H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011.

Slides:



Advertisements
Similar presentations
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
Advertisements

H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 11 October 2011.
Effect of b-tagging Scale Factors on M bb invariant mass distribution Ricardo Gonçalo.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 March 2011.
ZH ➝ ννbb news & plans Ricardo Gonçalo ZH->ννbb phone meeting – 24/1/2012.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
1 Using the pHE data to measure the beam e ’s from  + decay David Jaffe and Pedro Ochoa March 13 th 2007  Introduction  Antineutrino selection  Feasibility.
Sept 30 th 2004Iacopo Vivarelli – INFN Pisa FTK meeting Z  bb measurement in ATLAS Iacopo Vivarelli, Alberto Annovi Scuola Normale Superiore,University.
Introduction to Single-Top Single-Top Cross Section Measurements at ATLAS Patrick Ryan (Michigan State University) The measurement.
Single-Top Cross Section Measurements at ATLAS Patrick Ryan (Michigan State University) Introduction to Single-Top The measurement.
H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 2 August 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 30 August 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
H → ZZ →  A promising new channel for high Higgs mass Sara Bolognesi – Torino INFN and University Higgs meeting 23 Sept – CMS Week.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
Associated top Higgs search: with ttH (H  bb) Chris Collins-Tooth, 17 June 2008.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 5 April 2011.
Introduction Ricardo Goncalo ATLAS-UK Higgs Meeting, 3 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 26 April 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 10 May 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 22 November 2011.
Muon LPC Meeting, 14 Sep Overview of Muon PRS Activities Darin Acosta University of Florida.
Commissioning Studies Top Physics Group M. Cobal – University of Udine ATLAS Week, Prague, Sep 2003.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 8 March 2012.
H ➝ bb search and b-tagging Ricardo Gonçalo on behalf of the Higgs subgroup 5.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 9 March 2011.
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 23 August 2011.
Neutral Current Deep Inelastic Scattering in ZEUS The HERA collider NC Deep Inelastic Scattering at HERA The ZEUS detector Neutral current cross section.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 31 May 2011.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 8 November 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 March 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 7 June 2011.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
E. Soldatov Tight photon efficiency study using radiative Z decays (update) E.Yu.Soldatov 1, 1 National Research Nuclear University “MEPhI” Outline:
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
HSG5 Report: ongoing activity and 2012 plans Ricardo Gonçalo (RHUL) Higgs Working Group Meeting – 10 May 2012.
28/01/101 Zvv bkg, how to get an estimate with first data ? R. Brunelière Time schedule is tight. Goal : get an estimate by may/june if we get data from.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 February 2011.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Introduction Malachi Schram (McGill), Ricardo Gonçalo (RHUL) H->bb Note Meeting, 15 December 2010.
H->bb Status Ricardo Gonçalo (RHUL) on behalf of the H->bb analysis team HSG5 Meeting, 16 February 2011.
HSG5 Status Paper/note circulation: Reading of draft 1on 24 th April: – Talks by Giacinto and Pippa Inputs for combination: separated WH/ZH for vvbb next.
Wahid Bhimji on behalf of the Edinburgh group. Apologies for the mostly text-based slides and for any misrememberings.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
La Thuile, March, 15 th, 2003 f Makoto Tomoto ( FNAL ) Prospects for Higgs Searches at DØ Makoto Tomoto Fermi National Accelerator Laboratory (For the.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
TtH(H->bb) searches in ATLAS and CMS Ricardo Gonçalo Collider Cross Talk, 18 October 2012.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 16 August 2011.
E. Soldatov Tight photon efficiency study using FSR photons from Z  ll  decays E.Yu.Soldatov* *National Research Nuclear University “MEPhI”
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
E. Soldatov Tight photon efficiency study using FSR photons from Z  ll  decays E.Yu.Soldatov 1, 1 National Research Nuclear University “MEPhI”
light jet energy scale from Wjj
Overview of CMS H→ analysis and the IHEP/IPNL contributions
Status of the H4l CSC Note (HG2)
Presentation transcript:

H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011

News! News! News! Technical stop this week Already ≈ 26 pb -1 collected with stable beams – But ≈ 10 pb -1 with no B field Peak luminosity ≈2.5 x cm -2 s -1 with 200 bunches – ≈maximum we had last year – But with lower β * and so higher pileup (around μ=8 so far) – Both in-time and out-of-time pileup will be important this year! Ricardo GonçaloHSG5 H->bb - 22/3/20112

News! News! News! Preliminary meeting of physics+statistics forum: New meeting on procedures for statistical interpretation of ATLAS results on April 15: Ricardo GonçaloHSG5 H->bb - 22/3/20113

News! News! News! ATLAS NLO MC mini-workshop on Thursday this week Should be very interesting, especially for us! Ricardo GonçaloHSG5 H->bb - 22/3/20114

News! News! News! Analysis of 2011 data has started in Jet/Etmiss It will be important to understand jet performance in the higher- pileup environment General call to arms was issued – all volunteers interested in contributing to jet studies Ricardo GonçaloHSG5 H->bb - 22/3/20115

