1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
AMS tracker hardware status (mechanics and cabling) Divic RAPIN, UniGe AMS splinter tracker, Septidi 7 Brumaire 217 (october 28, 2008) off-line operations.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Installation of the T600 at Fermilab CSN2, September 22,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ELENA installation progress F. Butin / ELENA collaboration.
GLAST Large Area Telescope:
Planning for Proto-DUNE PD Installation and Cabling at CERN
Installation of the T600 at Fermilab
SCHEDULE Nov 1st - Assembly Table Complete
LARP Vertical Test Facility
Far Detector Activities Late 2017 – Early 2018
GLAST Large Area Telescope:
Cryomodule Assembly Plan
LCLS Undulator System Production Management
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Polarized 3He target installation
Presentation transcript:

1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC

2 Agenda AMS Assembly Area/Clean Room 867 STA & Flight Integration Hardware Status Pre-integration of STAs in the Flight USS prior to STA VC/CMR arrival Pre-integration of Detectors on the STA VC & Flight USS prior to Flight Cryomagnet arrival Integration discussion items & plans for resolutions Final Flight Integration Integration data delivery

3 AMS Assembly Area Clean Room 867 Everything in the AMS Assembly Area/Clean Room 867 needed to begin the STA integration will be ready no later than (NLT) February 2, Operation as a Clean Room (air conditioning, filters, sealed & positive pressure) will be ready in May, 2007 Rotation Assembly Stand (RAS) delivered, assembled, installed, and ready for use Scaffolding delivered, assembled, and ready for use

4 AMS Assembly Area Clean Room 867 Information provided in the Resource Requirements checklists has been used to order common use supplies and to estimate facility requirements Work area required – with & without crane access & special access Crate storage area, volume, and environment Tables & chairs Storage cabinets & open shelves Air bearing pallet requirements Cleaning fluids/supplies & vacuum cleaners Supply gases (Xe, He, CO2, N2, Compressed air, etc.) Fans for ventilation/cooling of hardware & personnel Power requirements ??? If you didn’t ask for it on the checklists, do NOT expect it to be provided!

5 Remov- able Ceiling Panels N Ceiling Panels are NOT Removable Airlock AMS Assembly Area Clean Room 867

6 STA VC integration with the STA Magnet (Cold Mass Replica - CMR) was completed in December at SM STA VC Arrived in Terni/INFN for Sine Sweep Tests on January 10th Test hardware was previously shipped to Terni and testing has been completed Ship STA VC to ESTEC for Acoustic Tests - March ’07 * Return to CERN for integration in USS – late March ’07 * * Depends on results of STA VC/CMR sine sweep & acoustic tests AMS STA Integration Hardware

7 Flight USS is complete and will arrive at CERN with the Primary Support Stand (PSS) and the Primary Lift Fixture (PLF) on January ~22-23, 2007 AMS Flight Integration Hardware Flight Vacuum Case is complete and will be shipped to SCL/SM when they have room in their facility to accommodate it (after Flight Cryomagnet tests are completed and the SFHe Tank is delivered and SFHe leak tested)

8 Pre-integration of STAs in the Flight USS Prior to STA VC Arrival STA Hardware Pre-integration in Flight USS On-line integration of the STA Crates/Radiators on the USS will begin the week of February 5, 2007– before the STA VC arrives This allows work to proceed even if the sine sweep & acoustic tests are delayed 10T crane installation will be delayed until after STA Pre- integration is complete at beginning of March If necessary, the USS/STAs in PSS will be moved away from crane installation There are ~3-4 weeks available in March to use the flight USS & STAs for fit checks, cable & plumbing runs, measurements, etc.

