COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.

Slides:



Advertisements
Similar presentations
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Advertisements

Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik Draft Interoperability Proposal Terry Davies SRNWP Meeting October 8-11, 2007.
1 National Institute of Meteorology Brazil - INMET The NWP System at INMET COSMO Model Gilberto Ricardo Bonatti Antônio Cardoso Neto REUNIÓN DE EXPERTOS.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz News from the COSMO GM 2009 and Future Directions of.
Slide 1 EUMETNET SRNWP Interoperability Workshop 2008 Slide 1 Interoperability with regard to Boundary Conditions Alfred Hofstadler Meteorological Applications.
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
SRNWP data pool Jean-Marie Bettems / MeteoSwiss Claudia Heret / DWD COSMO GM Roma, September 5 th, 2011.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
STC-Report September, 10 th, 2009, Offenbach. STC-Report Priority Projects/Tasks  Conservative Dynamical Core” (CDC) approved by STC  Decision tree.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Experience with COSMO MPI/OpenMP hybrid parallelization Matthew Cordery, William Sawyer Swiss National Supercomputing Centre Ulrich Schättler Deutscher.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games” General Meeting 2011.
Status of COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2003.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
© GEO Secretariat Overall Concept What? B08FDP Forecast Demonstration Project (Nowcasting) B08RDP Research & Development Project (Ensemble Prediction Systems)
COTEKINO Priority Project COSMO WG7 Chiara Marsigli.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Summary of WG3 activities Physical Aspects Federico Grazzini ARPA Emilia- Romagna Servizio Idro Meteo Clima (SIMC)
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
Status of the COSMO-Model Package Ulrich Schättler.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Status of the COSMO-Software and Documentation WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Changes to COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2004.
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
10° General Meeting Adriano Raspanti - WG5 – VERSUS PL.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
HYDROMETCENTRE of RUSSIA Gdaly Rivin STC COSMO September 2008, Krakow, Poland Hydrometeorological centre of Russian Federation.
FE 1 Ensemble Predictions Based on the Convection-Resolving Model COSMO-DE Susanne Theis Christoph Gebhardt Tanja Winterrath Volker Renner Deutscher Wetterdienst.
Deutscher Wetterdienst Preliminary evaluation and verification of the pre-operational COSMO-DE Ensemble Prediction System Susanne Theis Christoph Gebhardt,
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Vincent N. Sakwa RSMC, Nairobi
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
Philippe Steiner, MeteoSwiss COSMO General Meeting September 22th, 2005 Plans of MeteoSwiss for next year.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
The presence of sea ice on the ocean’s surface has a significant impact on the air-sea interactions. Compared to an open water surface the sea ice completely.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Ensemble activites and plans at MeteoSwiss André Walser.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Introducing the Lokal-Modell LME at the German Weather Service
Report from the Scientific Project Manager
DWD Beitrag zu CMIP6-DICAD (TP3)
BACY = Basic Cycling A COSMO Data Assimilation Testbed for Research and Development Roland Potthast, Hendrik Reich, Christoph Schraff, Klaus.
External Projects related to WG 6
Recent work using Satellite winds at the Deutscher Wetterdienst (DWD)
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
PP Kenda : Status Report christoph.
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Preliminary test for the development of a 2.8km ensemble over Italy
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
Selected Priority Projects
MOGREPS developments and TIGGE
Conservative Dynamical Core (CDC)
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
New PP: Consolidation of COSMO ensemble (CONSENS)
Activities of WG7 Chiara Marsigli.
Presentation transcript:

COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC

COSMO – 09/2007 Tornados in Poland

COSMO – 09/2007 Tornados in France

COSMO – 09/2007 STC-ReportSTC-Report EUMETNET-SRNWP  COSMO will contribute to the Interoperability Project  MCH and DWD will participate for COSMO with the following deliverables:  D1: A report documenting the standard output format  D2: A Documentation describing the requirements and specification for the adaptor software (software tools for conversion between different data formats and model grids;  D3: 2-way adaptors that transform the output from COSMO to the standard output format and vice versa.  D4: Enhancements to existing software tools that enable COSMO to process data from the four Global Model  MCH the only country to join the Verification project

