San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Fill in Agency Name on Master
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Chapter 34 Bridge Construction.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
CTAA Expo 2009 CTAA Expo 2009 State DOT Roundtable Kimberly A. Gayle, Office Chief Federal Transit Grants Programs Division of Mass Transportation June.
December 22, :30 to 2:30 PM Transportation Laboratory Auditorium 5900 Folsom Boulevard Sacramento, CA Hector Romero, P.E. Senior Transportation.
U.S. 33 Northern Connector Alternative
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Reconstruction of the Eads Bridge Highway Deck
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
ESTIMATING By Laith Jacob.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Stormwater Services Contract Outreach Caltrans Division of Environmental Analysis June 29, 2015 Location: Caltrans Farmer’s Market Building #3 First Floor.
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
Mike Baumann Statewide Utility Engineer January 22, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Bridge Engineering (5) Substructure – Abutments and Piers
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
Working Successfully With Property Managers: An Interactive Engagement
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Department of Civil Engineering,
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
Construction Notes Amer Bata, Area Construction Manager.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
5th Street Bridge Replacement Project Contract No
New Bridge Construction
Washington Metropolitan Area Transit Authority (WMATA)
4th Annual Construction Law Summit
Washington Metropolitan Area Transit Authority (WMATA)
Far Experimental Hall Hutches Civil Construction
Presentation transcript:

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003

SFOBB East Span Seismic Safety Project SFOBB New East Span Feb 5, 2003 Pre-Bid Meeting Welcome - my name is Sarah Picker Welcome - my name is Sarah Picker Purpose : networking for business relationships to construct SFOBB East Span Purpose : networking for business relationships to construct SFOBB East Span Agenda Agenda Sign-In Please Sign-In Please

SFOBB East Span Seismic Safety Project Issues to discuss, from Caltrans to you collect business cards collect business cards other cost savings measures other cost savings measures handouts handouts sign-in sheets sign-in sheets

SFOBB East Span Seismic Safety Project Welcome Opening Remarks by Dan McElhinney Opening Remarks by Dan McElhinney

SFOBB East Span Seismic Safety Project Project Limits Oakland San Francisco

SFOBB East Span Seismic Safety Project YBISAS SKYWAY OAKLAND TOUCHDOWN Existing Bridge

SFOBB East Span Seismic Safety Project Yerba Buena Island T1/E2 foundations ( E4) T1 E2 W2 foundation ( C4) Building demolition (04A1701) YBI/SAS Contracts Transition structure ( H4) SAS superstructure ( F4) Retrofit/Substation ( G4)

SFOBB East Span Seismic Safety Project YBI Substation & Viaduct Retrofit G4 YBI Substation & Viaduct Retrofit G4  a contract to construct a replacement electrical substation on YBI near the westbound on-ramp and complete relatively simple bridge retrofit work near the YBI tunnel (this work is combined due to the close proximity of the work)  advertise 12/09/02  bid opens 2/25/02

SFOBB East Span Seismic Safety Project SAS E2/T1 Structures E4 SAS E2/T1 Structures E4  a contract to construct the Self-Anchored Suspension bridge in-bay foundations, the main tower (T1) and pier E2 just to the east of YBI  advertise Jan 21, 2003  bid open April 15, 2003

SFOBB East Span Seismic Safety Project SAS Superstructures F4 SAS Superstructures F4  a contract to construct the tower and superstructure of the Self-Anchored Suspension bridge advertise Feb 3, 2003 advertise Feb 3, 2003 bid open June 3, 2003 bid open June 3, 2003

SFOBB East Span Seismic Safety Project YBI Structures H4 YBI Structures H4  a contract to construct permanent bridges on YBI  split contract  a contract to construct the temporary detour, south-south detour

SFOBB East Span Seismic Safety Project Recap of SFOBB East Span Seismic Safety Project PIDP PIDP Skyway Skyway Geofill Geofill Archeological Excavation and Midden Site Archeological Excavation and Midden Site YBI Building Demolition(R/W) YBI Building Demolition(R/W) SAS W2 Structures C4 SAS W2 Structures C4 YBI Substation & Viaduct Retrofit G4 YBI Substation & Viaduct Retrofit G4 SAS E2/T1 Structures E4 SAS E2/T1 Structures E4 SAS Superstructures F4 SAS Superstructures F4 YBI Structures H4 YBI Structures H4 south south detour south south detour new midden new midden Oakland Touchdown Oakland Touchdown Existing Bridge Demolition Existing Bridge Demolition

SFOBB East Span Seismic Safety Project SFOBB East Span Today’s discussions relate to the YBI Substation and Viaduct Retrofit construction contract we advertised for bid December 2002 Today’s discussions relate to the YBI Substation and Viaduct Retrofit construction contract we advertised for bid December 2002 bid opens February 25, 2003 bid opens February 25, 2003

SFOBB East Span Seismic Safety Project Other Introductions Will the Potential Prime Contractors in the room volunteer to raise their hands? Will the Potential Prime Contractors in the room volunteer to raise their hands? Would the DBE certified businesses raise their hands? Would the DBE certified businesses raise their hands? Would the potential DBE or small businesses raise their hands? Would the potential DBE or small businesses raise their hands?

