Fort Bliss Mission and Master Plan Draft Supplemental Programmatic Environmental Impact Statement (SEIS) Public Meetings November 2006.

Slides:



Advertisements
Similar presentations
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Advertisements

What you can’t defend, doesn’t belong to you..  To ensure that Singapore enjoys peace and stability, and that Singapore’s sovereignty and territorial.
1 Siting and Military Capabilities: DoD’s Energy Siting Clearinghouse Bill Van Houten Energy Siting Clearinghouse Office of the Secretary of Defense.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
1 Fort Bragg and Pope Air Force Base BRAC Regional Task Force (RTF) Community Planning for BRAC Implementation October 23, 2006 TRANSPORTATION WORKING.
New I-65 Interchange at Worthsville Road Welcome!.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
The Brigade Combat Team (BCT)
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Foreign Affairs Security Training Center
A Community Call to Action to Respond to: Army 2020 Force Structure Realignment July 8, 2014.
Army Family Team Building
USMC OPERATIONAL OVERLAY SYMBOLS Current as of the 1998 edition of the Operational Overlay Terms and Symbols FMFM 1. Copy and paste the desired unit size.
Doctrine 2015 Information Briefing
1 st Battalion, 3 rd Air Defense Artillery Operation Iraqi Freedom Lessons Learned Air and Missile Defense Commander’s Conference United States Air Defense.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
JOINT FIRES AND EFFECTS TRAINER SYSTEM (JFETS). We currently rely on service component schools to inform on service capabilities, and train component.
Marine Air Ground Task Force Training Command Marine Corps Air Ground Combat Center 1 MCAGCC Future Plans and Development.
Fort Bliss Army Growth and Force Structure Realignment Draft Environmental Impact Statement Public Meeting November 2009.
Integrating COIN and Full Spectrum Training LtCol M. B. Barry 23 Sep 2010.
ROLE OF THE MASTER GUNNER
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Administrative Penalty Program SB Regulatory Item California Air Resources Board Enforcement Division Public Hearing December 12, 2002 Sacramento,
Water Supply Planning Initiative State Water Commission November 22, 2004.
Fort Bliss Mission and Master Plan Supplemental Programmatic Environmental Impact Statement (SEIS) PUBLIC SCOPING MEETINGS December 2005.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
CPT Scott M. Winter / SFIM-AEC-TSS / / DSN / 1 of MAR2005 Future Range Mission Analysis Process.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
POLISH CAPABILITY DEVELOPMENT FOR ARMOURED AND MECHANISED FORCES
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
(Sep) (Second Echelon) ( - ) Armored/ Wheeled Air Defense Mechanized Armored/Tracked Recon Armor/tracked Antitank SP Arty Rocket Arty (MRL) Basic Arty.
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Col Charles Corcoran, 3 WG/CC Maj Gary Wallace, 3 OSS/ADO Ms.
Previous Slide TRADOC DCSINT Office of the Deputy Chief of Staff for Intelligence U.S. Army Training and Doctrine Command TRADOC DCSINT.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
By CPT Robert L. Crabtree
ASA(ALT)/AAE Perspective The Honorable Claude M. Bolton, Jr. Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Army Acquisition.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
III Armored Corps and Fort Hood
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
TRADOC Designing & Building the Future Army
Chapter 7 Symbology.
Assessing Army Infrastructure
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Army Aviation in MOUT.
Previous Slide TRADOC DCSINT Office of the Deputy Chief of Staff for Intelligence U.S. Army Training and Doctrine Command TRADOC DCSINT.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
GORT Planning/Guidance Session with LTG Barclay
Basic Unit and Operational Graphics
View display boards and speak one-on-one with staff
Scoping Meeting April 20th 6:00 pm
Current Event Brief!.
Tactical Decision Games
US Marine Corps
Each unit brings a specific capability to the overall mission.
Alternate Scenario 5 Armored Brigade Combat Team (ABCT) (Kuba River Defense; O/O Attack to PL Chicago) Each unit brings a specific capability to the overall.
Why We are Changing the Army
Basic Unit and Operational Graphics
Each unit brings a specific capability to the overall mission.
Basic Unit and Operational Graphics
The National Environmental Policy Act and the SRS Plutonium Bomb Plant
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Fort Bliss Mission and Master Plan Draft Supplemental Programmatic Environmental Impact Statement (SEIS) Public Meetings November 2006

