FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT IKI, 13 October.

Slides:



Advertisements
Similar presentations
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
Advertisements

Space Exploration Mars Rovers, Apollo program, Voyager satellites, and SETI All Presented by the Peter C Period: 2 (two) As in 1+1=2 Or 2x1=2 ®
International Space Station Dane Fujinaka Noa Bryan.
Chubaka Producciones Presenta :.
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Chapter 1 Current Space Missions. Cassini-Huygens Website: Launch date: October 1997 Mission: This.
Space Transportation NASA is responsible for regulating and directing the entire US space program Space vehicles take us beyond the earth Currently consists.
Probes Anna and Hanna Euclid Middle School Period 6 Space Odyssey.
Liulin-F charged particle telescope for radiation environment investigation aboard Phobos-Grunt interplanetary spacecraft SES 2010, Sofia, 2-4 November,
Space Missions Finding a way to coexist in the future.
Space Exploration Tools Rockets Space Shuttle Artificial Satellites Space Probes International Space Station Telescopes.
Joshua Hey Period 9 Space Exploration 10/22/13. The United States launches Skylab Occupied by three crews Next few years will be an important arena for.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Samara State Aerospace University (SSAU) Samara 2015 SELECTION OF DESIGN PARAMETERS AND OPTIMIZATION TRAJECTORY OF MOTION OF ELECTRIC PROPULSION SPACECRAFT.
Space Exploration Timeline
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
Solar System Physics Group Open Day Manuel Grande Aberystwyth in Space – the Moon ExoMars Chandrayaan STEREO Bepi VEX Solar B SDO LoFAR IHY.
China & Space Jordan Granier Pol 337 Gang Guo 4 November 2014.
Engineering Means having to deal with failure Missions to Mars as an example of try, try, try again…
Chapter 24 Space Vehicular Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Brief introduction of YINGHUO-1 Micro-satellite for Mars environment exploration J. Wu, G. Zhu, H. Zhao, C. Wang, L. Lei, Y. Sun, W. Guo and S. Huang Center.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
1960: October 10 – Marsnik 1 (also known as Korabl 4 and Mars 1960A) Soviet Union's first attempt at a planetary probe. Launch failure. 1960: October.
Write 3 three facts you already know about Mars. WHAT YOU KNOW.
Mars Exploration Rovers (MER) Entry, Descent, Landing, and Deployment.
Mars Rovers By Taylor Sokolovic.
Planets Distances and Scientific Notation
PHOBOS - GRUNT Phobos Sample Return Mission 1. Basis for choice, goals and methods of study.
29 August, 2011 Beijing, China Space science missions related to ILWS in China
Space Station Will it be accessible for You and Me?
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Exploration of Mars By: Micah Cluey. Facts ● The exploration of mars has taken place over hundreds of years, beginning in earnest with the invention and.
Low Thrust Transfer to Sun-Earth L 1 and L 2 Points with a Constraint on the Thrust Direction LIBRATION POINT ORBITS AND APPLICATIONS Parador d'Aiguablava,
Unit 4 Lesson 3 History of Space Exploration Copyright © Houghton Mifflin Harcourt Publishing Company.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
Learning Goals  I will be able to recognize the three main battles of the Space Race.  I will be able to explain the pathway to putting a man on the.
Human Exploration of Mars Design Reference Architecture 5
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Interlude  Viking mission operations ended in the early 1980s  Viking missions gave scientists the most complete picture of Mars to date. What does this.
By Maia :). Mission Profile page 1  Mars 3 was launched towards Mars from a Tyazheliy Sputnik Earth orbiting platform. A mid-course correction.
Jupiter and Saturn. Semimajor axes of orbits: 5.2 au (Jupiter) and 9.5 au (Saturn)
Modern Exploration Mars Global Surveyor  “The mission will provide a global portrait of Mars as it exists today…This new view will help planetary scientists.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
Rockets and Space Exploration. Traveling into Space Rocket – a device that expels gas in one direction to move in the opposite direction. – The first.
11.3 The Exploration of Space and Technologies used for Space Exploration Human understanding of Earth and its place in the universe has evolved as technology.
SPACE: THE FINAL FRONTIER.
SPACE: THE FINAL FRONTIER Sputnik 1 October 4, 1957 First man-made object to orbit Earth, launched by the U.S.S.R., and remains in orbit until January.
Unit 4 Lesson 3 History of Space Exploration
JUpiter Icy Moons Explorer (JUICE)
Space Station-The International Space Station is a satellite that serves as a home for the crew while they perform scientific research and experiments.
Space Transportation Space vehicles take us beyond the earth
13-block rotation schedule
ThunderStruck Destination Mars 2022 by Robert Brand.
The space race Record RED info only!.
By: Faith Yizek 9H and Alex Neacsu 9M
McDonald’s calendar 2007.
Proud As A Peacock! We are very proud of__________________
By : Jayda Myers and Madi Soos
Main information on the «WORLD SPACE OBSERVATORY» project
McDonald’s calendar 2007.
Chang’e 5 Mission Chinese Lunar Exploration Program (CLEP)
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
2015 January February March April May June July August September
Presentation transcript:

FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT IKI, 13 October 2010 M. Martynov Deputy General Designer Moscow Solar System Symposium

"PHOBOS-GROUNT" MAIN MISSION PARAMETERS Investigation of Phobos's substance delivered to the earth in laboratory conditions; Investigation of Phobos and Mars; Realisation of joint researches with the Chinese microsatellite Launch siteBaikonur Launch dateNovember 2011 Launch vehicle"Zenit-2" Earth-Mars flight duration10 – 11.5 months Lift-off from PhobosFebruary – March 2013 Mars-Earth flight duration10.5 – 11.5 months Date of arrival to the EarthAugust 2014 Total mission duration~ months Mass of scientific equipment50 kg Mass of Phobos soil samples0.2 kg "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

MISSION PROFILE "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

MAIN PARAMETERS OF THE "PHOBOS GROUNT" SC ParameterValue SC mass, including: – main propulsion (fuelled) – flight module (fuelled) – return vehicle (fuelled) – return capsule – Spacecraft YH kg kg kg 285 kg 11 kg 115 kg Frequency range of communication line: – flight module - Earth – return vehicle - Earth Х -band Information rate at maximal distance: – flight module – return vehicle 4 bit/s, 16 Kbit/s 8 bit/s Solar arrays area: – flight module – return vehicle 10 m m 2 "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT Return capsule Return vehicle Flight module SC YH-1 Main propulsion Jettisonable block of tanks Truss

"PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT RETURN CAPSULE Basic state: RC braking in atmosphere of the Earth performs only by aerobraking without use of parachute system which as has shown world experience, can fail; Applied form of the return capsule which aerodynamic characteristics are well known; RC landing performs on testing area "Sary-Shagan" which is equipped by necessary measuring instruments for definition of a landing point of RC which do not have active instruments such as a radio beacon.

"PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

2009

"PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT Soil type Manipulator of LAManipulator of IKI prehensile typepenetration type collect type Small dispersed (sand) +++ Small Stone ++ Only together with sand Massive rock -+-

"PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

Testing model Structure mockupAntenna mockupLanding device Burn test of propulsion subsystem

Autonomous thermovacuum test of return module Integrated thermovacuum test of return module Autonomous thermovacuum test of flight module Integrated thermovacuum test of flight module Thermovacuum tests "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

Static test Transportation loads Aircraft landingCentrifugeVibration test Vibrostatic tests "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT

Milestone Soil sampling development January December 2010 Flight module electrical tests October – November 2010 Chinese microsatellite delivery20 December 2010 Final assemblage of a space craft, electrical tests December 2010 – January 2011 Electrical tests in vacuum chamberFebruary - march 2011 Final operationsJuly – august 2011 Operations in Launch site September 2011 LaunchNovember 2011

Thank you! "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT