Wisconsin Department of Transportation 2015 Real Estate Conference Access Issues Wisconsin Dells, WI September 30, 2015 1.

Slides:



Advertisements
Similar presentations
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Advertisements

THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
SPECIAL ASSESSMENTS JIM WAINWRIGHT AHLERS & COONEY, P.C. 100 Court Avenue, Suite 600 Des Moines, IA April 4, 2014.
Basics of County Offices Highway Department County Officials Academy.
Paula Gutierrez Baeza, Esq. Richards, Watson & Gershon Amer Attar, P.E., MBA City of Temecula Joyce L. Riggs, MAI, SR/WA Riggs & Riggs, Inc.
Location Hammock Dunes DRI – Includes: -Hammock Beach -Ocean Hammock
FDOT R/W Guidelines Use of License Agreements
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
SPEED LIMITS Joe Gorfida, Jr. Main Office: (214) Direct Dial: (214) TEXAS MUNICIPAL COURTS EDUCATION CENTER 2012 Municipal.
POWTS Maintenance WCCA Fall Conference November 3, 2006 Pete Tarnowski Manitowoc County.
1 FRAC SAND MINING ROADWAY IMPACTS Bruce G. Stelzner Bruce G. Stelzner Chippewa County Highway Commissioner Chippewa County Highway Commissioner Wisconsin.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
When to Purchase Access Rights versus When to Exercise our Police Power in Lieu of Purchasing. Mike Roach WisDOT Access Management Engineer May 15, 2013.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
FISCAL STUDIES: LEGAL BASIS John R. Molitor Attorney.
Functional Classification CE 453 Lecture 3. Objectives Summarize general highway design process Identify different roadway classification systems Identify.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
I. A Closer Look at Right of Way Appraisal Issues.
Office (307) Toll Free Right-of-Way Program Right-of-Way Program 5300 Bishop Blvd., Cheyenne, WY
Acquiring a “Sign Site” in Eminent Domain
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
Alliance Management Group Tax Year 2012 Update 1.
Municipal Tax Increment Financing
Community Development Department COBBLESTONE VILLAGE FIRST AMENDED AND RESTATED MASTER PLANNED DEVELOPMENT AGREEMENT Application #2241.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Open Space Residential Development Bylaw Town of Rehoboth.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
What is reasonable access? When and how do we go about measuring severance damages due to a change in access? NOTE: Reasonableness is a question of fact.
PUBLIC RESTRICTIONS ON OWNERSHIP. FOUR BASIC POWERS OF GOVERNMENT OVER REAL PROPERTY TAXATION ESCHEAT EMINENT DOMAIN POLICE POWER.
Traffic Generation Assessment February 21, What did the County do BEFORE TGA and what is it?
TOPICS IN LAND SURVEYING: SUBDIVISIONS TREC #7220 TIM HOWELL, RLS TREC INSTRUCTOR #1556.
PROPERTY INSPECTION AND ANALYSIS: THE SITE Chapter 6.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
ROAD ADOPTION PROCESS TOPIC GROUP OVERVIEW OF HCC ROAD ADOPTION PROCESS DAVID HUMBY 24 TH & 25 TH FEBRUARY 2010.
RIGHT OF WAY BEST PRACTICES FOR LOCAL PUBLIC AGENCIES.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
© 2009 by South-Western, Cengage Learning SAMIRLANDER Chapter 20.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Real Estate Investment Chapter 2 Land Use Controls © 2011 Cengage Learning.
Private Sector  Buildings and structures built for ordinary people.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Residential Plats Orange County Board of County Commissioners August 19, 2014.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Projects City Council Workshop May 14, 2013.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Real Estate Overview Matt Kouskouris, Division.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
ANNEXATION Statutory Overview July 19, 2011 David L. Yearout, AICP, CFM.
Western Area Power Administration Land Acquisition Discussion May 11, 2016.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
Valuation Based on Zoning
Common Surveys Used For Commercial Real Estate Transactions
General Tab Project, Cost Schedule, and Work Limits Roadway Character
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Eminent Domain.
Multi-Parcel Auction Conducted by: Chillicothe Intermediate School
Presentation transcript:

Wisconsin Department of Transportation 2015 Real Estate Conference Access Issues Wisconsin Dells, WI September 30,

Presenter John Rolling, SR/WA WI Certified General Appraiser # Rolling & Barnes, LLC 222 N. Midvale Blvd., Suite 22 Madison, WI

Seminar Topics When Are Access Changes Compensable ? How to Distinguish between Access Change and a Taking of Access Rights How to Measure Access Change Damages through Sales Comparison and Cost Approaches 3

3 Questions on Access Change Physical Change Legal Rights Value Impact 4

Access Change Also known as: Change in How a Private Property Connects to the Public Road System 5

Legal Rights Taking of Access Rights vs. Change in Access Point 6

Right of Access Defined “…a right of the owner to enter or leave his or her property by using an abutting street or highway, without obstruction.” – Wisconsin Jury Instruction JI-Civil

Taking of Access Rights Wis. Stat (6)(b) compensable damages include: “Deprivation or restriction of existing right of access to highway from abutting land… 8

Wis. Stat. § 32.09(6)(b)- Continued “…provided that nothing herein shall operate to restrict the power of the state or any of its subdivisions or any municipality to deprive or restrict such access without compensation under any duly authorized exercise of police power.” 9

