LAHORE WASTE MANAGEMENT COMPANY. Prequalification of firms RFP( International) advertised on 22 nd July 2013 Submission Date was 22 August, 2013. Pre-qualification.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
MASBO February Information to purchase Services Information to purchase Construction.
Implementation Guidance Executive Order State of New Mexico Contractor Health Coverage Requirement Michael C. Vinyard, State Purchasing Agent.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Procurement Management
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Purchase Requisition (PR) Purchase Requisition (PR) Bid Invitation 1.White copy : Finance 2.Pink copy : Filing 3.Green copy : leave in PR book CBA 1.Reviewed.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
LAHORE WASTE MANAGEMENT COMPANY. Key Milestones Services and Assets Management Agreement (SAAMA) Status – Not signed in any district Identification of.
LAHORE WASTE MANAGEMENT COMPANY 1. Sequence A.Contract Details 1.Procurement procedure 2.Design 3.Financial Model 4.Bid Opening B.Performance Monitoring.
New Solid Waste Management System in Lahore (Technical Aspects)
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
LAHORE WASTE MANAGEMENT COMPANY. Decisions of meeting on S&GAD may place the services of competent officers at the disposal of Board of Directors.
TENDERING PROCEDURE IT- 3927/EN
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
United Nations Procurement Division
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Lahore Waste Management Company City District Government Lahore Progress for Outsourcing of Solid Waste Management Functions in Six Cities of Punjab.
CONSTRUCTION CONTRACTS DOCUEMENTS
LAHORE WASTE MANAGEMENT COMPANY. Decisions of meeting on S&GAD may place the services of competent officers at the disposal of Board of Directors.
Introduction The following chapter will review: –Overview –Model assumptions –The Cost Proposal & Evaluation –Payments methodology –Financial Incentives/Disincentives.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Preparing EOI and RFP.
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Light Rail Transit Project
Content of Tender Dossier - Instructions to Tenderers - Tenders
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Award Management Services
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Award to Commencement -
Particular Conditions of Contract & Appendix to Tender
Residential Solid Waste Services Overview and Request For Proposal Discussion June 28, 2016 City of Palm Coast.
9/18/2018 Bids CONTRACTING Khamis…..
Chapter 3 Proposed Solutions
BIDDING DOCUMENTS AND MAIN FEATURES
Procurement Planning Mani Ram Gelal
Pre-bid Clarification Meeting
Presentation transcript:

LAHORE WASTE MANAGEMENT COMPANY

Prequalification of firms RFP( International) advertised on 22 nd July 2013 Submission Date was 22 August, Pre-qualification Criteria Business experience and certification (25 marks) Personnel capabilities (20 marks) Equipment & machinery (30 marks) Financial capability (25 marks) Total Qualifying Marks = 60% Criteria encourage local contractors for bidding, the marks were allocated proportionate to capabilities

Firms Pre –Qualified Name of Firms/ Cities/ Marks Obtained FSDGJWMULRWPSKTBHWLResult M/s. Albayrak100 Qualified M/s. Ozpak100 Qualified M/s. Cevre Qualified M/s. GHSN/A51.5N/A 62 Qualified in SKT, BHWL) M/s. Waste Buster30 39 Disqualified 1.For small cities ( Sialkot, Bahawalpur)For small cities ( Sialkot, Bahawalpur) 2.For large cities ( Faisalabad, Gujranwala, Rawalpindi, Multan)For large cities ( Faisalabad, Gujranwala, Rawalpindi, Multan)

Time lines for Bidding process Sr. No ActivityTime LineActivity Days Remarks 1Preparation of Prequalification Documents & Submission to the Companies for Approval of BODs Jul 20, Publication of Pre-qualification Advertisement in Local & International Newspapers and PPRA Web Jul 22, Approval of prequalified documents by the Respective BODsJuly 26, Issuance of Prequalification Documents to Potential Applicants/Bidders Jul 27, Submission of Technical Proposals by Potential Bidders and Opening of Technical Proposals Aug 22, Technical Evaluation by LWMC(Consultant)Aug 30, Submission to the Respective Companies for BODs ApprovalSep 03, Preparation of Bid Documents & Submission to Companies for BODs Approval Sep 06, Invitation to Bid to Prequalified BiddersSep 10,201304Issued for FSD, SKT

