The Wody Group now proudly presents their Mission Statement and Mission Plans Class Project Fall 2000 ECE 6276.

Slides:



Advertisements
Similar presentations
REQUESTING TRANSCRIPTS Student Training Presentation.
Advertisements

ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
The Information School at the University of Washington IMT 582 Readiness Assessment Bob Boiko UW iSchool ischool.washington.edu Metatorial Services Inc.
HORIZONT 1 ProcMan ® The Handover Process Manager Product Presentation HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89.
© Janice Regan, CMPT 102, Sept CMPT 102 Introduction to Scientific Computer Programming The software development method algorithms.
Term Project Overview Yong Wang. Introduction Goal –familiarize with the design and implementation of a simple pipelined RISC processor What to do –Build.
Chapter 5: Project Scope Management
Designing Basic Web Sites II: Process Based on Web Style Guide, Lynch and Horton Technical Communication.
Chapter 5: Project Scope Management
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Recreation and Wellness Intranet Project
Copyright Course Technology 1999
Ivan Dontsov, Andy Phenix, Maureen Rottschaefer. Project Outline “The primary objective of this OMSE 2012 Practicum Project is to extend and refine the.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
NTUEE DSP Design Lab – Fall 2008 Lecture 8 p. 1 Wednesday - Nov 05, 2008 Lecture 8 DSP Design Lab Fall 2008 NTUEENTUEE Today: Project Planning/Management.
Identify steps for understanding and solving the
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
HPRP: New Reports HPRP new reports and data entry reporting review April 2010.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Adolescent Literacy – Professional Development
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
Presenter Date Page Project manager The PROGRAM The Company Name 03/21/01 STOPLIGHT METRICS Stoplight Charts provide a means of communicating the status.
Taking the Leap: Graduate School RaiNesha Miller Doctoral Student Oklahoma State University Counseling Psychology.
T Iteration Demo METAXA PP Iteration 17 November November November 2015.
UCATS - Status Report1 UCATS Unmanned Control & Tracking System Kurt Chewing Jennifer Greene Dave Manley Jeanette Smith John Smith Team DJ 3 K.
Chapter 3: Software Project Management Metrics
Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276.
FDR--ECE6276 Class Project 12/06/00 The ChooChoo: Final Design Review System Integration Software School of Electrical and Computer Engineering Georgia.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
2 Session 30 eZ-Audit – Electronic Submissions of Financial Statements and Compliance Audits.
State Aid prepares the Agreements for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction Engineering (CE) State Aid.
ECE791 Senior Design Experience Project Requirements and Timeline.
Resources - Agenda Training - In Scope Thinking ahead Envisioning an outcome Communications Basic plans Risk identification Issue Identification CAP.
1. STARTING POINT Data is an important part of helping State and Local HDs achieve better health outcomes for their constituencies. Currently there appear.
SMARTSHOP By: EVN BHARGAV NAGARAJU NAIDU – SASHI TERLI Belligerents.
Statement Of Work Define static processor, DSP Profiles, memory and bus architectures. Define interconnections between DLX and DSP processors while helping.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
T Project Review Muuntaja I1 Iteration
Overview of the Web Development Process.  Website Strategic Plan (Planning)  Content and Site Architecture (Planning)  Website Strawman (Planning)
FDR--ECE6276 Class Project 12/06/00 The ChooChoo: Final Design Review Wody-Instruction Set Architecture School of Electrical and Computer Engineering Georgia.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
What has been accomplished at the end of MSD 1 & 2?
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
On-Line BankCard Center Presentation Cardholder Role During the Presentation click the mouse on this button to move back a slide During the Presentation.
How Software Projects Start SW projects start with a need. We need to keep better data on the students in the CSCE Dept. I heard that one of our competitors.
Refine Preliminary Design. Schedule Week 9 - Refine Preliminary Design Week 10 – Test/Evaluate Design Week 11 – Continue Final Design, Fabrication Updates.
Document Development Cycle
Project Planning GCP 2008.
How do the Process Model, WBS, SPMP, Goal Statement,
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.

