4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
DCZ status & results B A B AR Trigger Workshop, December 2004 Jamie Boyd University of Bristol for the Trigger Upgrade Group.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Systems Development Life Cycle Dirt Sport Custom.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
“Golden” Local Run: Trigger rate = 28Hz
University of California Los Angeles
Darin Acosta University of Florida
Han Jifeng BESIII MUON GROUP IHEP, CAS
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Configuring the Peripheral Crates
RPC approved plots.
Plans for the 2004 CSC Beam Test
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California, Los Angeles UCLA group meeting 4 December 2008

4 Dec 2008G. Rakness (UCLA)2 Online Software Updates for TMB firmware 18 Nov 2008 –Counters TMB class: updated EmuPeripheralCrateMonitor application (used to start/stop TMB counters and DCS monitoring jobs [XMAS] and to display the counters during data taking [and otherwise]) –Currently hardcoded for TMB counters beyond what is in TMB class –To be improved to make maintenance easier and less error-prone. In the meantime, Jinghua will update this… –Xml parameters added and removed, and TStore functions modified Add tmb_firmware_compile_type (default = a)  this specifies the type of firmware –Possible values = a, b, c, d Add alct_readout_without_trig (default = 0) Add clct_readout_without_trig (default = 0) Add match_readout_without_trig (default = 1) Add mpc_block_me1a (default = 1) Remove clct_stagger  this is implicit in tmb_firmware_compile_type Configuration database –N.B.: Will not be possible to remove parameters once we begin to use the configuration database is used –Will begin to use when we turn on next year –At first, only use it for bookkeeping (i.e., we won’t configure from database) –After tools are written to modify the configuration database, and we are used to using it, we can think about configuring from database…

4 Dec 2008G. Rakness (UCLA)3 Online Software (cont.) Configuration database –Talked to Jinghua Liu… –Note: It will not be possible to remove parameters once we begin to use the configuration database… –Plan to begin to use when we turn on next year –At first, only use it for bookkeeping This means we won’t configure the hardware directly from database, but only store the configuration that has been loaded… –I think we can think about making the step of configuring from database after… Tools are written to modify the configuration database We are used to using it (i.e., have verified again and again that reading from the database is reliable)

4 Dec 2008G. Rakness (UCLA)4 RPC data into RAT

4 Dec 2008G. Rakness (UCLA)5 Recall: RPC-TMB phase scan results for all ME+1 chambers… 49 chambers of Type “A” and “B” would work OK with delay = 11 Broken up by “Type”

4 Dec 2008G. Rakness (UCLA)6 Type “C” are pesky 19 chambers of type “C” come in clumps Have asked the RPC colleagues for input… Have set delay value = 11 for CRAFT data… Remove these chambers from the analysis…

4 Dec 2008G. Rakness (UCLA)7 Some numerology Run 67539: All detectors in the readout Number of triggers accumulated = 13.7M DT, RPC, HCAL (HPD noise), Random = 600Hz CSC trigger rate = 60Hz Number of events analyzed today = 3.25M  ~325k CSC triggers Number of events with single ME+1/3 chamber fired with 1 valid ALCT and 1 valid CLCT (clean events) = 37k

4 Dec 2008G. Rakness (UCLA)8 General CSC distributions

4 Dec 2008G. Rakness (UCLA)9 Occupancy of Cosmic Rays in ME+1/3 chambers Chamber illumination (  = excluded from analysis,  = CSC HV problem?) peaked at  /2 CLCT key ½-strip (  ) flat ALCT key-wiregroup (  ) Higher occupancy at big end CSC HV gaps clearly seen

4 Dec 2008G. Rakness (UCLA)10 ALCT key wiregroup vs. CLCT key ½-strip CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)11 CLCT Pattern ID for Cosmic Rays No pattern = 0 or pattern = 1, as expected Lower pattern ID’s for Side chambers, as expected I was expecting flatter distribution for Top and Bottom chambers… ? Dip at pattern ID = 6 and 7?

