Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep. 2014 page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,

Slides:



Advertisements
Similar presentations
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Advertisements

Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Taikan Suehara, ILC-Tokusui annual meeting, 16 Dec page 1 Overview of SiECAL and related DAQ development Taikan Suehara (Kyushu University, Japan)
Taikan Suehara, AIDA-2020 kickoff meeting, 3 Jun page 1 Requirements from CALICE-DAQ for WP5 Taikan Suehara (Kyushu University, Japan)
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development.
DOOCS DAQ software for the EUDET prototype Valeria Bartsch (UCL) Andrzej Misiejuk (RHUL) Tao Wu (RHUL)
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Data Acquisition Data acquisition (DAQ) basics Connecting Signals Simple DAQ application Computer DAQ Device Terminal Block Cable Sensors.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Taikan Suehara, TB meeting, 5 Sep page 1 Si/Sc combined DAQ Taikan Suehara (Kyushu University, Japan)
Taikan Suehara, CALICE DAQ TF, 7 Apr page 1 CALICE DAQ TF meeting Taikan Suehara (Kyushu University, Japan)
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
Taikan Suehara, Belgrade, 9 Oct page 1 Development of combined DAQ for silicon and scintillator ECAL and related software issues Taikan Suehara.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Taikan Suehara, Belgrade, 9 Oct page 1 SiECAL DAQ Taikan Suehara (Kyushu University, Japan)
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
Taikan Suehara, CALICE electronics and DAQ WS, 16 Dec page 1 Combined DAQ & DAQ Task force Taikan Suehara (Kyushu University, Japan)
PRESORT OF THE DATA OF THE COLOGNE TEST EXPERIMENT ● Quality and integrity of data ● Detector numbering and positions ● Calibrations and gain stability.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Taikan Suehara, LLR-Kyushu meeting, 20 June 2014 page 1 Discussion on DAQ: my prospects Taikan Suehara (Kyushu University)
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Taikan Suehara, CALICE meeting at KEK, 20 Apr page 1 Report from CALICE DAQ Task Force Taikan Suehara (Kyushu University, Japan)
Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
Taikan Suehara, HGC4ILD workshop at LLR, 2 Feb page 1 Common DAQ Taikan Suehara (Kyushu University, Japan)
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Taikan Suehara, CALICE DAQ TF, 7 Sep page 1 CALICE DAQ TF meeting Taikan Suehara (Kyushu University, Japan)
14.4. Readout systems for innovative calorimeters
Online Monitoring : Detector and Performance check
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Calicoes Calice OnlinE System Frédéric Magniette
Integration of CALICE DAQ in common DAQ
Current activities in Kyushu for Silicon-ECAL
Marcin Chrząszcz Cracow University of Technology Itamar Levy
ECAL Integration / CALICE DAQ task force
Testbeam Timing Issues.
Plan of production of SiW-ECAL slabs in Japan
DAQ status and plans DAQ Hardware Moving stage (MIP calibration)
Test Beam Measurements october – november, 2016
Presentation transcript:

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University, Japan)

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 2 Communication with Hamamatsu Idea of test setup for mass production DAQ –Overall plan –Connecting to EUDAQTopics

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 3 Hamamatsu said: –8 inch is possible, but not desired for HPK standard thickness is  m extra cost for thinner (due to grinding) resistivity is smaller (  more bias voltage) simple patterns only –6 inch: sensors of 320 and 500  m thickness cost almost the same 650  m, 10-15% raise on cost < 300  m, 70% raise on cost 70,000 chips/year (ILD DBD: ~ 5 years) 500  m, 6 inch currently seems the best thicker & bigger sensors

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 4 1.Chips from Hamamatsu –IV/CV tested in Hamamatsu 2.Laser scan on every pixel on bare chips –Crosstalk (connecting pixels) –Operable gain (not precise) 3.Glued to PCB/SKIROC, making slabs 4.Test with RI source ( 57 Co or 90 Sr) –Gain calibration –Noise Test stand for mass production

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 5 Plan of laser scan XYZ stage Si sensor Springs or conductor sheet PCB with many holes Electrode Laser beam Put the IR laser beam at every gap between the pixels using XYZ stage Check gain (roughly) and leakage (connecting) pixel on each pixel before gluing Should be short time eg. 2 sec/gap, 300 pad/day (can be loosen if we have multiple stations) Laser beam readout (SKIROC?)

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 6 Calibration of gain and noise with electronics 90 Sr (2.28 MeV (Max) e - ) –MIP-like signals (non-monochromatic) –Dependence on angle to source 57 Co (122 & 136 keV (10%)  ) life: 0.7 yr –quasi-Monochromatic gamma, easy to calibrate –only ~2% stops at 500  m silicon: scattering background < 1 hour of accumulation time required Slab test with RI source slabs source

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 7 57 Co will arrive in Oct. 90 Sr already available XYZ automated stage: order soon PCB with holes: should design DAQ: firstly CAMAC with non-full channel (eg. 16 channels) Plan to establish them within this fiscal year (~Mar. 2015) DAQ with SKIROC: next fiscal year Plan to assemble a test station

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 8 DAQ

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 9 DAQ in Kyushu now

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 10 Ongoing 1.Online monitor (talk by H. Hirai) 2.Connection to external framework (EUDAQ or others) Planned after looking at new calicoes 1.Flexible logging system 2.C++ support module 3.Enforce analysis/debugging DAQ development plans in Kyushu

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 11 Structure Data format (LCIO) Schedule/Plan Topics about EUDAQ connection

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 12 EUDAQ structure Calice Producer calicoes / others TCP connection

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 13 1.Store ‘hit’-like objects We have ‘CalorimeterHit’ class in LCIO Need threshold – not always suitable for low- level analysis (cross talk etc.) 2.Store simple array of raw data  planned More flexibility; hit-like data can be created from the raw array Need more steps for high-level analysis No specific LCIO structure, use LCGenericObject with attachment class Data format in LCIO

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 14 LCIO: GenericObject LCIO Event  1 ROC - LCIO collections  1 types of data (SiADC, ScADC, ScTDC etc.) -LCIO objects LCGenericObject  1 chip of data LCGenericObject can save one array (int, float, double) dataDescription in every object can be used for tags, eg. “LDA=1;DIF=2;BX=10;”

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 15 Current status Succeeded to run EUDAQ with CaliceProducer producing dummy data encoded to LCIO object and save to LCIO file using DataCollector Ready to attach to calicoes/others

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 16 EUDAQ part Writing TCP adapter Converter from raw to LCIO (if needed) calicoes part Attachment of calicoes to output data to TCP Integration and test Testbeam at CERN: 26 Nov. – 8 Dec. Things to do

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 17 We started to work on DAQ (Thanks to LLR and DESY for sending us setup) Our first target is the testbeam Nov.-Dec. Base software is updating: we’d like to adapt to it We’ll also work on prototype of test facilitySummary

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 18

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 19 ROC control on TB mode piconf calicoes/pyrame Sc hardwareSi hardware Sc dataSi data Event builder CCC next ROC Event builder will control next ROC Need to modify piconf/CCC

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 20Image Run control piconf calicoes/pyrame Sc hardwareSi hardware Sc dataSi data Event builder LCIO file(s) Event display start/stop EUDAQ start/stop

Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 21 Aims Assure all data are correctly arrived Assure ROC # is consistent on the whole system Common format for Si/Sc cal data Assure run ID Inputs idea a: common LCIO objects idea b: raw + converter  First to implement piconf seems to have no output formatter Data Collector