AgendaAgenda Welcome Col Burns Garrison Commander Briefing  Purpose and Need for Action Col White Deputy for Transformation  Proposed Action and Alternatives Col Kirby Range Commander  Draft SEISWalter Christensen Directorate of Environment 15 Minute Break Public Comments

Purpose and Need for Action  Army Transformation  Army Campaign Plan  Integrated Global Presence and Basing Strategy  Base Realignment and Closure (BRAC)  Modular Force  Brigade Combat Team (BCT)

Unit Changes FY 2006FY 2007FY 2008FY 2009FY th BCT, 1 st CAV th Air Defense Artillery (ADA) Brigade + Evaluation BCT + Artillery (Fires) Brigade + Heavy BCT + Combat Aviation Brigade + Heavy BCT + Sustainment Brigade + Armor Division Headquarters - ADA School/6th ADA Brigade + Various Echelons Above Brigade support units - 31 st ADA Brigade + Terminal High-Altitude Area Air Defense Unit

Transformation to a Modular Force Reconnaissance Battalion Brigade Troops Battalion Combined Arms Battalions Fires Battalion Brigade Support Battalion BSB BTB mm Howitzer (2 Batteries) Target Acquisition 12 Engineer Squads (2 Engr Companies) Various Equipment Chemical Reconnaissance Vehicles Maintenance Company Distribution Company Counterfire and Counter- Mortar Radars Medical Company TUAV Platoons Armed Recon / Fires Company Unmanned Aerial Vehicles Multi-Sensor Unit -Various sensor capabilities Signal Company - Communications/Network Operations Support Military Intelligence Company -Intelligence Integration & Analysis -Human Intelligence capabilities - Command & Control - PSYOPS/Civil Affairs - Aviation & Air Defense - Security Platoon - Military Police Platoon Combat Maneuver & Reconnaissance Capabilities 4 Tank Companies 4 Mechanized Companies 3 Recon Troops 1 Surveillance Troop 2 Scout Platoons 2 Mortar Platoons Over 85 Bradley Scout & Infantry Fighting Vehicles mm Mortar Carriers 40 HMMWV with Long-Range Advanced Scout Surveillance System 2 Sniper Sections Fires Joint Fires Cell 3 Joint Tactical Air Control Teams Target Acquisition Platoon Protection SupportHeadquarters Over 55 M1A1 Tanks 4 Forward Support Companies (provide maintenance and other support to battalions) Heavy Brigade Combat Team (BCT)

Personnel Changes

Training Requirements  Training Circular 25-1 defines annual training requirements for units at Fort Bliss, including:  Small arms and large caliber weapons proficiency training  Off-road vehicle maneuver  Helicopter training  Training requirements indicate a need for:  New live-fire and qualification ranges  Air ground training range  Additional off-road maneuver capability ♦Need minimum of 539,000 acres

Proposed Action and Alternatives  Main Cantonment Area  Expand to north and east of Biggs Army Airfield  Change land use designation to mixed use  Construct four BCT complexes and other supporting facilities  Fort Bliss Training Complex  New and upgraded ranges at/near existing ranges on Doña Ana and McGregor Ranges  New Orogrande Range Complex and Digital Air Ground Integration Range (DAGIR)  Authorize Off-Road Vehicle Maneuver on training areas in the Tularosa Basin portion of McGregor Range

Options Not Under Consideration  No land use changes proposed on:  Otero Mesa  Sacramento Mountains foothills  Castner Range  No expansion of installation boundaries  No alternatives to the BRAC decisions

No Action Alternative  Minor modifications to land use from 2000 Mission and Master Plan Programmatic Environmental Impact Statement (PEIS)  Range upgrades and enhancements in areas approved for weapons firing and surface impact  335,000 acres approved for Off-Road Vehicle Maneuver  North Training Areas  South Training Areas  Training Area (TA) 8  Development of one BCT complex in Main Cantonment Area  Does not provide adequate training capability

