EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012.

Slides:



Advertisements
Similar presentations
2014 Commuting and Winter Cycling Survey. Answer Options Response Percent Response Count Commute 54.2%110 Ride Recreationally 79.3%161 No 4.4%9 answered.
Advertisements

Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.
The Great Ohio Lake-To-River Greenway PICTURE THIS…. An 100 mile-long green band of protected open space running through fertile farmlands, lush woodlands,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 12, 2010.
Vermont Association of Snow Travelers Lamoille Valley Rail Trail Site Visits: Tuesday, 12 and 19 November November-8 AM- Tegu Building, Morrisville.
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Eastern Sierra Climbs. Date Ride Hotel Location 9/06/2014 Convict Lake Mammoth Lakes 9/07/2014 Devils Postpile & Lake Mary Mammoth Lakes 9/08/2014 Relax,
Gleneagle North HOA Annual Meeting 23 September pm.
Parks and Recreation Division October 2, 2012 IMPACT FEE FUND UPDATE.
Client Logo Panther Creek Pool October 4, Annual Meeting President’s Report.
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
DCCCD Brookhaven College City Council Presentation October 16, 2007.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2009.
Community Development Department Construction Phase.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: JULY 8, 2011.
City of Murrieta Capital Improvement Projects for FY I-15/California Oaks Interchange I-15 Overcrossing at Los Alamos Road* Jackson Avenue/Warm.
Case No. VA Board of County Commissioners October 20, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2010.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Hop On the Clayplain Train! Church Woods is a 37-acre clayplain forest growing on clay deposited in the Champlain Valley in a glacial lake 10,000 years.
P RACTICE AND R EVIEW. 6: 6:15: 1, 2, 3, 6 1, 3, 5, 15.
NFRMPO TIP Project Delay Policy Revised July 2010 NFRMPO Council Meeting - 10/13/2011.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)
2009 CUMULATIVE BRIDGE PROGRAM Monroe County Highway Department April 14, 2009.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Values 1 ITEM 7G Ordinance No st reading, Establish a Municipal Stormwater.
FMCB Calendar Next Meeting: 9/18/17 Meeting Item Notes FMCB
Environmental Services
Molly Kline, Project Manager
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
ITEM: Th 17a (City of Santa Barbara LCP Amendment MAJ 3-09)
Chapter 10 Geocoding.
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
آشنایی با تاسیس شرکت های دانش بنیان. آشنایی با تاسیس شرکت های دانش بنیان.
BUDGET DEVELOPMENT FY TOWN OF WAXHAW BOARD RETREAT January 19, 2017
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
The Oak Ridges Trail What to expect.
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Oak Park Cross Country Schedule
SECTION EXISTING CONDITION PHOTOS
CHEROKEE PARK TRAIL MAP 6 Miles / 1100 ft Elevation change
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
Oak Park Cross Country Schedule
SUNCREEK ESTATES Section 1
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
URBAN TRAIL PROJECT UPDATES
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
Bowling Green Scottsville
The Lake Norman 2017 Mid Year POA Status Meeting.
Monterey County Project Report for Measure X Expenditures
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
Royal Oak to Bloomfield
Presentation transcript:

EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012

FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8

MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION3,920 SYSTEM MAINTENANCE 252 TAB 1

MANHOLE REPAIRS CONTRACTED (RAISED) 789 GENERAL MAINTENANCE 145 TAB 2

TV INSPECTION INFLOW/INFILTRATION SECTION 65,763’ SYSTEM MAINTENANCE 137,559’ TAB 3

ROOT CONTROL PHASE 1 237,623’ BROOKHAVEN DR BUCKINGHAM CIR CAMBRIDGE DR CARROLLTON CT CHARRING CROSS COTTONWOOD DR DILLARD DR ENGLAND PL FERN VALLEY RD GETTYSBURG TRAIL HAWKINS STORE RD LEE ANN DR MANHATTAN DR NOTTINGHAM DR PATRICK DR RAMBLING RD ROCKBRIDGE RD SHALLOWFORD RD SUMTER DR VISTAWOOD DR WESTMORELAND DR WOODGATE DR PHASE 2 274,878’ CEDARBROOK DR CHAPMAN DR EDGEWOOD DR FARMBROOK TRL FLOYD DR GUILDHALL TRL HECK ROAD HOLBROOK CT KENSINGTON WAY MAPLE FERRY DR OAK FERRY DR PINE FERRY DR RAIL SPLITTER DR STARMIST CT WOOD FOREST RD TAB 4

ROOT CONTROL PHASE 3 99,673’PHASE 4 291,301’ AYRES RDAUSTELL CIR CREEK WOOD LNBLACK GUM CT DRIFTWOOD TRLBUTLER CREEK RD FELTON HILL RDFERN VALLEY DR FONTAINE RDMEADOWVIEW LN HIGHVIEW DRMOON STATION RD HURT RDPAIR RD LAKESHORE DRQUAIL RUN LANDERS DRQUINTO DR MAPLE VALLEY RDROXBORO DR NORTHLAND RDSANDTOWN RD OAK HILLS RDSASANQUA LN PINELAND RDSHADOW RIDGE TRL SHANNON GREEN CIRSHADYSIDE RD VALLEY CREEK RDTIFFANY DR TWILLEY CIR WINDY HILL RD WOOD TRAIL LN WREN WAY YORKSHIRE DR ZELMA ST TAB 4

HYDRAULIC CLEANING GENERAL MAINTENANCE 280,456’ (COUNTY WIDE) TAB 5

EASEMENT CLEARING Quarterly Total YTD Quarter 1808,275’808,275’ Quarter 2276,344’ 1,084,619’ Quarter 3707,241’ 1,791,860’ Quarter 4795,616’ 2,587,476’ TAB 6

AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 1,211 SYSTEM MAINTENANCE 27 TAB 7

Totals by Fiscal Year Linear Feet TAB 8

Each Totals by Fiscal Year TAB 8

Totals by Fiscal Year Tab 8 Each