0 RPS Program and Progress Senate Energy Committee December 15, 2011.

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Advertisements

Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
Department of Water and Power City of Los Angeles Renewables Portfolio Standard (RPS) Master Plan Building Out Opportunities October.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Renewable Energy Vermont Vermont Perspectives, Activities, and Plans September 21, 2005 J. Riley Allen Vermont Department of Public Service.
Pasadena Water & Power 2009 Integrated Resource Plan Public Meeting #3 December 17, 2008.
Greening The Grid Through Community Choice Aggregation US EPA Webinar March 6, 2012.
The Role of Renewables in Your Future Resource Portfolio APPA National Conference June 12, 2006 Colorado Springs Utilities’ Approach Diane Johnson General.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
An Overview of Our Regulatory Proposal
Pasadena Water & Power Intermountain Power Project Amend the Existing Contracts Participate in Renewal Project Pasadena City Council Item 11 July 20, 2015.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Optimizing Greening Schools for a Carbon Constrained Future Presented to: The Association of California Construction Managers Presented by: Stephanie R.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
First Solar, Inc. Kingbird Solar Project Power Purchase Agreement
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
ESB Presentation Oireachtas Committee 2 nd November 2005.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
1 Managing Renewables Integration Valerie Fong Utilities Director Power Association of Northern California September 17, 2013.
Pasadena Water and Power 2009 Power Integrated Resource Plan Update August 16, 2010.
Melissa Seymour Midwest Market Structure Iberdrola Renewables June 7, 2010 Mid-America Regulatory Conference Kansas City, MO Integrating Renewables on.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 Clean Energy, A Strong Economy, and a Healthy Environment William J. Keese Western Governors’ Association June 1, 2007 European Insulation Manufacturers.
New Jersey Board Of Public Utilities Office of Clean Energy Air Innovations - Chicago August 10,2004 NJBPU - OCE New Jersey’s Solar Program An Integrated.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
APPA Joint Action Workshop Tucson, AZ January 9, 2006 JOINT ACTION STILL RELEVANT, AFTER ALL THESE YEARS JOINT ACTION STILL RELEVANT, AFTER ALL THESE YEARS.
California Takes Charge: Policies and Incentives for Energy Storage February 11, 2015 Rebecca Feuerlicht, SGIP Project Manager, Center for Sustainable.
Southern California Public Power Authority Director of Resource and Program Development Ted Beatty September 29,
Department of Water and Power City of Los Angeles Planning to Meet the Challenge “Greening LA” February 2007.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
Oregon State Bar Association Environmental & Natural Resources Annual Conference October 8, 2010 Athena M. Kennedy Renewable Energy Law Update 2010.
What do we mean by “Energy?
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Southern California Public Power Authority’s (SCPPA)
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Presentation to Select Committee on Economic Development
APS Renewable Energy Overview and Highlights 2010 Southwest Renewable Energy Conference Santa Fe, New Mexico Greg Bernosky – Renewable Energy Planning.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Power Supply Transformation IEPA 2013 Annual Meeting September 27, 2013 January 2013.
0 Transformation of a Power System September 21, 2012.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Greenhouse Gas Initiatives: progress and perspective Sandra Meier Environmental Energy Alliance of New York.
March 24, 2016 Kentucky Municipal Energy Agency Consideration of Renewables.
Michigan Public Power Agency Wind Energy Supply Agreement
“Green Growth and Sustainable Competitiveness in North America”
Affordable & Available: Large Scale Clean Energy for New England
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Making Green Tariffs Work for Your Customers
Presentation transcript:

0 RPS Program and Progress Senate Energy Committee December 15, 2011

AGENDA - Presentation Topics RPS Overview Local Solar Programs Feed In Tariff Solar Incentive Program Utility Program Coal Divestment 1

2 City requests LADWP 20% by 2017 State Goal 20% by LADWP Policy: 13% by % by 2017 SB2 (1X) legislatively enacts 33% RPS target 2011 LADWP accelerates RPS goal to 20% by 2010 State Exec Order: RPS 33% by 2020 LADWP IRP RPS Goal of 33% by 2020 LADWP RPS policy changed to 35% by 2020 SB106 accelerates state goal to 20% by 2010 RPS Policy Amendment and Enforcement Program Adopted RPS Policy History In 2002, the California Legislature passed Senate Bill 1078 that established the California Renewables Portfolio Standard, Progressively, the RPS goals have increased: Timeline 2

SB2 (1X) RPS Compliance Targets 2011 – 2013 (on avg.) December December % 25% 33% YEAR RETAIL SALES On Dec. 9, 2011, the California Renewable Energy Resources Act, SB 2 (1X) became effective 3

4 RPS Principles Geographic & resource diversity of projects is important Maximize use of existing LADWP transmission & land Maintain options/flexibility Regionally “cluster” renewable projects to achieve operational efficiency Ownership of projects using proven technology is part of the current RPS Policy

