DZero Run IIb PMG January 28, 2003 1 Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
DZero RunIIb Director’s Review February 3, Run IIb Project Status Vivian O’Dell.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
MULTILATERAL EVALUATION MECHANISM (MEM) MEM UNIT GENERAL PROPOSALS TO THE OPERATIONAL PROCESS Second Part - Sofia I. Kosmas.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting July 10, 2008 Dean. Hoffer / Elaine McCluskey.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Preparations for a Lehman Review
ATLAS: Level-1 Calorimeter Trigger
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical status (Wood)  AOB Jon Kotcher DZero Run IIb PMG January 28, 2003

DZero Run IIb PMG January 28, Run IIb Project Organization D0 Run IIb Project J. Kotcher, Project Manager R. Partridge, Deputy; V. O’Dell, Associate; W. Freeman, Assistant M. Johnson, Technical Coordinator C. Yoshikawa, Budget Officer; T. Erickson, Administration WBS 1.1 Silicon M. Demarteau TBD Sensors R. Demina, F. Lehner Readout System A. Nomerotski, E. von Toerne QA, Testing, & Burn-in C. Gerber, TBD 1.1.3, Mechanics & Assembly W. Cooper, K. Krempetz Monitoring M. Corcoran, S. de Jong Production J. Fast, TBD Software & Simulation F. Rizatdinova, L Shabalina WBS 1.2 Trigger H. Evans D. Wood L1 Track Trigger M. Narain L1 Cal Upgrade M. Abolins, (H. Evans), P. LeDu L2  Upgrade R. Hirosky Silicon Track Trigger U. Heintz WBS 1.3 DAQ/Online S. Fuess P. Slattery L1 Cal/Track Match K. Johns Simulation M. Hildreth, E. Perez WBS 1.5 Installation R. Smith Silicon Installation Mechanical: H. Lubatti Electronics: L. Bagby, R. Sidwell Trigger Installation D. Edmunds WBS 1.4 Project Administration Administration (D. Wood) Administration (M. Demarteau) Control Systems F. Bartlett, G. Savage, V. Sirotenko Level 3 Systems D. Chapin, G. Watts DAQ/Online Management (P. Slattery) Network & Host Systems J. Fitzmaurice, S. Krzywdzinski Red: Today’s speakers Blue: New silicon co-leader will be in place Mar 1 Agreement with Alice Bean was one year, ended Aug ’02 Two silicon Level 3 subsystems need co-leaders

DZero Run IIb PMG January 28, Overview of Status  Schedule “statussed” for Dec 1-31 time period (talk by O’Dell) u Second full shot since Nov 4-8 EIR  Monthly effort reports being handled in straightforward manner u Work package assignments to individuals’ effort made by WBS Level 3 personnel in hour or two u Returned to Project Office, double-checked before sending to PPD  Lunar report cycle: u Wk –1: Effort reports finalized u Wk 1-2: Status schedule, collect monthly report information u Wk 3: Integrate information, edit reports, identify change control, discuss with project u Wk 4: Report Laboratory, hand in to DOE  First monthly report drafted (bootstrapped from NuMI report) u Overview of project status u Milestone status & summary (includes Gantt) u Narrative highlights to WBS Level 3 u Variance analysis u Cost reports s Tables to WBS Level 3, plots to WBS Level 2 s Pending final approval, only BCWS available

DZero Run IIb PMG January 28, Overview of Status  Have suggested COBRA/reporting meeting with all principals u Want to have final machinery in place in anticipation of FY03 spending approval; many details to consider, commonality: s Inclusion (or not) of R&D s Handling of pass-through s COBRA report output s Change control/variance thresholds s Timing of consultant visit s Finalize form of monthly reports s Tracking university costs s Integration of actuals s … u OPMO on board, setting it up s “Office of Project Management Oversight”  First Production Readiness Review will take place Jan 30 u “Purple Card” for silicon readout during testing, production u Does not go in final detector, used for stand-alone testing at SiDet u Was useful test bed for PRR process, worked quite smoothly

DZero Run IIb PMG January 28, Purple Card PRR  Review Committee: u C. Gerber (UIC) u J. Green (Fermilab) u K. Hanagaki (Fermilab) u S. Lager (Stockholm) u R. Lipton (Fermilab, Chair) u R. Sidwell (KSU)