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

SFOBB East Span Seismic Safety Project Bob Zandipour Branch Chief, Toll Bridge Program Roadway Items

SFOBB East Span Seismic Safety Project Yerba Buena Island T1/E2 foundations ( E4) T1 E2 W2 foundation ( C4) Building demolition (04A1701) YBI/SAS Contracts Transition structure ( H4) SAS superstructure ( F4) Retrofit/Substation ( G4)

SFOBB East Span Seismic Safety Project Yerba Buena Island  Varied topography meter elevation change  Steep slopes  Narrow winding roads  USCG base for 24 hour Search and Rescue unit  Lots of underground utilities

SFOBB East Span Seismic Safety Project Environmental Constraints at YBI USCG Facilities Historic Structures W2 foundation contract

SFOBB East Span Seismic Safety Project Special Aquatic Site - Yerba Buena Island Yerba Buena Island

SFOBB East Span Seismic Safety Project Retrofit/Substation Scope Construct New YBI Substation Construct New YBI Substation West Bound On Ramp Roadway Work West Bound On Ramp Roadway Work Demolish Existing Substation and Maintenance Garage Demolish Existing Substation and Maintenance Garage Viaduct Retrofit Work Viaduct Retrofit Work

SFOBB East Span Seismic Safety Project Yerba Buena Island  New Substation

SFOBB East Span Seismic Safety Project Environmental Constraints at YBI USCG Facilities Historic Structures Substation contract

SFOBB East Span Seismic Safety Project Substation MECHANICAL ROOM ELECTRICAL ROOM OFFICE CONTROL / COMPUTER GARAGE PARKING LOT

SFOBB East Span Seismic Safety Project Substation One story 468 square meter structure including One story 468 square meter structure including  Mechanical Room major equipment – 2 air compressors  Electrical Room major equipment – kV metal clad switchgear, 1000 kV power transformer  Control/Computer Room  Office  Bathroom  Break Room  Garage  Battery Room

SFOBB East Span Seismic Safety Project Utility Work Relocate the following utilities Relocate the following utilities  Compressed Air  Overhead Electrical  Underground Electrical  Sanitary Sewer  Water  Drainage

SFOBB East Span Seismic Safety Project

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

SFOBB East Span Seismic Safety Project Glenn Fleming Mechanical Engineer Structural Design, Toll Bridge Program Structure Items

SFOBB East Span Seismic Safety Project Introduction to YBI Viaduct Structure Retrofit 3 Frames of Bridge Construction Frames 1 & 2 - West Segment Retrofit Frame 3 - WB On Ramp Approach Retrofit

SFOBB East Span Seismic Safety Project YBI Viaduct - General Plan Frame 1 & 2 - Construct West Segment Retrofit Frame 3 - Construct WB On Ramp Approach Retrofit Frame 1 Frame 2 Frame 3 Exp JT Bent m WB on-ramp SF WB off-ramp Tunnel

SFOBB East Span Seismic Safety Project Construct Concrete Seat Extensions, drill and bond dowels Typical Section Near Bent 33 Frame 1 - Typical Section Frame 1 - Typical Section Wall,typ Design Note: Floor beams are simply supported by continuous retaining walls with partial height counterfort walls. Analysis has determined floor beams are vulnerability to unseating.

SFOBB East Span Seismic Safety Project Top of Wall Construct Concrete Collars at counterforts and short columns Construct Seat Extensions Frame 2 - Typical Section Frame 2 - Typical Section Typical Section Near Bent 37 Design Note: Counterforts support short columns along the north edge of deck. Analysis has determined inadequate shear capacity of the short columns. Additionally, floor beams are vulnerability to unseating.

SFOBB East Span Seismic Safety Project Strengthen Counterfort and Short Column - Frame 2 Construct counterfort & short column concrete collars Construct counterfort & short column concrete collars Drill & pressure grout Drill & pressure grout

SFOBB East Span Seismic Safety Project Frame 3 - Typical Section Typical Section Bent Strengthen (encase) north-side viaduct bent caps. 2. Strengthen (encase) columns located beneath ramp. 3. Strengthen (encase) longitudinal girder beneath ramp. 4. Strengthen (encase) and tie-down, ramp column footings. 5. Construct seat extension and bolster at ramp abutment diaphram. 6. Extend bent caps to ramp columns. 7. Construct shear wall and retaining walls. Demo and widen deck from bent 41 to just beyond bent 42 (not shown) Design Note: Analysis has identified that the caps and girders are not capable of resisting the column plastic moment.

SFOBB East Span Seismic Safety Project Remove existing Caltrans electrical substation and garage, and reconstruct substation Remove existing Caltrans electrical substation and garage, and reconstruct substation Substation Relocation WB On-ramp to SF Bent 47 Note proximity to WB ramp

SFOBB East Span Seismic Safety Project Retrofit Contract Item List & Quantities

SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003

SFOBB East Span Seismic Safety Project Civil Rights Olivia Fonseca Assistant Deputy Director

SFOBB East Span Seismic Safety Project Civil Rights for information about Doing Business with Caltrans Disadvantaged Business Enterprise (DBE) Program Small Business Services Business Enterprise Program call (916) or access Small Business/Disabled Veteran Business Enterprise Services call (916) or access

SFOBB East Span Seismic Safety Project SFOBB East Span Replacement Contracts Advertising & Award Process Overview Presented by Kris Kuhl February 5, 2003

SFOBB East Span Seismic Safety Project Purpose of this Presentation Provide you with information about Caltrans contract advertising and award process for the Yerba Buena Island Substation and Viaduct Retrofit Contract of the San Francisco/Oakland Bay Bridge East Span Replacement Projects Provide you with information about Caltrans contract advertising and award process for the Yerba Buena Island Substation and Viaduct Retrofit Contract of the San Francisco/Oakland Bay Bridge East Span Replacement Projects Answer your questions Answer your questions

SFOBB East Span Seismic Safety Project Caltrans Mission Our mission is to improve mobility across California The Office Engineer contributes to Caltrans mission by providing construction contracts that are: The Office Engineer contributes to Caltrans mission by providing construction contracts that are:  Complete, biddable and buildable  Competitively bid  Meeting legal requirements  Open to all licensed contractors

SFOBB East Span Seismic Safety Project Contract G4 Project Goals l This is a federally-funded project l The Disadvantaged Business Enterprise (DBE) goal for this project is 13 %. l Pre-Bid meeting on February 5th

SFOBB East Span Seismic Safety Project Award Process Award (about 30 days) Open Bids 2/25/03 Advertised Release Date 12/09/02 YBI Substation & Viaduct Retrofit Project Advertising to Award Timeframe 4 Weeks Prior to Releasing Bid Documents Advance Advertising Distribute Bid Documents to Bidders (11 weeks)

SFOBB East Span Seismic Safety Project Public Bid Opening Bids for this project will be opened and read in a public forum l On Tuesday, February 25 at 2 PM in Sacramento in Room 100 at 1120 N Street Immediately Following Bid Opening: l Bid amounts will be verified l Preliminary bid results posted at (916) and on the Internet ( l Bid summaries will be mailed to all bidders

SFOBB East Span Seismic Safety Project This Contract will use A+B Bidding To determine the lowest monetary bidder, Caltrans will calculate the bid amount as follows: To determine the lowest monetary bidder, Caltrans will calculate the bid amount as follows: “A” contract items total + “B” number of contract working days bid by contractor multiplied by a dollar amount per day determined by Caltrans A+B will determine the total bid for comparison purposes only A+B will determine the total bid for comparison purposes only

SFOBB East Span Seismic Safety Project l We anticipate this project will take about 30 days to award after bid opening l Before awarding a contract, we verify: l Bid is responsive and complete l Bid security is provided and correct l All forms are complete and correct l Contractor is properly licensed l Verify Compliance with DBE requirements l Receipt of DBE commitment forms by 4th day l All protests addressed Award Process

SFOBB East Span Seismic Safety Project Other Requirements Escrow of Bid Documents Escrow of Bid Documents  The 3 low bidders are to escrow their bid documents on March 4 between 1 and 2 PM  See the Special Provisions for more information

SFOBB East Span Seismic Safety Project Contract Execution & Approval After Contract Award After Contract Award  Contractor has 8 days to sign and return contract for Caltrans approval  Executed Documents (returned) Contract signature page signed Payment and Performance bonds included & signed  Signed/Approved by Caltrans Begin Construction! Begin Construction!

SFOBB East Span Seismic Safety Project Internet Services Provided sc/oe/ sc/oe/ Information on Projects Released for Bid Information on Projects Released for Bid Weekly Advertisements for Bids Weekly Advertisements for Bids Electronic copies of project plans & specifications Electronic copies of project plans & specifications Bidder Assistance Bidder Assistance Bid Opening and Award Information Bid Opening and Award Information

SFOBB East Span Seismic Safety Project Conclusion l We thank you for your time and interest. l If you have any questions or suggestions, we would like to hear them We look forward to doing business with you soon!

SFOBB East Span Seismic Safety Project Breakout Group Objectives: Provide opportunities to meet and work together with other attendees Highlight the importance of safety on construction jobs Share safety related project experience