9 STA Hardware assembly in Flight USS (cont) Integration of all STAs in USS to be completed by mid-April ’07 * Even though the STA VC delivery to Terni slipped ~5 weeks and the RAS readiness at CERN slipped ~3 weeks, this is only ~2 weeks later than previously reported at AMS TIM on October 27, 2006 Ship USS with STAs to Munich/IABG in April ’07 * Static Tests Modal Tests Return USS with STAs to CERN in August ’07 * * Depends on results of STA VC/CMR sine sweep & acoustic tests and USS/STA modal & static tests Pre-integration of STAs in the Flight USS Prior to STA VC Arrival

10 Integration Discussion Items Interference between Flight VC/Magnet & Electronics Crates during Final Flight Installation Interference with installation access holes on LUSS after LTOF is installed ECAL Main Fixation Bolts & Shims TRD M-Structure Shear Pins & Eccentric bushings Schedules, Schedules, Schedules

Top Views Bottom Views

Temporarily remove mid- brackets and lower struts

Move Main Ram & Wake Radiators outward to allow installation of Flight VC & Magnet Temporarily Reattach Top Brackets to Upper USS

14 Interference between Flight VC/Magnet & Electronics Crates during Final Flight Installation R. Becker/MIT, J. Kastelic & P. Mott/JS, & R. Stafford-Allen/SM to determine how much room is required to clear the Flight VC/Magnet as well as how much room is available by Jan 29 th. Provide estimate of additional length required for lower inter-radiator cables to M. Capell & A. Lebedev Final cable routing must accommodate additional length Be sure there’s no interference with hardware mounted outboard of crate jigs during pre-integration activities Upper inter-radiator connections will be disconnected because the additional length will be too much additional weight C. Lauritzen/JS to determine if there is any problem on the USS if the brackets are temporarily re-attached at a wider position by Feb 5th M. Molina/CGS to determine if Radiator brackets are OK by Feb 5th Consider using blocks/spacers under the brackets and reattaching the lower struts K. Bollweg & J. Heilig will arrange trial test using STA Crates/radiators in late February

15 Interference with installation access holes on LUSS after LTOF is installed J. Kastelic to provide USS Interface info to G. Laurenti & F. Cadoux by Feb 16 th so four new handling brackets can be made G. Laurenti to produce new handling brackets by Sept 1st New handling brackets will use existing fasteners and swivel hoists F. Cadoux to provide extra long hold-down bolts to GSE

16 ECAL Main Fixation Bolts & Shims NASA will provide the ECAL Main Fixation Bolts The flight Shims have already been provided

17 TRD M-Structure Shear Pins & Eccentric Bushings for STA SS - Aachen SS or Al - Aachen SS Bolts, Nuts, & Washers - NASA SS – NASA? Aachen? SS - Aachen SS – NASA? Aachen? Al or SS - NASA USS (Al) - NASA TRD M Structure (Al) - Aachen

18 TRD M-Structure Shear Pins & Eccentric Bushings for Flight Ti - Aachen SS Bolts, Nuts, & Washers - NASA SS – NASA? Aachen? Ti - Aachen SS – NASA? Aachen? Al or SS - NASA USS (Al) - NASA TRD M Structure (Al) - Aachen

19 All the detector groups have continued to evaluate the pre- integration proposal and have agreed that it should proceed according to the schedules thoroughly discussed at this TIM Current estimate of Pre-integration start: August, 2007 Pre-integration finish: December, 2007 Optical fibers between ACC & VC for TAS will be installed Constantly monitor the Cryomagnet progress and decide how much more flight hardware to pre-integrate Current estimate of magnet delivery to CERN: February, 2008 Do as little de-integration as possible – just in time to remove the STA VC and install the Flight VC & Cryomagnet in the USS Pre-integration of Detectors on STA VC & USS prior to Cryomagnet Arrival

20 Consider removing the STA VC, Tracker, and ACC from the USS as an assembly so parallel work can continue during Flight VC/Magnet installation Use VC rotation fixture and wheels/brackets developed at SM This could shorten deintegration by 2-3 weeks; thus allowing combined cosmic ray testing to be extended Pre-integration of Detectors on STA VC & USS prior to Cryomagnet Arrival

21 All detectors must be integrated and functionally tested with the Flight VC and Cryomagnet at CERN by July, 2008 Beam tests at CERN (~1 month reserved) Thermal Vacuum Tests at ESTEC (~3 months reserved) EMI Tests at ESTEC (~1 month reserved) Delivery to KSC in December, 2008 Final integration of Detectors on Flight VC & USS after Cryomagnet Arrival

AMS Integration Data Delivery

What we have… sort of.

Where we must be by December 2008 at KSC...