5 Renewable Projects Regional Map Columbia River Corridor: PowerEx Small Hydro Pebble Springs Wind Willow Creek Wind Linden Wind Farm Windy Point Wind Columbia River Corridor: PowerEx Small Hydro Pebble Springs Wind Willow Creek Wind Linden Wind Farm Windy Point Wind Milford Wind I / II Pleasant Valley SW Wy Wind STS Transmission Gas Pipeline – Landfill / Biogas Small Hydro – Aqueduct Pine Tree Wind, Solar (future), Geothermal (Future) Barren Ridge-Inyo Transmission (Future) Pacific DC Transmission Local In-Basin Solar Mead Transmission Solar (Future) Mead Transmission Solar (Future) Imperial Valley Geothermal (Future), Solar (Future)

Renewable Resource Portfolio Type of ResourceEnergy Mix Renewable Portfolio Standard (RPS) 6

Renewable Resource Portfolio Renewable Portfolio Standard (RPS) 7

LADWP RPS Progress 8

Windy Point LADWP Wind Projects – Site Photos Pine Tree Milford Phase 1 9

LADWP Wind Projects – Site Photos (continued) Willow Creek - Oregon Pleasant Valley - Wyoming Linden Ranch - Washington Pebble Springs - Oregon 10

PROJECTS IN SERVICE PROJECTS UNDER CONSTRUCTION PROJECTS PLANNED DEFICIT GOAL 33% RPS Deficit 11

12 Lessons Learned System Integration for renewables is an important consideration. BPA in the Northwest, LADWP system in CA and UT Transmission / Energy Delivery is a challenge. Firming/Shaping products are useful to maximize transmission usage Weather forecasting is crucial Benchmarking project performance and O&M costs Renewable technology types have different value considerations PPA contract negotiations are difficult and time-consuming RPS must be an integral part of the IRP process

RPS by technology LADWP Energy Mix Note that Coal is being reduced from 39% to 27% as shown Projected 2020 Resource Mix 13

Future LADWP Energy Projects Solar: In-Basin Solar Pine Tree Solar Adelanto Solar Owens Valley Wind: Pine Canyon Geothermal: Imperial County (Phase I) Owens Valley Power Purchase Agreements: Over 200 responses to Jan 2011 RFP Solar, Geothermal, Wind, and Biogas Transmission Upgrades: Barren Ridge Renewable Energy Project 14

Resource Availability Transmission Access CEQA Environmental Constraints Permitting/Zoning Regulatory Uncertainty Endangered Animals Development Challenges Siting/Land Issues Mojave Ground SquirrelDesert Tortoise Mojave Fringe-Toed Lizard 15

Balancing RPS goals with system resource needs Once through Cooling – OTC (316b) Aging Distribution System Infrastructure Coal Transition (SB1368 Compliance) Continued economic downturn with little load growth Energy Efficiency investments Maintain grid reliability with intermittent energy Transmission Investments Meeting SB2 (1X) provisions: buckets Local Distributed Energy Need to balance multiple regulatory compliance mandates within reliability and resource constraints Getting to 33% Renewable Energy Levels 16

17 LADWP – An Early Leader in Local Solar Generation Started net-meter incentive program in 1999 (one of first programs in the state) $150 Million Commitment $55 Million Spent (10 MW) Prior to SB1 Initiative (Oct 2007)

18 LADWP’s SB1 Program: Higher rebates than required by State In 2011, LADWP doubled annual investment $313 million capped program through 2016 (SB1 compliant) Pays customers $288 million for incentives Average budget - $30 million in solar rebates annually through 2016 Seeks to achieve as many MWs as possible Uses 10-step declining scale based on performance of solar installation LADWP set incentives $0.70 to $1.70 per watt higher than State minimum to attract customers because of our lower rates Local Solar Programs SB 1 Implementation

19 Local Solar Programs Cumulative Budget and Requested Dollars

20 *Estimated Incentive FundsMegaWatts Installed Through Dec. 1, 2011 $110 million SB1*, $165 million total 42 Requested and in Process$91 million*40 Remaining Unrequested SB1$87 million48 Total$288 million130 4,520 Operating Solar Systems, with approx. 1,550 in process Solar Incentive Program Status as of Dec. 1, 2011

21 Comply with state mandate – Senate Bill 32 Create an additional solar power funding mechanism to augment the Solar Incentive Program Provide a reliable, cost effective, dependable, sustainable, and streamlined program Price Discovery Encourage electrical generation from renewable resources close to load centers Balance renewable portfolio for reliability via geographic and technology diversity Provide local economic development Local Solar Programs FiT Program Objectives

22 Over 1 MW AC currently installed on City Roofs 2 MW more will be constructed in MW AC Adelanto Solar Project is in Construction – Completion due in June MW AC Pine Tree Solar Project scheduled for construction from March to Sept Both Adelanto and Pine Tree Solar Projects used ARRA subsidized financing Local Solar Programs Utility Built Solar

Coal Divestment 2011 Power Resource Mix 23

Coal Divestment 2030 Power Resource Mix 24

Coal Divestment Replacement Portfolio for Navajo Coal 25

MW Output 90% Capacity Factor LADWP gets 44% to 66% Until participants Other Key Assets: Southern and Northern Transmission Systems Coal Divestment IPP Coal

Questions or Comments? 27