Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

EMS Checklist (ISO model)
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
More CMM Part Two : Details.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
Continuous Value Enhancement Process
Fermilab Environmental Management System (EMS)
Overview of Key Rule Features
Gerald Whitney Operating Experience Program Coordinator Presented May 5, 2010 DOE OEC Workshop - SLAC National Accelerator Laboratory "Lessons from the.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Quality Assurance/Quality Control Policy
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
APPLIED LOGISTICS The Productivity Improvement Program for Warehousing and Transportation.
TRP Chapter Chapter 4.2 Waste minimisation.
Effective Methods for Software and Systems Integration
CS 4310: Software Engineering
Formal Methods 1. Software Engineering and Formal Methods  Every software engineering methodology is based on a recommended development process  proceeding.
Introduction to Information System Development.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Integrated Capability Maturity Model (CMMI)
Integrity Management Inspection Process Don Moore, OPS Central Region.
Server Virtualization: Navy Network Operations Centers
1 Systems Analysis and Design in a Changing World, Fourth Edition.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Dr. Ralph R. Young Director of Software Engineering Systems and Process Engineering Northrop Grumman Information Technology (703)
ISO OPERATIONAL CONTROL
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
ISO STRUCTURE AND RESPONSIBILITY. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Michael deLamare Requirements Management Program Functions R-9.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Dispensary and Administration Site Information Presentation.
Bechtel National Inc. 1 Engineering Maintains Quality by Using Error Precursors Presented September 12, 2006 DOE Integrated Safety Management Best Practices.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Waste Treatment Plant Project Innovation in Design The ISM Process at the Hanford Tank Waste Treatment and Immobilization Plant John Hinckley August, 2009.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
7 Strategies for Extracting, Transforming, and Loading.
ISO Registration Common Areas of Nonconformances.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
ISM Best Practices Workshop Aurora, CO. [September 13, 2006] Performing Work Within Controls – Fieldwork Supervision A Panel Presentation and Discussion.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Session 6: Data Flow, Data Management, and Data Quality.
10-1 McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved.
Assessing Logistics System Supply Chain Management 1.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
1 Ambient Monitoring Program PM 2.5 Data Lean 6 Sigma Air Director’s Meeting May 2015.
Human Error Reduction – A Systems Approach.
Sample Fit-Gap Kick-off
Presentation transcript:

Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices Workshop Jim Hummer Configuration Management Bechtel National, Inc. Hanford Waste Treatment and Immobilization Plant

2 WTP is the Solution to Hanford Tank Waste Cleanup Legacy waste from WWII and Cold War production 53 million gallons of radioactive and chemical waste Waste is stored in 177 underground storage tanks 67 of the tanks have leaked one million gallons of waste Left unchecked, the waste could reach the Columbia River WTP is fundamental to cleaning up nuclear waste See for additional information on WTP

3 WTP is DOE’s Largest Capital Procurement Located in the heart of the DOE Hanford Site Three major nuclear facilities for conditioning and vitrifying the waste An analytical laboratory Electric, steam, water, and air utilities Operations and maintenance buildings See for WTP Facility Fact Sheets

4 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Lab

5 Software Applications Streamline Production Several integrated software applications share information Engineering Procurement Construction Maintenance Business Services

6 Component Information Starts in CIS Create and assign unique component identification numbers to equipment, valves, pipelines, and in-line components Associate quality, safety, and technical data with the components Establish component-to-document relationships CIS did not exist before the WTP Project. The Component Information System is a database application fully integrated with CAD design software to:

7 CIS Error Rates are Low, but Expectations are High Our target is achieve zero errors in critical data fields Over 71 thousand components are managed in CIS Over 2.9 million data fields are associated with these components Information is exported to eight downstream applications Critical data are monitored and action taken weekly When the error rate >1%, additional corrective action is initiated. An error is any data field that is incorrect, incomplete, or inconsistent with issued design documents. Critical data are associated with safety, environmental compliance, and quality

8 Eliminating Errors Calls for a New Approach Significant error reduction was realized from: Modifying work processes Revising procedures Software modifications Additional error reduction is a management objective HPI — Human performance improvement is the tool

9 HPI Provides the Insight to Eliminate Errors Corrective action is used to fix errors HPI is used to fix the conditions that cause errors The CIS HPI uses a Behavioral Engineering Model (BEM) diagnostic tool recommended by the Society of Human Resource Management (SHRM) Higher Lower Performance Results Knowledge Capacity Motives Incentives Resources Information Impact Cost Lower Higher Leveraging the Solution Leveraging the Solution (Adapted from ISPI, 2001, p. 6.3).

10 BEM Helped Define our Analysis Process Key activities of the HPI analysis include: Validate that problems are the consequence of human performance errors Develop and tailor lines of inquiry to identify the conditions that cause those errors Interview the users of the software applications Consolidate conditions identified in interviews Analyze for BEM system factors - information, resources, and incentives, and define corrective actions

11 Validate Conditions are Human Performance Errors Adverse condition reports were reviewed to determine if errors were due to human performance, the work process, or software. The analysis team found examples of human error One skill-based error Several rule-based errors Several knowledge-based errors Errors committed ranged from inattention to detail to necessary violations to get the job done in spite of work process and software limitations.

12 Tailor Lines of Inquiry to the User Lines of inquiry were designed to derive information that could be analyzed to determine What working steps are followed What knowledge is required What expectations are communicated to the user What influences may be present in the work environment Seeking to understand what those who use CIS understand when doing their work was the goal for discovery.

13 Find the Right People to Interview Fourteen users were interviewed Interview candidates were selected from all CIS users User picked to vertically cut through the work flow process Users represented both good and bad performers The number of interviewees was based on ANSI/ASQC Z1.4 to obtain a statistically valid sample size

14 Identify the Conditions that Cause Errors Conditions identified from interviews were combined and consolidated to identify less than adequate system factor. The BEM analysis determined: 1. Information available to CIS users is inadequate –Users could not identify what procedural requirements apply to CIS –Shared work processes are not adequately defined –Procedure do not adequately address the role of automation –Users are not always aware of procedure changes

15 Identify the Conditions that Cause Errors (continued) 2. Resources available to CIS users is inadequate –Users do not understand downstream use of CIS information –The CIS users guide is not kept up to date –Schedule priority influences data quality 3. Incentives are not used to improve CIS users human performance to prevent errors –Data discrepancy reports are not used to motivate users –Discretionary rewards are used inconsistently to recognize performance Corrective actions were developed with responsible management to correct or eliminate the conditions found

16 Recommendations  Four information recommendation for procedures and training  Three recommendations to improve resources available to the users  Two recommendations to apply incentives in the work process  Three OTHER recommendations  One lesson learned submitted

17 Conclusion The goal of zero data errors continues to point to additional areas of improvement that cannot be reached by process, procedure, and software modifications without considering conditions that affect human performance. HPI analysis disclosed conditions, that when altered or eliminated, will benefit all users, and reduce errors in CIS.

18 Summary Human Performance Analysis was a success because of upfront planning 1. Tailored lines of inquiry helped extract most useful information 2. The many interviewees, and differing roles in the work process, reinforced what conditions affected performance 3.The Behavioral Engineering Model used helped structure the analysis The team and management are confident that corrective actions identified will help us achieve zero errors.