Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
Advertisements

Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
SPECIAL PROTECTION SCHEME FOR KOODANKULAM
ISSUE OF CONCERN.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PRESENTATION COVERS Past/Present Power Scenario Issues involved
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
Presentation transcript:

CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )

Indian Power System : Amongst the Largest in the World Spread over 3200 kms from North to South & 2900 kms from East-West

Some Typical Numbers … Region= 5 States & UT = 28 State, 7 UT Installed Capacity> 201 GW Substation= 3000 ( upto 132kV) Generating Stations= 657 Nos.( 1257 Gen. units) Trans. Line = 9350 ( upto 132kV) Transformers= 2262 Nos. Voltages= 132kV, 220kV, 400kV, 500kV (HVDC), 765kV, 800kV (HVDC), 1200kV

SOUTHERN REGION WESTERNRE GION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION 1 2 TWO ELECTRICAL REGIONS w.e.f Aug ‘NEW’ GRID HVDC INTERCONNECTS AC INTERCONNECTS MAJOR INTERCONNECTIONS 2X500 MW BACK TO BACK STATION AT GAZUWAKA(SR) 1000 MW BACK TO BACK STATION AT BHADRAWATI(WR) TALCHER KOLAR TALCHER-II TO KOLAR 2000 MW BIPOLE LINK

Southern Grid Over View 651(‘000 Sq KM) (19 % of India) Population 22.5 Crores (22% of India) Sea Coast Around 4000 KM I C MW (28.4 % of India) IC – DM – 8549 DC – 185 IC – DM – DC – 265 DC – 239 DC – 63 DM – DM – 3348 IC – 2457 IC – IC – Installed Capacity in MW DM – Max Demand Met in MW DC – Max Daily Consumption in MU Consumer Profile Domestic Commercial Industrial Irrigation Others SR IC – DM – DC – 725 Pondy DM – 320 DC – 6.97

SR-WR Synchronisation: A little history 400 kV Ramagundam-Chandrapur line commissioned in Nov 1990 Radial assistance to SR during April- May1991 Trial Synchronisation 22 nd Sep 1991 Trial synch operation between 8-14 Oct Hrs- 55 MUs from SR to WR and 0.5 MU from WR to SR WR was connected to NR through HVDC during that time

SR-WR Synchronisation: A little history Advantages  Frequency stability due to larger inertia of combined grid  Better voltage profile  More reserves for System Operator Issues  Line loading issues in WR  Communication and co-ordination issues  Visibility issues due to limited telemetry  No firm commercial arrangements in place  Robust 400 kV backbone not in place

SR-NEW Grid Synchronisation: Watch list Load –Generation mismatch and impact on regional line flows. Seasonal and over-the- day Frequency profile- Behavioral aspects of both Grids- Load changeovers, pump operation etc Congestion issues in each Grid Co-ordination of defense plans, Special Protection Schemes deployment. Frequency Response Wide area Visualisation tools- PMU and Applications Integration of Renewables Impact on Transfer Capability Need for a strong backbone network spanning all Regional Grids

SHORTAGES IN NEW AND SR GRID Shortages dictate the flow direction on synchronisation. SR would be deficit Region in the near future as planned generation(UMPP, Koodankulam,IPPs) have not materialized. Shortages in SR has shown an increasing trend in the past few years

MISMATCH IN LOAD PATTERN SR, ER and WR peak in March NR typically peaks between June to August Hydro and Wind generation peaks during June-October in SR Dec-June pattern Jul-Nov pattern

Shortages in NEW and SR Typical day March 15, 2012 SR NEW NR, 2112 MW, 40 MU WR, 5017 MW, 90 MU ER, 675 MW, 9 MU NER, 116 MW, 2 MU 7158 MW, 136 MU Typical day July 15, 2011 NR, 1200 MW, 20 MU WR, 4375 MW, 58 MU ER, 975 MW, 12 MU NER, 283 MW, 2 MU 1950 MW, 36.5 MU

SHORTAGES IN SR SHOW AND INCREASING TREND WHEREAS NEW GRID SHORTAGES SHOW A DECREASING TREND. ON SYNCH FLOW WOULD BE PREDOMINANTLY TOWARDS SR:- NEED FOR A STRONG BACKBONE

FREQUENCY PROFILE NEW AND SR GRID Frequency profile is another indicator of the Load Generation balance and behaviour of each system. Larger the frequency difference across a seam, more power can be expected to flow.