DZero Run IIb PMG January 28, Some Near-Term Silicon Milestones Six Major Upcoming Silicon Milestones Project Target Date Current Forecast Baseline Date Comments Silicon Prototype Mechanical Stave Built 12/16/0312/18/031/6/03Major integration milestone – was met L2-L5 Sensors Released for Production 2/11/032/18/033/24/03Further delays expected; characterizing sensors. Should not extend to baseline date. SVX4 Released for Production7/10/038/19/0310/20/03Excellent performance of initial prototype Successful Fabrication of Electrical-Grade Pre- Production Silicon Stave* 7/17/037/24/0310/10/03Major integration milestone Successful Readout of Full Silicon Stave 10/10/0310/17/031/29/04Major integration milestone Silicon Module Production Begun 2/16/04 5/17/04Remains on track * Not a DOE L2/Director’s Milestone Forecasts remain well ahead of baseline dates

DZero Run IIb PMG January 28, Some Near-Term Level 1 Trigger Milestones Five Major Upcoming Silicon Milestones Project Target Date Current Forecast Baseline Date Comments L1 ADF shipped to Fermilab5/2/036/23/037/11/03Saclay designing, fabricating L1 cal front-end L1 Calorimeter Trigger TAB/GAB Prototype Complete 7/16/037/15/039/29/03Columbia/Nevis ADF+TAB Prototype Integration7/17/037/16/039/30/03Major integration milestone: in-situ integration summer ’03 L1 CTT Algorithm Firmware Coded & Simulated with FPGA Simulation Tools 7/17/037/11/039/15/03First major L1 CTT milestone Fabrication & assembly of L1 Trigger Cal-TRK Match MTCM complete 10/20/03 11/10/03Completion of production; based on current muon trigger cards Forecasts remain well ahead of baseline dates Level 2 trigger, online begin later

DZero Run IIb PMG January 28, Run IIb Labor  Request for full-time electronics technician for silicon made at last PMG (Dec 10) u Commissioning and maintenance of existing testing, burn-in stands u Cecil Needles joining us, first introductory tour scheduled for this week  Other technical needs covered at the moment  Project Office continually asking project to anticipate their manpower requirements u Collaboration help as well as FNAL technical staff u Lead times can be unwieldy

DZero Run IIb PMG January 28, Labor Cost Extracted from Schedule vs. Actuals (R&D) Actuals: Oct = $168.5k, Nov = $132.8k (FY03 k$) No contingency or G&A in schedule prediction Agreement quite good, but earned value is real measure (actuals, COBRA) Actuals in FY02 k$ Scheduled labor in FY02 k$ Updated for Dec/Jan as soon as information from PPD is available

DZero Run IIb PMG January 28, Comments  Significant Lab-wide parallel efforts (shutdown) never come for free, but impact on Run IIb not as serious as initially thought u Loss of IIb SiDet personnel to Beams Division ameliorated by extra effort from other project principals u Experts within DZero redirected to Collision Hall work, but for reasonably short amount of time u Inter-cryostat gaps photographed, mapped out – required for further Run IIb design work u We have no argument whatsoever with the priorities!!!  I am going to begin assuming that accelerator will run only at 396 nsec u Studies & document outlining utility of SIFT upgrade for physics at 396 nsec being completed (Bross, Hildreth, et al.) u In event SIFT is deemed to be unnecessary, personnel on SIFT project should be redirected within DZero u Have particular interest in integrating P. Rubinov into group of Run II(b) electronics experts – sore and obvious need u Formal statement on 132 from Lab would be useful u Will discuss privately with Mont, et al.

DZero Run IIb PMG January 28, Comments  Jan trip to France to discuss terms of Saclay involvement in Level 1 Calorimeter Trigger very productive u Responsible for front-end (ADF) trigger boards – ADC/Digital Filtering u LHC commitments might compete with proper Run IIb completion u Saclay has agreed to seek extension of their involvement beyond initially proposed 2005 time scale  Things like: u Delays in obtaining FY03 spending approval u Further bottoms-up evaluations of Run IIb project  …send very powerful message. Make it increasingly difficult to maintain committed core of upgrade groups and personnel.

DZero Run IIb PMG January 28, Conclusions  Project making steady, solid technical progress  No change control thresholds yet encountered, but SVX4 is on (schedule) cusp  Project tracking machinery being continually developed & shaken out  COBRA and its implementation an important ingredient to nail down now  Lead time associated with labor requests might grow into a concern as project heats up  Will try on our end to make our requests as early on, and as well-defined, as possible  Cultural stasis exhibited by all entities poses a continuous difficulty – schedule drives these projects!