Examples of Police Power Closing an intersection Replacing direct access to highway with a frontage road Constructing a median barrier Widening travel lanes within existing ROW Relocating a highway 10

Compensable Property Right: The Right to Apply for an Access Permit 11

How to Identify A Taking of AR’s ? 12

Plat Identifies Taking of AR’s “Whiskers” Signify a Taking of AR’s 13

Plat Identifies Taking of AR’s Project Schedule of Interests Confirms 14

Plat Identifies “No Take” of AR’s -1 Project Plat – “Bullets” or “Balls” Mean “No Access by Statutory Authority” New freeway built on open land. Wis. Stat. § controls. 15

Plat Identifies “No Take” of AR’s -2 Project Plat– “Diamonds” Mean Access Rights Previously Restricted. 16

Controlled Access Highways See Title Report “Finding, Determination and Declaration” for Controlled Access Highways – Chapter (State) – Chapter (County) -Freezes location, number, type of access points -Future alterations require approval -Revocable if other access available 17

Other Sources of AR Data: Title Report Notice of Freeway or Expressway Designation (Wis. Stat. § ) -No new direct access to future freeway or expressway permitted -When existing access point replaced by frontage road access, no compensation 18

Other Sources of AR Data: Title Report Subdivision Plat or Certified Survey Map - Access restrictions often shown here - Trans 233: WisDOT right to review access to state highwayfrom proposed subdivisions 19

Other Sources of AR Data Driveway Permits Permit terms specify use (agricultural, residential, commercial), location, opening size, paving materials. Does existing driveway conform to permit? Permits revocable as traffic conditions change. Permits not recorded Check records of jurisdiction 20

Driveway Permit Jurisdictions Type of HighwayJurisdictionContact State Trunk HighwayWisDOTAccess Coordinator at Region Office County Trunk HighwayCountyCounty Highway Commissioner Local RoadMunicipalityTown, Village, City Clerk, Zoning Administrator, Engineer, Building Inspector 21

Summary Re Compensability: What Access Rights Before? Police Power Limitations Prior Conveyance of Rights Right to Apply for Permit 22

Property Utility Question Before Condition If Landowner has Right to Apply for Permit How Likely is Permit Approval? 23

Road Connection Standards 1 Established by Maintaining Authority Considerations – Highway Classification – Highway Traffic Volume – Speed Limit – Topography – Sight Distance 24

Road Connection Standards 2 Considerations Continued – Intersection Geometry – Spacing to Existing Openings – Use of Property: Ag, Res, Comm, Ind – Trip Generation – Opening Size/Slope/Pavement Surface 25

Property Utility Question After Condition Does Loss of Ability to Apply for Access Permit at this Location Result in Diminished Utility? 26

Other Compensable Damages Related to Access Change Internal Circuity of Travel Change of Grade 27

Internal Circuity of Travel …the condemnor may also consider costs of extra travel …to reach any point on the property from any other point on the property.” - Wis. Stat. § (6) (e) 28

Internal vs. External Circuity Internal: Circulation within site disrupted - Compensable External: Access to the site less convenient - Not Compensable 29

External/Internal Example 30

Change of Grade “Damages to property abutting highway right-of-way due to change of grade where accompanied by a taking of land.” - Wis. Stat. § (6) (f) 31

Grade Change/Access Change Example Continued 32 Roadway expansion would result in driveway slope 20% +/-.

MEASURING ACCESS CHANGE DAMAGES 33

Sales Comparison Approach Preferred Method for Estimating Damages “As a basis for determining value, a commission in condemnation or a court may consider the price and other terms and circumstances of any good faith sale or contract to sell and purchase comparable property. “ Wi. Stat. § (1m) 34

Sales Comparison Approach Use for Quantifying Damages Change in Highest/Best Use? – New Comparables for After Condition HBU Retain HBU, Change Intensity? – New Comparables or Change to Adjustments 35

Cost Approach How used to calculate damages? 1.Identify the functional problem resulting from a)Acquisition of Access Rights b)Change of Grade c)Internal Circuity of Travel 2.Quantify the damage “as if” uncured Before Value – After Value 3.Estimate contributory value of improvement rendered obsolete. 4.Cost to cure– partial or total mitigation of damages. 36

Special Properties/Special Impacts On-Site Circulation an Aspect of Specialized Design Site Improvements Built to Direct Traffic Interior Building Layout Oriented to Outside Circulation Pattern 37

Examples of Circulation-Dependent Uses Fast Food Restaurants - drive-up windows Banks, Credit Unions – drive- up windows Dry Cleaners - drive-up windows Gas Stations – pump islands Medical Building – emergency/disabled entry Freight Terminals – docks Warehouses – docks Grain Elevators, Asphalt Plants, Cement Terminals, Etc. 38

Aids to Judging Industry Standards-- Direct Observation Do What Appraisers Do Best– Survey the Local Market – Drive Around Town – Aerial Photos How Are Comparable Sites Accessed? How Is Their Internal Circulation Configured? The Subject’s Own Competitors Set the Most Relevant Standard 39

What We Covered Today Access rights vs. access points The varieties of prior access restrictions and statutory access controls Information sources for before access rights Other “access-related” compensable changes Use of valuation approaches re access problems Special use properties/special problems 40

THANK YOU! 41