ALICE TC meeting – 27.08.2010 Plans for the next technical stop A. Tauro.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
André Augustinus 16 September 2002 Safety issues.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 51.
TS2 preparatory meeting
LS1 planning meeting
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
LHCb & EYETS
ALICE 5 o’clock meeting Wk
Technical Support Activities in PH-ADO-PO
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Presentation transcript:

ALICE TC meeting – Plans for the next technical stop A. Tauro

TC Meeting Plans for the next technical stop2 Recent activities during cavern access Access 13/8 (12:00 to 15:00): –TRD: tighten LV connections (C-side BKF sector 1, 10,17) –EMCal: RCU card replacement Access 16/8 (13:00 to 16:00): –TRD: sense connector fixed on O-rack –EMCal: trigger board problem –T0: inspection rack area Please remind to add an entry in the ALICE logbook after the intervention

TC Meeting Plans for the next technical stop3 LHC schedule LHC Technical Stops in 2010 M.Lamont 30 th August to 2 nd September 18 th to 21 st October !!! This technical stop might be shifted back – probably very close to the heavy ion period !!!

TC Meeting Plans for the next technical stop4 LHC technical stop 30 th Aug – 2 nd Sep Schedule: –Switch off both magnets: Mon 8:00 (shift leader to call CCC) –RP search (including L3 and Dipole): Mon 8:30 – 9:00 (Fernando + Yannick) –Start cavern access: Mon 9:15 –Close cavern: Thu 16:00 Maintenance access system –Monday from 13h00 to 17h30. Access via guardian at entrance Px24 –Cavern patrol from 17h30 to 18h00 (No access during that time) then back to restricted and access as foreseen Maintenance PX24 lift (AS703) (J.P. Lappe): –Wed 6:00 – 8:00 – no Access to UX-25 –Intervention for upgrade of buttons scheduled in October (lift will be stopped outside normal hours)

TC Meeting Plans for the next technical stop5 LHC technical stop 30 th Aug – 2 nd Sep Cavern interventions ADA: connect and power-up detector (ADI ) TRD: access to L3 for power line investigation (ADI ) TOF: replacement of two DC-DC converters (ADI ) HMPID: replacement pneumatic valve EMCal: check LTU problem (ADI ) PHOS: inspect condensation coming from cooling pipe PHOS #3 (ADI ) Muon Trigger: Open one half plane outside and access the FEE on the top RPC. Need scaffolding. (ADI ) Muon Tracker: (ADI ) - Upgrade of firmware/software on Crocus - Upgrade of firmware/software on Trigger dispatcher. –Need ladder or scaffolding TPC: Maintenance electronic (ADI )

LHC technical stop 30 th Aug – 2 nd Sep Cavern interventions SDD: cooling system check (ADI ) Trigger – CTP: access in area C To: acces necessary RAMSES: (N.Rousset): intervention on PAXL2451, PMIL2502 and PMIL2511 (ADI ) CV: study routing of new PMD ventilation pipes (ADI ) ASN: cleaning toilettes UX-25(ADI ) Dépannage éclairage Zone C (ADI ) Designers access (ADI ) TC Meeting Plans for the next technical stop6

TC Meeting Plans for the next technical stop7 DAQ off on Monday 30 th for upgrade DCS: HLT: CV (D.Piednoir): –Replacement wheel on redundant pump (#1), iced water circuit (PM). Should not cause any water stoppage LHC technical stop 30 th Aug – 2 nd Sep System upgrades

TC Meeting Plans for the next technical stop8 LHC technical stop 30 th Aug – 2 nd Sep CV/DETCOOL Interventions – J.Botelho Direito and P.Bonneau SSD/SDD: replacement ALICAT supply-pressure regulator S2 (31 st Aug) HMPID: check level transmitter (1 st Sep) SPD (ADI ) (31 st Aug - or 30 th if possible): –Test redundant pump –Inspection compressor –Modification PLC program: Remove automatic switch-over to the redundant pump in case of alarm Implement remote control of compressor and pump Run interlock from the detector The station will be automatically interlocked in case of alarm and the reset will be possible only after the detector operator will have removed the interlock. This will avoid unexpected restart: CV will be able to reset the cooling station only after the formal agreement from the detector operator on duty

TC Meeting Plans for the next technical stop9 Peter: –TOF access baby-frame –Remove TOF crate protection (top baby-frame) Didier: –Repair lock L3 door Frederick: –Humidity/temperature sensors L3 (both injection and extraction) – Visula check of racks in cavern and water leak system control Philippe: –Cabling 4 temperature sensors L3 jacket UW to MCR (SPIE) –Install new lights inside L3 Transport team –Reload nacelles batteries LHC technical stop 30 th Aug – 2 nd Sep Cavern interventions: Alice technicians (ADI ) (ADI ) (ADI )

TC Meeting Plans for the next technical stop10 Workshop activities Modify TRD I-bar (Didier): –Cut + machine holes → wk 35 –Test rotator + yellow-platform → wk 36 TRD infrastructure (top modules): –Painting (Didier) in September –Integration test (with module) delayed end year Miniframe suspension tool (Didier): –Fabrication in September New Delphi Frame support (Yannick, Samuel): –Integration with Delphi Frame and load test ongoing (see next slide) New ITS table: –Fabrication drawings and final validation wk 34 –Fabrication (Yannic) will start in September EMCal manifolds (Ben, Philippe): –2/10 manifolds assembled and brazed. Ongoing

TC Meeting Plans for the next technical stop11 New Delphi Frame support Yannick, Samuel, Bruno, Robert

TC Meeting Plans for the next technical stop12 ALICE VIP visits Thu 19 th Aug 10:50 (Expo): –(P.Kuijer) Professor Lieyun Ding, Chancellor, Chairman of University Administration Committee, Huazhong Normal University, Wuhan, People's Republic of China Mon 30 th morning 4 people Mon 30 th Aug PM (time tbc) (undergr.): –(H.J.Specht) 16 students from Technical University of Dresden Entrance via the MAD (access in Restricted mode) + guardian. Patrol boxes must be re-armed after visits.

TC Meeting Plans for the next technical stop13 AOB Removal red barracks ( ) started