4 Dec 2008G. Rakness (UCLA)12 General RPC data into RAT distributions

4 Dec 2008G. Rakness (UCLA)13 Number of RPC pad bits per event  Already can see lots of 0’s…

4 Dec 2008G. Rakness (UCLA)14 Time Bin of RPC Pad Bit in TMB Readout Window RPC data late w.r.t. CLCT pretrigger Width in RPC arrival time has contributions from… CLCT pretrigger jitter Chamber-to-chamber timing differences  to be investigated CLCT pretrigger Time bin (bx) (rpc_fifo_pretrig = 2)

4 Dec 2008G. Rakness (UCLA)15 (BXN + parity bit) Recall: RPC firmware defines parity bit so that total number of bits = odd number Software cut = one RPC bit  should only be an EVEN number of bits in the (BXN+parity bit) word (BXN+parity bit) has only even numbers of bits, as expected…  Phase scan worked…

4 Dec 2008G. Rakness (UCLA)16 RPC Pad Bit Mapping Determined from CSC data Require: Number of RPC pad bits =1 CLCT Pattern ID > 7 CLCT Quality = 6 ALCT Quality = 3

4 Dec 2008G. Rakness (UCLA)17 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 0 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)18 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 1 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)19 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 2 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)20 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 3 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)21 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 4 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)22 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 5 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)23 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 6 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)24 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 7 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)25 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 8 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)26 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 9 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)27 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 10 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)28 ALCT key wiregroup vs. CLCT key ½-strip: RPC pad bit = 11 CLCT key ½-strip (  ) ALCT key wiregroup (  )

4 Dec 2008G. Rakness (UCLA)29 ALCT key wiregroup vs. CLCT key ½-strip: heuristic RPC pad-bit mapping… CLCT key ½-strip (  ) ALCT key wiregroup (  ) Bits for inner areas cover twice the linear dimension as do bits for outer areas

4 Dec 2008G. Rakness (UCLA)30 RPC pad bit efficiency

4 Dec 2008G. Rakness (UCLA)31 Choose muons hitting chambers on either side of the RPC Cuts: 1 ME+1/3 chamber with 1 ALCT and 1 CLCT 1 ME+2/2 chamber with 1 ALCT and 1 CLCT chamber number = ME+1/3 chamber…

4 Dec 2008G. Rakness (UCLA)32 ALCT wiregroup occupancies for events with ME+1/3/N and ME+2/2/N Equal inter-station chamber number event selection… Suppresses events with ME+1/3 large WG-number Suppresses events with ME+2/2 small WG-number … as expected…

4 Dec 2008G. Rakness (UCLA)33 RPC Pad Bit Efficiency Numerator = non-zero pad-bit data in RAT Denominator = muon going through ME+1/3 and ME+2/2 ME+1/3 chamber number RPC pad bit efficiency

4 Dec 2008G. Rakness (UCLA)34 Next… RPC data into RAT –Efficiency: More studies follow, selecting on CLCT and ALCT qualities and pattern ID’s to choose denominator events more selectively…  No difference in end result… –Pad bit mapping: Tried to make a plot of mapping with TWO adjoining pad bits to try to show edges (lot cleaner presentation)… need yet more statistics –Should I present this to somebody somewhere? CMS week next week –“Peripheral Crate and FED crate Operations” talk on Sunday Finish writing this talk tomorrow –Trigger talk on Tuesday Write this talk Monday Update ALCT configuration format into user PROM Work on expansion of trigger pattern tests… –CLCT+ALCT  TMB  MPC  SP (N.B. TMB  MPC already exists…)

4 Dec 2008G. Rakness (UCLA)35 Other slides…

4 Dec 2008G. Rakness (UCLA)36 Wiregroup difference from station 1 to station 2 No ALCT quality cut “IP pointing” muons for top and bottom chambers Low quality (flat) muons…

4 Dec 2008G. Rakness (UCLA)37 Wiregroup difference from station 1 to station 2 If we require ALCT quality = 3 for both stations… “IP pointing” muons for top and bottom chambers

4 Dec 2008G. Rakness (UCLA)38 CLCT ½-strip difference from station 1 to station 2 On both chambers require: CLCT Pattern ID > 7 CLCT Quality = 6 No CLCT requirements… Picking high quality CLCT candidates with large patterns selects tracks which go straight through the chambers…

4 Dec 2008G. Rakness (UCLA)39 Denominator for pad bit efficiency

4 Dec 2008G. Rakness (UCLA)40 FYI: ME+1/3 CLCT and ALCT qualities Wasn’t sure what to expect here…

4 Dec 2008G. Rakness (UCLA)41 Recall: CSC chamber labels “Top” CSC = 10 “Bottom” CSC = 28 “Side” CSC’s = 1 and 19