Cont’d... Sr. No ActivityTime LineActivity Days Remarks 10Issuance of Bid Documents to Prequalified Bidders Sep 12, Being issued as per approvals received from respective BODs 11Pre-Bid MeetingSep 15, Expected on Sep 25, Submission of Financial Proposals & Opening Sep 21, Sep 30, Financial Evaluation by LWMCSep 24, Oct 04, Appraisal by Finance DepartmentSep26, Oct 07, Final Negotiation by the CommitteeSep28, Oct 08, Approval of Financial Bid by Respective BODs Oct 03, Oct 12, Award and Signing of Contract7th Oct, 2013-Oct 14, 2013

 BID SECURITY The amount of Bid Security for Large city LocalRs 100 Million InternationalUSD 1 Million The amount of Bid Security for Small city (Bahawalpur & Sialkot) LocalRs 50 Million InternationalUSD 0.5 Million PERFORMANCE SECURITY 10 % of Contract Price in form of Bank Guarantee for 7 Years.

SUB CONTRACTING Contractor may execute subcontract for services up to 30% of total services. PENALTIES The amount of penalty to be imposed during one month shall not, in any case, exceed 15 % of the monthly progress payment. (Details of Penalties)

Price Escalation The amounts payable to the Contractor on price escalation will be as per the formula i)Pn = A + b Ln + c Fn Lo Fo where, “Pn” is the Price Adjustment factor. “n” (excluding Fixed Cost, Reimbursable Cost and Provisional Sums). “A” is a constant or the Non-Adjustable Portion of the Price Adjustment Factor to be specified, representing the Non- Adjustable Portion of the Contract Price. “b, c, are Coefficients or weightages of the order of 0.xx “Lo, Fo, are the Base Date Indices for the Labor and Fuel are adjustable elements.

MOBILIZATION ADVANCE (Option 1) An amount up to 10% of the contractor value shall be granted as an advance in two equal installments, upon request of the applicant, before starting the work and after signing the Contract. This advance payment shall be deducted, from monthly performance payments of the Applicant in 24 installments, within 36 months period from commencement of work subject to Bank guarantee letter from schedule Bank of Pakistan. (Option 2) Mobilization advance shall be payable for meeting local duties & taxes and will be payable on phase wise arrival of imported machinery in Pakistan. Mobilization advance shall not exceed 15% of initial investment amount (pertaining only to imported vehicles and other imported equipment) as per the signed contract. This advance payment shall be deducted, from monthly performance payments of the Applicant in 24 installments, within 36 months period from commencement of work subject to Bank guarantee letter from schedule Bank of Pakistan.

Firms Pre –Qualified i.M/s. Ozkartallar Insaat Sanayi Ve Ticaret Limited Sirketi ( six cities) ii.M/s. Albayrak Turizm Seyahat Ve Ticaret A.S. Turkey, Pakistan Branch Office (all six cities) iii.M/s. CEVRE Insaat Temizlik Tic Ltd Sti (all six cities) iv. M/s Ghulam Hussain & sons Ltd., ( Skt. & Bhw) v. M/s Waste Busters Consortium with Conpro (Applied but rejected )

Sr. No ActivityTime LineActivity Days 1Preparation of Prequalification Documents & Submission to the Companies for Approval of BODs Jul 20, Publication of Pre-qualification Advertisement in Local & International Newspapers and PPRA Web Jul 22, Approval of prequalified documents by the Respective BODs July 26, Issuance of Prequalification Documents to Potential Applicants/Bidders Jul 27, Submission of Technical Proposals by Potential Bidders and Opening of Technical Proposals Aug 22, Technical Evaluation by LWMC(Consultant)Aug 30, Submission to the Respective Companies for BODs Approval Sep 03, Preparation of Bid Documents & Submission to Companies for BODs Approval Sep 06, Invitation to Bid to Prequalified BiddersSep 10, Time lines for Bidding process

Sr. No ActivityTime LineActivity Days 10Issuance of Bid Documents to Prequalified Bidders Sep 12, Pre-Bid MeetingSep 15, Submission of Financial Proposals & Opening Sep 21, Financial Evaluation by LWMCSep 24, Appraisal by Finance DepartmentSep26, Final Negotiation by the CommitteeSep28, Approval of Financial Bid by Respective BODs Oct 03, Award and Signing of Contract7th Oct, Cont’d...

