from Collection to Collaboration A Sediment Dredging Case Study Presented by: Ryan J. Scott, PE.
Plaistow BOS Meeting 7/24/2017
Environmental Acquisition Strategy Performance-Based Contracting
Environmental Cleanup Program Status
Louisiana’s Coastal Protection and Restoration Update
MOVING FORWARD!!.
Wyckoff/Eagle Harbor Site
Hunting Island State Park Beach Restoration Project
Environmental Cleanup Program Status
Newport County Chamber of Commerce
Project Management – Part II
Environmental Cleanup Program Status
Wurtsmith Restoration Advisory Board Meeting
Oak Ridge Office of Environmental Management Update
Jim Flechtner, PE Executive Director April 26, 2018
Old Colony & Newport Railway
Advanced Environmental Management (AEM) Training Phase I
Objective Provide enough wind generation to supply 15% of Rhode Island’s native demand from wind powered generation in Rhode Island, for Rhode Island consumers.
Planning and Budget Committee
MER and Decommissioning
Est. May 5th 2018.
North Augusta High School – Phase 2A and 2B
Restoration & Monitoring Prioritization Tool
Presentation transcript:

NAVFAC MID-ATLANTIC 0318/2009 NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE – FY 2008 ACTUAL COSTS AND FY 2009 EXECUTION PLAN

2 Naval Station Newport IR Program 03/18/2009 FY08 ACTUAL EXECUTION PROJECT COST REMARKS PWD Newport Support$5,000Non-Constr. Support McAllister Point Landfill – O&M Onshore & Offshore $617,069Annual Cost – Incl. 5-yr Review Stations NUSC – Fieldwork Modifications$88,275Addt’l Field Efforts OFFTA – PRAP & ROD$84,198 OFFTA – Fieldwork Modifications$281,144Addt’l Field Efforts OFFTA – Shoreline Protection$2,365,684Fieldwork – West Side (700 LF) OFFTA – Shoreline Protection$1,506,500Fieldwork – East Side (520 LF) Tank Farm 5 – Demolition of Treatment System & Building $232,763 Derecktor Shipyard – PRAP & ROD$72,934Offshore Sediments Five Year Review$55,315 TOTAL$5,308,882 Color denotes project was moved up from a future fiscal year requirement

3 Naval Station Newport IR Program 03/18/2009 FY08 ACTUAL EXECUTION FY08 ACTUAL $5,308,882 FY 09 PLAN $3,857,150

4 Naval Station Newport IR Program 03/18/2009 FY09 PLANNED EXECUTION PWD Newport SupportAnnual Cost McAllister – O&M Onshore & OffshoreAnnual Cost McAllister – Air ModelTo Support Five-Year Review NUSC – Remedial Investigation/Feasibility Study Pending Completion of Draft RI Phase OFFTA – Shoreline Protection (East Side)Balance of Remaining Project (220 LF) Tank Farms 4 & 5 – Addt’l Data Gap FieldworkWork Plan in Review Tank Farms 1, 2, 3 – Remedial InvestigationNeed to Coordinate with DESC Gould Island – Phase 2 RI Field ModificationsAnticipated Additional Field Work Site 19 – Onshore FieldworkWork Plan/Fieldwork/Reporting Building 70 – Groundwater MonitoringUST Program – Reviewing Ongoing Need- TOTAL PLANNED REQUIREMENT$3,857,150 PROJECT REMARKS