Learning Objective Action: Unit Training Management (UTM)
Day 1: Getting Organized Fall 2012
Designing a Research Package
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
Advanced Energy Vehicle
Introduction to Web Authoring Ellen Cushman cushmane
[Solomon Westerman] [PM]
Informed Choice: The Concept
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
Advanced Energy Vehicle
Employee Task Management Software
Presentation transcript:

The Wody Group now proudly presents their Mission Statement and Mission Plans Class Project Fall 2000 ECE 6276

Mission Statement To provide ISA for different profiles of a reconfigurable DSP and to assist and support other groups to perform tasks in a speedy and most efficient way

How Wody fits in the Big Picture To create ISA for different profiles of DSP To provide ISA to the datapath 2 group To assist algorithm and architecture group in testing the decoders and profiles

Overall Mission Plan TaskEstimated Date of Completion Regroup Modules into Profiles11/3 (Done) Create ISA for Each Profile11/6 (Done) Create Mission Statement and Mission Plan11/10 (Done) Assist Decode Group with Design of Decoder 11/10 Prepare for Preliminary Design Review11/15 Verify Functionality of ISA11/22 Support Test Program Run11/29 Create and Maintain Website12/6 Prepare for Final Design Review12/6

Mission Plan Specifics Regroup Modules into Profiles PlanWork with algorithm and architecture groups to create profile definitions through examination of the algorithm and examination of other DSPs RiskPoor profile definition will affect efficient DSP design DeliverableDefinition of Profiles Status of TaskDone Estimated Completion Date 11/3

Mission Plan Specifics Create ISA for Each Profile PlanExamination of the algorithm and examination of DSP architecture RiskNeed may rise where additional instructions must be added to ISA DeliverableISA definitions Status of TaskDone Estimated Completion Date 11/6

Mission Plan Specifics Create Mission Statement and Mission Plan PlanExamination of past work and future work to determine deliverables, completion dates, plan of record, and risk analysis RiskNot all group members will be available at 11/10 presentation to field questions DeliverableMission Statement and Mission Plan Status of TaskDone Estimated Completion Date 11/10

Mission Plan Specifics Assist Decode Group with Design of Decoder PlanAssist decode group when requested RiskDecoder may not be ready by 11/10 DeliverableCode for decoder Status of TaskUnknown (ask decode group, have not been requested to assist in design process) Estimated Completion Date 11/10

Mission Plan Specifics Prepare for Preliminary Design Review PlanPresent ISA and receive feedback from other groups on ISA RiskNeed may rise where additional instructions must be added to ISA DeliverableISA definitions Status of TaskOn Schedule Estimated Completion Date 11/15

Mission Plan Specifics Verify Functionality of ISA PlanUse Altera Max+Plus II to simulate SOC and send binary test vectors to test ISA and analyze what combination of instructions are need for a non-exhaustive test each profile RiskDSP not ready yet DeliverableResults of ISA testing Status of TaskOn Schedule Estimated Completion Date 11/22

Mission Plan Specifics Support Test Program Run PlanUse Altera Max+Plus II to simulate SOC and assist in troubleshooting of SOC RiskDSP not ready yet DeliverableResults of testing and any problems with SOC Status of TaskOn Schedule Estimated Completion Date 11/29

Mission Plan Specifics Create and Maintain Website PlanBegin construction of website now with continual refinements such that the ISA website is coherent in appearance and function with entire class’ website RiskNoncoherent web design DeliverableWebsite HTML Status of TaskOn Schedule Estimated Completion Date 12/6

Mission Plan Specifics Prepare for Final Design Review PlanPresent ISA definitions and results of SOC testing and report any problems with SOC RiskDSP not ready yet or decision of CDR is NO GO DeliverableISA definitions, results of SOC testing, and any problems with SOC Status of TaskOn Schedule Estimated Completion Date 12/6