COSMO – 09/2007 STC-Report Reporting and planning cycle  Has been introduced during the last COSMO year  Not all reports and planning documents available in time  We have to do better  But: Planing will be revised and shifted by 2 months  Room for optimization  Marco to report on that later Priority Tasks have been introduced  Consolidation of cumulus convection scheme (former UTCS (v))  Consolidation/unification of diagnostic postprocessing

COSMO – 09/2007 Priority Projects  Kenda  Finally staffing for permanent post at DWD successful  UTCS  Resource problems seem to be sorted out  Additional contributions from HMC, MCH, HNMS and DWD 4 new priority projects have been approved  COLOBOC: Consolidaion of lower boundary conditions  CONSENS: Consolidation of COSMO-Ensemble  BUs needed to run LEPS and SREPS will be provided by COSMO-partners that are members of ECMWF  Sat-Cloud: Assimilation of Satellite Data with Clouds and Over Land  Versus 2  Split into 2 phases  USAM will provide resources to compensate for Angela Celozzis matarnity leave  CDC Conservative dynamical core  New expert team on dynamics set-up at IMGW  Need to proceed in 2 branches  Further refinement of planning needed STC-Report

COSMO – 09/2007 Next meeting: Offenbach September 2009 DWD’s new building STC-Report

COSMO – 09/2007 Presentations on Status and Plans of COSMO-Partners  DWD  MCH  USAM / ARPA-SIM  HNMS  IMGW  NMA  HMC STC-Report

COSMO – 09/2007 Titel Focus on short range and very short range forecasts Leading role in modelling and data assimilation on the convection permitting scale The NWP system should lead to  A measurable decline in erroneous predictions  An enhanced forecasts of “high impact” weather  A valuation of the reliability of the forecasts This results in  Local scale ensemble forecasting system  Global forecasting system that must be expanded into an ensemble prediction system providing the necessary BCs on the regional scale  Maximum use of remote sensing data Deutscher Wetterdienst Strategy

COSMO – 09/2007 Cooperation with Academia  Strategy calls for a close co-operation with universities and research institutes  Extramural research  Application-based research supported directly by DWD  Proposals must be related to operational weather forecasting  Ertl Center for Atmosphere and Climate Research  Initial phase (first 4-12 years) funded by Ministry of Transport  Will support several groups of researchers to establish competence clusters  Topics  Dynamics of the Atmosphere and Predictability  Data Assimilation  Model Development  Climate Monitoring and Diagnostics  Optimal usage of Information from Weather Forecasting and climate simulation (Societal and Economic Applications Research) Deutscher Wetterdienst Strategy

COSMO – 09/2007 New diagnostics for 2m-Temperature (EU+DE), Enhanced Tiedtke cumulus convection scheme (EU), Tuning of turbulence scheme (DE), 2-timelevel Runge-Kutta dynamics(EU), Work on SSO scheme for (EU) A lot of work done in the context of the new super-computer system  IBM -> NEC, move from BUFR-input to NetCDF, new observational database Sky Deutscher Wetterdienst Achievements over the last COSMO year 3D-VAR was finally made operational yesterday!

COSMO – 09/2007 GME  Runs at 00, 06, 12, and 18 UTC up to 168 h  40 km, *40 levels COSMO-EU  Runs at 00, 06, 12, and 18 UTC up to 78 h  7km, 665*657 * 40 levels COSMO-DE  Runs at 00, 03, 06, 09, 12, 15, 18, 21 UTC up to 21h  2,8 km, 421*461 * 50 levels Status of the NWP-system Deutscher Wetterdienst Status of the NWP-system

COSMO – 09/2007 Mid 2009: GME 20km, 60 levels Hybrid data assimilation scheme for GME and ICON  3D-Var and LETKF  Late 2009 integration in GME  2011 introduction of LETKF in ICON COSMO-DE-Ensemble  Same configuration as deterministic model  Pre-operational 2009, 20 members  Operational 2011, 40 members ICON  Non-hydrostatic, triangular mesh  Operational 2011  Will replace GME and COSMO-EU New  3 TFlop front-end  Q NEC SX9: 30*LMRAPS within 1400” in parallel  Q NEC SX9: 90*LMRAPS within 1400” in parallel Deutscher Wetterdienst Future Development of the NWP system