Status of the ITS Alignment Monitoring System First results By Bjørn S. Nilsen The Ohio State University.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Image reconstruction and analysis for X-ray computed microtomography Lucia Mancini 1, Francesco Montanari 2, Diego Dreossi 3 1 Elettra - Trieste 2 A.R.P.A.
ITS TGeo geometry Status and challenges By Bjørn S. Nilsen The Ohio State University.
Pore Detection in Small Diameter Bores The University of Michigan, Ann Arbor NSF Engineering Research Center for Reconfigurable Manufacturing Systems.
Logging and Replay of Go Game Steven Davis Elizabeth Fehrman Seth Groder.
1 Installation of Delphi Frame  ITS Installation.
CS290 Spring 2000 Slide:1 Structured Light for Laparoscopic Surgery CS290 Computer Vision Jeremy Ackerman CS290 Computer Vision Jeremy Ackerman.
Efficient Path Determining Robot RIT Computer Engineering Senior Design Project Jamie Greenberg Jason Torre October 26, 2004 A motorized robot will navigate.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
SL Introduction to Optical Inspection1. Introduction to Optical Inspection Helge Jordfald Sales & Marketing Manager Tordivel AS – Norway.
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
Performance of SPIROC chips in SKIROC mode
The Macinosh Computer OSX. The Set up This is a view of your computer keyboard, monitor, and printer.
Autonomous Tracking Robot Andy Duong Chris Gurley Nate Klein Wink Barnes Georgia Institute of Technology School of Electrical and Computer Engineering.
ITAM CAS, IEAP CTU IWORID 2004Glasgow, th July IWORID 2004 OPTIMIZATION OF X ‑ RAY DYNAMIC DEFECTOSCOPY USING MEDIPIX-2 FOR HIGH FRAME RATE READ-OUT.
Real-Time Phase-Stamp Range Finder with Improved Accuracy Akira Kimachi Osaka Electro-Communication University Neyagawa, Osaka , Japan 1August.
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Recent Progress in X-ray Emittance Diagnostics at SPring-8 S. Takano, M. Masaki, and H. Sumitomo * JASRI/SPring-8, Hyogo, Japan SES, Hyogo, Japan *
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
ipno.in2p3.fr Badesi - Sardinia - May 2006IPNO-RDD-Jean Peyré1 1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré Badesi - May.
Automated Geometric Centroiding System Matthew Shanker, Eric Harris, David McArthur; Faculty Mentor: Dr. James Palmer; Client: Jim Clark Department of.
Installation Review March ‘03 L.Simonetti – INFN Torino 1 ITS - FWD - beam pipe installation  Elements considered ITS (=SPD+SDD+SSD), FWD (=V0 R, T0 R,
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
Muon commissioning status and plans G.P. C. De Plano.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
1 Data Acquisition What choices need to be made?.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
IPD Technical Conference February 19 th 2008 Application: Pipette Measurement and Flash Inspection. Distributor: CPU Automation Engineer: Mike Bray.
Samantha. What is it? –It is a Wi-Fi interface for the Lego Mindstorms –It replaces the Bluetooth connection for running matches It is mostly for running.
High Speed 3D Imaging Technology
Status of New TPC( Ⅱ ) Performance Study Yohei Nakatsugawa LEPS Meeting in Taiwan.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Brainstorming on the field model: MAS activities P. Hagen, E. Todesco, J.P. Koutchouk CERN, 24 h March 2006 Field quality Working Group.
Hardware Introduction – Standard vs Q.i
1 Antonis Papanestis Laser Alignment Monitoring System (LAMS) for the RICH Laser Alignment Monitoring System (LAMS) for the RICH Andrew Macgregor 1, Paul.
Page 1 of 18 Bjorn S. Nilsen, ALICE November 16 ITS Software meeting ITS Alignment Status Plus other things By Bjørn S. Nilsen The Ohio State University.
Pepperpot Emittance Measurement System: Current Status Simon Jolly Imperial College FETS Meeting, 10/05/06.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration.
SMART, Hida and next NAGATA, SHIN’ICHI. Solar Magnetic Activity Research Telescope (SMART) The telescope was built at the Hida Observatory Kyoto University.
Using a Digital Camera Beginning to use your settings menu.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Network Topology Computer network topology is the way various components of a network (like nodes, links, peripherals, etc) are arranged. Network topologies.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Update on electron spectrometer measurements Introduction Setup, measurements carried out Some raw images Results and conclusions L. Deacon, M. Wing (UCL)
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
GSA Vehicle: G Need vendor to remove the lift gate and modify the vehicle according to the specifications outlined in the attached performance.
Investigation on tray MID 063 Back
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
2 PC troubleshooting Hardware Troubleshooting & Repairing
Assignment 8 Chess Game.
The Pixel Hybrid Photon Detectors of the LHCb RICH
眼動儀與互動介面設計 廖文宏 6/26/2009.
DESY test beam report: March 2019
Presentation transcript:

Status of the ITS Alignment Monitoring System First results By Bjørn S. Nilsen The Ohio State University

Outline ITS and ITSAMS Geometry Camera Sport measurements Camera Calibration ITSAMS raw measurements ITS geometry effects?

Camera spot analysis Camera exposure… set for best image. 25 images taken in series Image smoothing to remove intensity anomalies –Ring centers found for a series of intensity thresholds. –Remove clearly anomalies centers Return Mean center and RMS. Means & errors computed from all 25 images

Camera Resolution Pixels Camera 0, RMSx=7.39±0.18, RMSy=7.48±0.18. Camera 1, RMSx=1.91±0.04, RMSy=1.76±0.04. Camera 3, RMSx=7.52±0.24, RMSy=5.96±0.19.

Image Centers

Calibration Data taken from Test-bench setup Image centers used old algorithm Still some problems with test-bench setup

Image location Data with L3 on in solid markers Camera center at 0,0.

1/29/2008W. Riegler TB Presentation In order to explain the vertical movement of the front absorber nose by 2.4mm, the top fixation point of the FASS would have to move by d=3.7mm. It seemed very improbable that the heavy magnet crown, that the FASS is attached to, is moving at all. L3 Magnet Tests, Frontabsorber Movement 8

1/29/2008W. Riegler TB Presentation Beampipe on ITS rail Lift beampipe (ITS) before TPC movement Beampipe (ITS) hanging on TPC +1 TRD, +8 TOF  1.5*9= 14T  2.3mm expected mm B-Field tests 0.17 T 0 T 0.17 T 0.5 T 0 T 0.5 T0.5 T + dipole 0 T +1 TOF Central Beampipe vs. FA 9 ITSAMS Installed/aligned ITSAMS Realigned March

Spot position By day Clearly spot position shifted when L3 field is on. Timing correlation not 100%. images (file dates), Magnet (dcs data base).

Top View Side View Many Cables ITSAMS Mirrors

IT’S A-Side View from Mirror 0 View of Mirror 0 mounting

ITS C-side

Stress free Mounting

ITS mounting - 3 point mount - Stress Free

Status Low Voltage on USB hub improved –Better reliability of camera communications Low Voltage IP address conflict fixed ITSAMS control system still improving –Automation of image taking and analysis to come –Computation of ITS movement being debugged. Wednesday L3 magnet on, run ITSAMS

Spot Missing Camera 2 Camera 0 Camera 1 Camera 3