News! News! News! W/Z common selection seems to have become more stable – Version 1.2: physics/Lists/Common%20Selection/AllItems.aspxhttps://espace.cern.ch/atlas-sm-wz- physics/Lists/Common%20Selection/AllItems.aspx – Aimed at W/Z 2010 data My proposal is that we should use this selection for now – Produce our first results for Dubna using 2010 data and this selection We don’t yet have any full analysis results from 2010 data! Discussion later in today’s meeting Then, before Dubna, we should compare results from 2010 data with 2011 data – Understand 2010 data to check for surprises in 2011 data… – First look from Lianliang already today – but remember we still have more 2010 data than 2011 data… and 2010 is well understood by CP groups – Adapt cuts/object selection as needed and as recommended by CP groups Ricardo GonçaloHSG5 H->bb - 22/3/20116

Sharepoint We have a Sharepoint page available: H2bb/default.aspx H2bb/default.aspx Hasn’t been used for a long time, but should be useful to exchange information on the ongoing analyses Feel free to post new items! Ricardo GonçaloHSG5 H->bb - 22/3/20117

Backup Ricardo GonçaloHSG5 H->bb - 22/3/20118

Proposed Roadmap for WH Analysis After the effort on cut flows, we’re ready to start producing results! – Concentrating on un-boosted results here only because it’s still unclear what would be feasible in boosted analysis until Dubna – commissioning work ongoing – BUT: work on boosted VH is starting in parallel – see e.g. Wahid’s talk today Intended results: – Cut-based analysis focusing on WH -> e/μ ν b b I think there should be at least 2 analyses, for cross checking results Ideally using 2 different data formats (AOD vs D3PD) – Multivariate analysis in parallel, to improve on cut-based analysis Timeline: – Analyses should be semi-frozen by Dubna (17 – 19 May) – This leaves around 7 weeks Results in the form of: – Histogram with # events vs m H – Table of # events expected for each value of m H and background type – including statistical and systematic uncertainties – Exclusion plot vs m H (95% C.L. limit on σ/σ SM ) – …plus control plots etc Ricardo GonçaloHSG5 H->bb - 22/3/20119

Questions to be answered Cut-based analysis focusing on WH -> e/μ ν b b – Establish analysis selection: why is each cut applied and why at each particular value? Are we convinced this is the right thing to do? – Establish set of systematic uncertainties: start from combined performance group recommendations. What are the most important? Are there any hidden pitfalls for us? – What b-taggers and why? What calibrations do we expect to be ready in time? What is the corresponding systematic uncertainty? – What sort of exclusion limits can we expect for 0.5, 1, 2 fb -1 ? Multivariate analysis in parallel, to improve on cut-based analysis – What event preselection should be used and why? – Use for signal-background separation only or target particular backgrounds? – What are the possible bias? Where can it go wrong? – What improvement can be expected wrt cut-based analysis for 0.5, 1, 2 fb -1 ? Exclusion plot vs m H (95% C.L. limit on σ/σ SM ) – Need someone to implement RooStats workspace Ricardo GonçaloHSG5 H->bb - 22/3/201110

Ricardo GonçaloHSG5 H->bb - 22/3/ DateMilestones wish list 17 MayDubna workshop – analysis frozen After this: add data to un-boosted analysis and prepare for result approval Concentrate more effort on boosted VH with a view to obtaining results quickly 10 MayReview results with 2011 data from cut-based and multivariate analyses 3 MayMargin for dealing with unforeseen problems 26 AprilStart looking at 2011 data if enough is available. Any surprises? How does the MC describe the new data? By now we should have a reasonable idea of results from the multivariate analysis 19 AprilEnd of 2 weeks of beam scrubbing. (I’m away for Easter) 12 AprilBy now we should have a reasonable idea of the exclusion of the cut-based analysis First report on MVA preliminary results – establish plan for getting results by Dubna 5 AprilIdentify the worst systematics and discuss any possible improvements: Any changes needed in analysis cuts? Any study necessary for corrections to some systematic effect? Multivariate analysis: iterate on preselection cuts, methods, questions Assign tasks – divide the work to achieve better results! 29 March Establish analysis cuts: If possible as result of optimization Use 2010 data to develop cuts and show that data is well described by background MC Start evaluating systematics 22 MarchIterate on analysis cuts – why is each cut applied at each particular value? Start iteration on multivariate methods to improve analysis

Reconstruction issues Muon CP group recommendations for release 16: – Reconstruction efficiency and isolation efficiency scale factors, momentum smearing functions – Jet/Etmiss recommendations for jet cleaning in release 16: – Medium jet cleaning should give similar rejection to rel 15 cleaning but with better efficiency – Tight jet cleaning should not be used – still under discussion – New!: Final b-tagging calibrations for release 16 based on full 2010 data: – e/gamma recommendations for energy scale and resolution in release 16: – – And rescaler tool: Standard Model W/Z group baseline selection for release 16 (next 4 slides): – See discussion in W/Z group SharepointdiscussionSharepoint – Also, finer points (and perhaps the not so fine) still being discussed Ricardo Gonçalo12HSG5 H->bb - 22/3/2011