Aims Community College Luminis Migration Bill Waggoner.

Slides:



Advertisements
Similar presentations
Paul Roberts – Enterprise Mobility Specialist
Advertisements

Internet Information Server 6.0. IIS 6.0 Enhancements  Fundamental changes, aimed at: Reliability & Availability Reliability & Availability Performance.
Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 1.
{ Making Microsoft Office work for you Organizing Your Life at work and home in the Cloud Presented by: Matthew Baker (321)
Futures – Alpha Cloud Deployment and Application Management.
Hosted/Cloud Solution University of Northern Colorado.
CNIL Report April 4 th, CNIL Report (Apr 4 th, 2005) Two Major Goals: –Improvement of Instructional Services –Strengthening research IT infrastructure.
Virtual techdays INDIA │ august 2010 Building ASP.NET applications using SQL Server Compact Chaitanya Solapurkar │ Partner Technical Consultant,
Contributed by Chandra [Oracle Apps Tech Specialist] - oracle.anilpassi.com Discoverer 10g Migration Plan.
Methodologies, strategies and experiences Virtualization.
By Cory G Stevenson.  Back ground in general IT, accounting and business consulting  Currently work as a Database Engineer for Hyland Software  Blog:
Information Technology at Emory Information Technology Division Technical Services IT Briefing Agenda 7/15/04 PS Support Overview June Action Items TS.
Margaret Kubitschek, Solution Architect Sam Brewster, Customer Delivery Manager Dennis Keating, Account Executive Siemens PLM Software19 March 2010 Teamcenter.
Oracle Application Server 10g (9.0.4) Recommended Topologies Pavana Jain.
Clarity Educational Community Get the Results You Need When You Need Them Transitioning to CA PPM On Demand Presented by: Joshua.
INDIVIDUAL ACHIEVEMENT. EDUCATIONAL EXCELLENCE. ADMINISTRATIVE INNOVATION. INSTITUTIONAL PERFORMANCE. 1 Luminis and external Presented by:
The Cost of Cheap Understanding Your IT Investment Options.
Vace Kundakci CSG Workshop May 2003.
UST Google Apps Pilot. Introductions Agenda: Welcome! Introduce IRT Project Team Project Overview Expectations Instructions Help & Support Questions.
Get ready for EBS Release 12! Tasks to complete now to ease R12 upgrade process Oracle Open World October 13, 2009 Presenter: Sandra Vucinic – VLAD Group,
Eric Westfall – Indiana University James Bennett – Indiana University ADMINISTERING A PRODUCTION KUALI RICE INFRASTRUCTURE.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Luminis 4.x Upgrade Checo Fall 2008 Meeting Sept 22-24, 2008.
A Community of Learning SUNGARD SUMMIT 2007 | sungardsummit.com 1 Setting up a Luminis Test System Presented by: Michael Barsic Savannah College of Art.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Overview Scale out architecture Servers, services, and topology in Central Administration.
Educating Professionals Creating and Applying Knowledge Engaging our Communities IGeLU 2014 Alma Panel : View from the early adopters Jenny Quilliam Manager,
The Big Green Thingy – A Case Study in Data Warehousing Allison Lobato, DBA Enterprise Data Warehouse Department of Technology Services Denver Public.
…. PrePlanPrepareMigratePost Pre- Deployment PlanPrepareMigrate Post- Deployment First Mailbox.
Open Search Office Web Services Database Doc Mgt Sys Pipeline Index Geospatial Analysis Text Search Faceting Caching Query parsing Clustering Synonyms.
Workshop Summary (my impressions at least) Dirk Duellmann, CERN IT LCG Database Deployment & Persistency Workshop.
Taiwan APT OSM Sizing. THE SIZING ESTIMATES CONTAINED IN THIS DOCUMENT ARE BASED UPON THE ASSUMPTIONS OF PROPER APPLICATION CONFIGURATION AND TUNING,
Universidade Fernando Pessoa UFP Tools Development Nuno Fernandes Luís Borges Gouveia Feliz Ribeiro Gouveia.
Deploy With Confidence Minimize risks Improve business output Optimize resources.
A Community of Learning SUNGARD SUMMIT 2007 | sungardsummit.com 1 LEAPing with Luminis Presented by: Bob Coon Luminis Technical Services SunGard Higher.
OS DeploymentApp Deployment Infrastructure Deployment.
Update on  Mail Gateways  Servers  Spam Tagging  Anti-Virus  IMAP  Web Mail  LISTSERV  POP.
Archiving Solutions Software vs. Hosted vs. Appliance Based.
Coppin State College PeopleSoft 8.x Architecture: Installing & Configuring Or “What I wish I knew a year ago!”
+. Portfolio and Project Management Steer your strategy: ensure a shared understanding of what is being built and why. Run your development teams: manage.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Time Track Installation and Configuration Development Team.
CODELABOR Shin Sang Jae Template Guide (codelabor-flex-lcds-template)
Nfs or ftp server Server 1 Server 2 ClinCapture web app SAS script SAS REST notification service [SAS RNS] (can be run as standalone app) upload / download.
Windows Azure Conference 2014 LAMP on Windows Azure.
1 D0 Taking Stock By Anil Kumar CD/LSCS/DBI/DBA June 11, 2007.
1 e-Science AHM st Aug – 3 rd Sept 2004 Nottingham Distributed Storage management using SRB on UK National Grid Service Manandhar A, Haines K,
Delivered by: Matthew Zito, Chief Scientist 156 5th Avenue Penthouse New York, NY P: The Database Diet.
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG June 06, 2005.
Beta Panel on R18 Admin Functions Tina Reid – Spartanburg Technical College Sheila Pallotta - Saint Mary's College Jeff Butera - Hampshire College SY 3289.
…the basics…. Wildland Fire Information and Technology Server Requirements ● Windows 7 Professional or Windows 2003/2008 Server ● Windows 8/10 (discussion)
Build and Deployment Process Understand NCI’s DevOps and continuous integration requirements Understand NCI’s build and distribution requirements.
Oracle Collaboration Suite: Streamline Your Integrated Messaging Allan L Haensgen Senior Principal Instructor Oracle Corporation Session id:
Database CNAF Barbara Martelli Rome, April 4 st 2006.
How to Ensure a Stress-Free Migration!
JIRA Online TrainingJIRA. Introduction to JIRA Training JIRA Training JIRA Testing is a proprietary issue tracking product, developed by Atlassian, used.
Online Data Storage Companies MY Docs Online. Comparison Name Personal Edition Enterprise Edition Transcription Edition Price $9.95 monthly rate $4.99.
Work Smarter Not Harder Standardize Your Environment With Best Practices.
Collaboration and Unified
High Availability 24 hours a day, 7 days a week, 365 days a year…
Introducing Connect for Calendar-Only Use Jamie Sonsini Office of Information Systems & Technology January 2013.
By Anil Kumar CD/CSS/DSG June 06, 2005
New tool for Request and Incident Tracking System
Database Services for CERN Deployment and Monitoring
© copyright Janson Industries 2011
Work Smarter Not Harder
Executive Steering Committee Meeting May 6, 2009
End-user measurement combined with deep technical visibility
IT and Development support services
Implementing KFS Release 2 (Let’s Get Cookin’!)
Introduction By mid-2006, the NYISO was averaging < 2% utilization across nearly 500 UNIX servers and suffering from growing power, cooling and space requirements.
Presentation transcript:

Aims Community College Luminis Migration Bill Waggoner

Assumptions concurrent users Non PD deployment Migrate 80k accounts including 24hr migration window Auto generate immutable id’s

Pre Migration Export Environment Luminis III Sun Fire V880s V880 #1 LMG/Portal/MB/Calendar V880 #2 Oracle DB Dell/Linux 6950 Oracle App Server for SSO Dell 2950 Integrated and calendar Native Luminis and Calendar

Post Migration Import Environment Luminis x 2 Sun Fire T2000s 64Gig mem 2 Sun STK 2530 SAS 10k Storage Arrays T2000 #1 Resource Tier T2000 #2 Oracle DB Dell/Linux 6950 Oracle App Server SSO Dell 2950 Solaris Containers (Zones) 83k Accounts

Systems Post Migration

Possible Issues Luminis known installation issues doc Latest Patch Jar File and migration is used Whole root zones T2000 configuration Luminis tuning Back-out plan

4.1.1.x Defects FCKeditor new to 4.1 –Word Wrap –Fails to load –Browser incompatibilities Attachments –Name formatting –Strange behaviour Calendar –Immutable ID visible in 4.1 (but not in 4.0) –Makes it tough to share/view calendars –SunGard is “working on it”

Costs No service engagement 15 Month Planning/Test horizon - 1 shared FTE - A 25% outsourced DBA - Team of faculty/staff testers T2000 Servers Storage Pro Svc $26,000 $14,000 $0 TOTAL$40,000

Aims Community College Luminis Migration Bill Waggoner