Frequency Profile NEW and SR

NEW grid

RAPID GROWTH IN RENEWABLES The growth of wind and solar would be very high in South. This would add to the uncertainity as well as Transmission requirement. High wind often co- incides with high hydro generation in SR which may cause bottlenecks A strong transmission backbone would be a necessity to accommodate these levels of uncertainity and co-incidental generation

GROWTH IN INSTALLED CAPACITY OF WIND IN SR Source:  Tamilnadu MW  Andhra Pradesh MW  Karntaka MW  Kerala MW  Tamilnadu MW  Andhra Pradesh MW  Karntaka MW  Kerala MW Installed Capacity of WIND in SR as on 31 st March 2012: HIGH GROWTH IN RENEWABLES IN SR EXPECTED IN THE FUTURE ALSO. THIS ADDS TO THE UNCERTAINITY IN LOAD GENERATION BALANCE AND INCREASES THE NEED FOR RESERVES.

WIND GENERATION OF TAMILNADU Peak of Wind generation in Tamilnadu touched 3820 MW on at 00:42 Hrs TN MET NEARLY 40% OF DEMAND THROUGH WIND

WIND GENERATION OF KARNATAKA FROM TO

CO-ORDINATION OF DEFENSE PLANS Defense plans in each grid needs to be co-ordinated to act synergistically. For example, consider a large outage in SR and consequential frequency dip. If UFR throws off load in NEW Grid, the problem could worsen dramatically. SPS, Islanding schemes may have to be deployed to contain cascade trippings as the entire country would be in one grid

Grid Defense Plans: Settings ALL DEFENCE PLANS IN REGIONS HAVE TO BE CO- ORDINATED ER CONSTITUENTS HAVE ALSO AGREED TO BRING UP THE SETTINGS

Special Protection Schemes in SR Commissioned Proposed. Yet to be Commissioned To be proposed

VOLTAGES:- Pockets of extreme high(Vemagiri complex) and low(Chennai and Bangalore) voltages needs to be addressed immediately or they may constrain import/export capability VISUALISATION:- The Operator would now be exposed to a larger Grid and more incidental network flows. Advance technology like PMU with its applications need to be in place. PLANNING: Better planning/forecasting by each control area (esp. of RE Generation) – dependence on UI to be minimised

Typical flow directions in SR NARENDRA MAHABOOB NAGAR CHITTOOR VIJAYAWADA GAZUWAKA GHANAPUR RAICHUR GOOTY SALEM UDUMALPET TRICHUR MADURAI TRICHY SRIPERUMBUDUR NEYVELI GUTTUR KAIGA RSTPP BHADRAVATI MUNIRABAD P P P P P KOLAR TALCHER JEYPORE HOSUR SSLMM MMDP TRIVANDRUM NELLORE KALPAKKA SIMHADRI HIRIYUR TALGUPPA KADAPA NEYVELI TPS – 1 (EXP) HOODY KURNOOL KHAMMAM N’SAGAR ALMATHY MYSORE NELAMANGALA SOMANAHALLI KALAVINDAPATTU TIRUNELVELI DITCHIPALLY PUGALUR GAJWEL BTPS WARANGAL Highly loaded Medium loaded Lightly loaded VOLTAGE CONSTRAINTS LINE LOADING / ANGULAR CONSTRAINTS LINE LOADING CONSTRAINTS EVACUATION CONSTRAINTS

The road ahead 765 kV Interconnects between SR-NEW Grids would be in place by early With the 765 kV backbone network in place in SR and the high power corridor spanning WR-ER-NR, the network would be robustly tied.

Kudankulam Nuclear TPS (2x1000MW)-U1-Nov-12 U2-6months after Unit1 Neyveli TS2 Exp (2x250MW) U#1- Dec-2012 U#2-March-2013 Vallur TPS (3x500MW) U1-Aug-12, U2-Feb-13,U3-Sep-13) Mettur Stage-3 TPS (600MW) First Sync. Done On 4 th may 2012 Vijayawada Nellore Tiruvalam Somanahalli Hosur Salem Nellore pooling station Gooty N’Sagar Karnool Raichur Sholapur Madugiri Vemagiri Pooling station Khammam Hyderabad Warda TPCIL Planned Transmission system to relieve congestion in SR Major Generation to be expected near Future Simhapuri (U1-1x150MW –COD done U2-1x150 MW-June-12) North Chennai TPS (2x600MW) Meenakshi U1-1x150MW –June kV Backbone network in SR

PAN INDIA PMU SPREAD ( 53 PMUs) AFTER COMPLETION OF ALL PILOT PROJECTS In addition, the URTDSM project of POWERGRID would add another 1186 PMUs to the system)