Outsourcing of SWM services in Sialkot LAHORE WASTE MANAGEMENT COMPANY

Waste Generation Statistics CITYNo. of UCs POPULATION in 2013 (Million) WASTE GENERATION (TONS / DAY) Faisalabad Gujranwala Rawalpindi Multan Sialkot Bahawalpur Murree TOTAL

Scope of New SWM contract Manual sweeping in streets; Vacuum sweeping on major roads; Mechanized Washing; Door-to Door Waste Collection; Container based Waste Collection; and Transportation of MSW to the Disposal Site

Scope of Residual Functions of CDGs Monitoring of MSW Collection and Transportation Contract as per agreed KPIs; Enactment and Enforcement of relevant laws; De-silting of roadside waste water open drains; and Levying of charges and fees.

Penalty Mechanism and Monitoring of Contractors Robust penalty mechanism on the basis of experience of Lahore model – Vehicle Trip Counting System (VTCS) – Vehicle Tracking & Monitoring System (VTMS) – Android Based Monitoring – Complaint Re-dressal System (CRS)

Bidding Documents Instruction to Bidders General Conditions of the contract Technical Specifications – Tentative Pre – bid conference on 20 th September 2013 – Deadline for submission of bid by firms is 30 th September 2013

Sr. No. ActivityStandard 1 Container for waste storage 0.8 m 3 volumetric container, and 5 m 3 container to be used in conjunction with 7, 13 and 25 cubic meter compactors 2 Door-to-door waste collection 2 Mini dumpers for each UC 3 Mechanical Sweeping One mechanical sweeper for 40 km road length each day. 4 Waste Transportation At least 3 trips per vehicle to WTS/dumpsite 5Sweeping Standard 1 sanitary worker for 800 persons Design Parameters

Sr. No. ActivityStandard 6.Wheelie Bins 1 Wheelie per worker four plastic liner bags to be fixed in wheelie bins daily. 7.Collection bagsFor 6 3 bags/week 9.Support VehiclesLoader, Dumper, Front End Loader, Water Bowzer and Washing Machines as container washing vehicle etc. Design Parameters continued

Phase A is the first area that needs to be started in the first two (02) months after the site delivery. The following time lines shall have to be adhered with for start of various phases. Phases Commencement Period from the Date of delivery of Site to the Contractor AWithin Two (02) Months BWithin Four (04) Months City will be taken over in Four distinct phases

Sr. No.Position Workers Provided by Employer Additional Workers Required Total Required Workers 1LOADER OPERATOR3-3 2 MOTOR VEHICLE INSPECTOR -33 3SANITARY INSPECTOR-88 4 SANITARY SUPERVISOR -16 5DRIVER WORKER HAND SWEEPER653- TOTAL Man power requirement

Vehicles arrangements The contractor shall supply the vehicles and equipment required for the Phase: A within first two (02) months. However the remaining phase shall be started within the specified timelines.

Activity / Indicators BaselineTarget Household level coverage of SWM services through door-to-door (DTD) collection No area served under DTD collection 30%40%50% Collection efficiency (Waste transported per month i.e. amount reaching to final disposal site) 55%80%85%90% Service Delivery Indicators

Activity / Indicators BaselineTarget Mechanical Sweeping Coverage 60 km98 Km Increase according to infrastructure improvement Mechanical Washing coverage No such activity in practice Development of schedule for weekly washing activity at predefined roads and locations of public interest. 3 teams Service Delivery Indicators continued

Vehicle and Machinery Sr. # VAHICLENo of Vehicles 17m3 Compressed garbage truck 2 axle8 213m3 Compressed garbage truck 2 axle6 3Water bouzer (local)2 4Sweeper 6m34 5hauler dumper (40 ton)- 6Container washer1 7washing vehicle 8m3 (per day)1 8DUMPER (10 Ton)5 9T/LOADER (per hour)3 10FRONT END LOADER- 11CHAIN BULLDOZER1 12ARM ROLL TRUCK 5m3 (LOCAL)1 13Compactor 25m^31 14Mini Dumper (LOCAL)35 15CAR 1000CC (LOCAL)5 Total73

VehiclesNo of Vehicles Vehicle and Machinery continued

Rough Cost Estimates MAIN FEATURES : – Project Life:7 YEARS – Financial Modeling :ROE MODEL – % Equity:40% – Return On Equity (Roe):20% – Annual Cost Of Project (with Tax):$13.3 MILLION – Total cost of the project (with tax): $93.2 MILLION – Monthly cost the project (with tax):$ 1.1 million

Annual Activity wise Rough cost estimates : 1.SOLID WASTE COLLECTION: US $ MILLION 2.MECHANICAL SWEEPING:US $ MILLION 3.MECHANICAL WASHING:US $ MILLION 4.MANUAL SWEEPING:US $ MILLION TOTAL:US $ 13.3 MILLION Rough Cost Estimates continued