Alternative 1  Expand Main Cantonment Area north and east  Designate TAs in south Tularosa Basin portion of McGregor Range land use category A with Mission Facilities  Adds 216,000 acres available for Off-Road Vehicle Maneuver  Develop new live-fire and qualification ranges on Doña Ana Range and McGregor Range  Minimally meets off-road vehicle maneuver needs

Alternative 2  Same changes to Main Cantonment Area as Alternative 1 plus:  Develop facilities on Biggs AAF for second Combat Aviation Brigade (CAB)  Designate TAs in north and south Tularosa Basin portion of McGregor Range land use category A with Mission Facilities  Adds 280,000 acres available for Off-Road Vehicle Maneuver  Same range improvements as Alternative 1

Alternative 3  Same changes to Main Cantonment Area as Alternative 2  Designate all North and South Training Areas land use category A with Mission Facilities  Designate TAs in south Tularosa Basin and southeast TAs of McGregor Range land use category A with Mission Facilities  Adds 287,000 acres available for Off-Road Vehicle Maneuver  Same range improvements as Alternative 1

Alternative 4 – Proposed Action  Same changes to Main Cantonment Area as Alternative 2  Designate all North and South Training Areas land use category A with Mission Facilities  Designate TAs in north and south Tularosa Basin and southeast TAs of McGregor Range land use category A with Mission Facilities  Adds 352,000 acres available for Off-Road Vehicle Maneuver  Same range improvements as Alternative 1

Draft SEIS  Completed in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations  Compares the five alternatives, including No Action  Addresses environmental and socioeconomic impacts in 14 resources areas  Provided for public review and comment  Comments on the Draft SEIS will be included in the Final SEIS

SEIS Schedule  Draft SEIS distributed October 6  Draft SEIS review period ends December 12  Final SEIS will be distributed next spring  Record of Decision no earlier than 30 days after publication of the Final SEIS Notice of Intent Scoping Meetings Scoping Period Draft SEIS Public Comment Period Public Meetings Final SEIS Record of Decision

Summary of Environmental Consequences  Additional personnel at Fort Bliss expected to result in direct population increase of over 60,000, including civilians and dependents.  Increased economic activity projected to attract another almost 60,000 people into the region.  El Paso and nearby communities expected to become more developed to accommodate the population increases.  Traffic congestion around the Main Cantonment Area and on regional highways will increase.  Additional demand for water and wastewater treatment will require El Paso Water Utilities to increase supply.

Summary of Environmental Consequences cont.  Off-road vehicle maneuvers will increase erosion potential in some areas.  Off-road vehicle maneuvers will increase dust, but air quality standards will not be exceeded outside the installation.  The most prevalent vegetation community affected is mesquite coppice dunes, which will not change significantly.  There will likely be some changes in vegetation and species density.  Highly sensitive areas will be off limits to vehicles.  Impacts to historic resources will be managed in accordance with a Programmatic Agreement

Summary of Environmental Consequences cont.  Areas immediately north and south of Doña Ana Range and near McGregor firing ranges will be exposed to elevated noise levels from large caliber weapons firing.  Increased population and activity will incrementally increase safety risks, but they remain low.  Increased use of hazardous materials and hazardous waste generated manageable through existing procedures.  The increased population will need more housing and community services, including schools, law enforcement, fire protection, and medical services.

15 Minute Break

Public Comments  When your name is called, step up to the microphone.  Please speak clearly so the court reporter can hear and understand you.  Your comments will be printed verbatim in the Final SEIS; please do not include any personal information you do not want to be published.  Please observe the time limit so everyone who wants to has the opportunity to speak.

How to Submit Written Comments Comments submitted by December 12, 2006 will be included in the Final SEIS. Mr. John F. Barrera, NEPA Coordinator Fort Bliss Directorate of Environment ATTN: ATZC-DOE-C B624, Pleasonton Road Fort Bliss, TX Comment Form Comment forms are available in the registration area You may submit your comments to the following address: U.S. Mail Written comments or requests for more information should be directed to: Facsimile A fax number is also available to submit comments: 1 (915)