KIDS FIT FOR LIFE Prepared by: Michael HelselProject Manager Lloyd WestBusiness Analyst Roger MillerHardware Engineer Daryl BasarabGraphic Designer.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

UWF Computing Hardware Standards ITS Annual Recommendations for
Case Study: T-Mobile Retail Personal Coverage Check Kiosk Joe Wong, Integral GIS Sean Alexis, T-Mobile April 18, 2007.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
<<replace with Customer Logo>>
Click Here to Begin. Objectives Purchasing a PC can be a difficult process full of complex questions. This Computer Based Training Module will walk you.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Scope Management
Novell Server Linux vs. windows server 2008 By: Gabe Miller.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
ABC Computer Support Proposal To White Sands Matthew King Derrick Draper Anderson Apachito Johnny Minjares OECS 290.
What is a project? Project Management Institute definition
COMP4710 Senior Design Richard Chapman. Outline What is Senior Design? What is Senior Design? Course Structure Course Structure End of Cycle Binder End.
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
Chapter 3: The Project Management Process Groups
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
Planning. SDLC Planning Analysis Design Implementation.
Graphic design project By: Leo Dobson and Erika Rodriguez Graphic design,7 th period, Mr. Sonier.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
CSC105-Lab Assignment 1, LA1 Mand, Gaganjit V
New SonicWALL Security ESA 3300 & ESA 4300 Appliances For SonicWALL Sales and SonicWALL Partners Allen Schoonmaker Product Line Manager
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
SMART Meeting Pro Personal Edition 1.0 Introducing.
Recreation and Wellness Intranet Project
Purchasing a Computer. Today v Things to consider when purchasing a Computer v The spreadsheet exercise v Final project.
Group members Budirman B Daud Datu Zakariah B Datu Bistari
Time & Expense Forms MRC Consulting. Project Goals Provide an automated web based Time & Expense reporting system for MRC Consulting and its clients.
BROADCASTING ON A SHOESTRING Presented By: Roxana L. Butler.
Parts Of Computer Networks What makes them work!.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Travel Website Enhancement Project Project Update First Name Last Name.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Objective  CEO of a small company  Create a small office network  $10,000 and $20,000 Budget  Three servers (workstations)  Firewall device  Switch.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Kaizilege Karoma Storage Capacity + What to buy Binary Did you know that all of the information that travels through your computer is based on two commands?
Wright Technology Corp. Minh Duong Tina Mendoza Tina Mendoza Mark Rivera.
Getting Organized Module 7: The Production Process LESSON 1.
Final Presentation Prepared by: Arezoo Gazerzadeh Syed Ahmed Floyd J. Srubar Damian Ottley Ramakrishna Gudikandhula.
HP Touch Smart Computer Link Station Pro Network Station Toshiba Projector.
Orion Energy Systems Plymouth, WI. Since 1996, Orion Energy Systems has been revolutionizing the manufacturing, industrial, warehousing and commercial.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
July 2013 Elastic Offloading by Dale Denis. Dale Denis The Elastic Offloading of Computationally Intensive Tasks to the Cloud to Augment the Computing.
POWERING UP THE LAB! BUDGET PROPOSAL AND DETAILS The Free Thinker School Home of the Rams.
Team-Based Development ISYS321 Managing the Information Systems Project.
Team Wildcats By: Patrick Kelly And Jesus Flores.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 6/6/2016 1/25 IT076IU Software Engineering Project Review 2.
Online Newspaper CMS 1 Date: 27/12/2012. Contents Introduction Project Management Requirement Specifications Design Description Test Documentation Summary.
Unit 2 Assignment 2 M2 RECOMMENDED PC. ZOOSTORM Processor – Intel Core i Operating system – Windows 8 Memory – 8GB RAM Hard Drive – 1TB.
1 State of Georgia (GTA) Desktop Inventory Workshop March 16, 2009 © 2009 IBM Corporation IBM.
What to look for?  Consider whether you should purchase a new or used computer.  Many people who sell computers before they are out of date allow you.
SBS Alert Web Console Senior Design 3 – February 28, 2005 Debra Sweet Barrett.
Unit 2 Technology Systems
Computer Buying Project Names of the Members of our Group:
Opening Session.
PC Components Microprocessor - performs all computations RAM - larger RAM memory contains more data Motherboard - holds all the above components Ports.
Topic 2: Hardware and Software
CS111 Computer Programming
By Christine, Katie, Lucas, and Sean
Super computer project
Team: LV Super Duper Savage Squad
Ashanti E., Dailyn D., Jocelyn C.
Alondra Padilla Emily Aguado Erika Muñoz
Computer Selection - Hardware Components
HARDWARE SPECIFICATIONS.
$795 Clone Notebook Intel Pentium D 1.73 GHz Core 2 Duo (T2250)
Presentation transcript:

KIDS FIT FOR LIFE Prepared by: Michael HelselProject Manager Lloyd WestBusiness Analyst Roger MillerHardware Engineer Daryl BasarabGraphic Designer

INITIAL ANALYSIS Project description Project description Project requirements Project requirements Budget Budget Schedule Schedule

Final Status Report Project Name: Kids Fit For Life Team Member Name: Roger Miller Date: 05/07/2008 Reporting Period: 04/03/2008 – 05/07/2008 Work completed this reporting period: -Initial use case diagram and narratives -ERD and Class Diagram -Flow chart and Story Board -RFQ’s -Analysis specifications delivered and given tentative approval. Work to complete next reporting period: -Purchase hardware -Hardware setup -Create web site -Roll out product What’s going well and why: - The Team continues to work well together due to weekly meetings where problems and conflicts are addressed and resolved. - Tentative approvals have been given by the Client on project analysis; this has been accomplished due to the diligence and cooperation of all team members. What’s not going well and why: - Content development. The content is taking longer to develop as a result of client changes and modifications. Suggestions/Issues: Project changes - Content scope now requires an end user survey to start after the user exits the program.

LESSONS LEARNED TEAMWORK TEAMWORK TIME MANAGEMENT TIME MANAGEMENT COMMUNICATION COMMUNICATION PROJECT SPONSOR PROJECT SPONSOR

SOFTWARE DEVELOPMENT USE CASES USE CASES ERD ERD CLASS DIAGRAM CLASS DIAGRAM

USE CASE

NARRATIVE

ERD

CLASS DIAGRAM Get Health Information

SELECT LANGUAGE

SELECT CONTENT PAGE

EXERCISE PAGE

HARDWARE DEVELOPMENT Initial requirements - Kiosk - Small Form PC ( wireless capable) - Touch-screen monitor - Speakers - Phone - Power protection - Accessories (cables, velcro, etc.)

Hardware Selection process Selection process –Preferred vendors –Research alternative vendors –Issue RFQ’s

Hardware Comparison Matrix Comparison Matrix Dell Optiplex 755 HP DC 5750 Criteria Case Size Small Form Hard drive size 80 GB Memory 1 GB PC GB DDR Processor Speed Intel Duo Core2.2 GHz AMD Athion Dual Core 2.3 GHz Service Contract 3 Yr NBD on site Price $ 1056 $ 1196 Build Time 7 days Notes: St. Andrews prefers to use Dell products. As the matrix shows similar products are available for close to the same price. Since HP is priced higher we chose to go with Dell. Using Dell products also simplifies St. Andrews Hardware support by keeping it uniform and consistent.

RFQ

FLOW CHART CONTENT DEVELOPMENT