W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04). W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04)
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
April 19, 2008Heavy-Ion Meeting1 Overview of Korean Activities for the CMS Heavy Ion Program Byungsik Hong Korea University.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY,
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
Korea-CMS representative: Young-Il SKKU 6 CMS member institutes + 2 non-member institutes are active: 15 professors, 19 researchers, 20 graduate.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
Trigger & Tracking detector for CMS
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Micromegas Vertex Tracker Status Report
Integration and Services RE3/1 and RE4/1
Third Workshop on GEMs for CMS
Jan Królikowski Warsaw University
Chamber Design and Integration RE3/1 and RE4/1
Electronics for RPC Upscope
Francesco Forti University and INFN, Pisa
HPL DG d=1.4mm/e= mm.
CMS RPC Endcap RE1 Status Report
Status of ATLAS Resources
RPC SYSTEM LAYOUT and DIMENSIONS
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics Pakistan Front-end electronics Pakistan “ Thin design everywhere ” 2

W.Van Doninck Re-scope TDR August 2008 Existing at present China Pakistan Staged Low eta chambers identical for stations 2,3 and 4

W.Van Doninck Re-scope TDR August 2008 Restoring the TDR system ?  Build station RE4 i.e.144 RPC of the low  type  Services to the RE4 station  High  RPC’s: 72 RE1/ RE2/ RE3/1 (high rate!)  Services to high  RPC’s (gas & cooling foreseen)  Restore HV to 1 channel/chamber (NOT 2 ch/ch)  Little design and integration required  Requires YE4 shielding walls to support RE4 Price tag (without link and trigger system) ~ 4.3 Mio CHF

W.Van Doninck Re-scope TDR August 2008 Improvement from extra plane Results shown for range of RPC efficiency & noise

W.Van Doninck Re-scope TDR August 2008 A possible road to a 5 station system  Support RE4 From YE3  Move the present RE2 station to YE4 to become RE4  Rebuild a new DOUBLE station RE2 ( Call it newRE2) i.e. 144 “packages” for the low  part.  Limit the services to present station RE2 (LBB,gas,etc…) Hence make AND/OR on the chamber package. May need extra HV, LV.  NO increase of the trigger system wrt TDR  Live in EXISTING envelope (no shimming of magnet).  Design work and integration required ! ÞRest of this talk (also see Luc’s talk)  High  part as before (with RE2/1 double RPC) Price tag (without link and trigger system) ~ 6.0 Mio CHF

W.Van Doninck Re-scope TDR August 2008 New RE2: double RPC with on chamber AND/OR logic See Luc’s talk

W.Van Doninck Re-scope TDR August 2008 Possible (aggressive) timeline for phase I Mumbai RPC conference

W.Van Doninck Re-scope TDR August 2008 Status of discussions  Korean Gas gap production facility to remain active and funded  Mechanical parts from China (funded)  Continuing help from barrel RPC’s (FEB, Coincidence etc…)  Keep the ISR lab facilities active (continued support from CERN )  Enough funding available ? Upgrade is estimated at ~ 6 Mio CHF (cfr. RRB document) Confirmed partnership: Belgium-China-India-Korea-Pakistan Under discussion: CERN-Italy-Iran-Egypt  Define the responsibilities among the partners The FW RPC upgrade is mandatory for physics at the design luminosity of LHC and even more so for SLHC The presently build initial system of 3 stations at low  requires to be more than doubled !

W.Van Doninck Re-scope TDR August 2008 RE4 on YE3

W.Van Doninck Re-scope TDR August 2008 InterfaceInterface

RE4 near yoke

W.Van Doninck Re-scope TDR August 2008 RE4 near yoke

W.Van Doninck Re-scope TDR August 2008 And off yoke RE4

W.Van Doninck Re-scope TDR August 2008 Envelope =646mm of 655 available 626 mm

W.Van Doninck Re-scope TDR August 2008 Summary and conclusions  RE up-scope required by Physics at the LHC design Luminosity  We can do better than the TDR version at little extra cost  Collaboration ~ defined and funding (at least for Phase I) secured  Mechanics and gas gaps defined and installation scenario understood  Details on services still to be finalized We seek approval for Phase I to start orders of HPL and mechanics