1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

The Single European Sky ATM Research (SESAR) initiative
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
1 Results - Experience of Participating Air Traffic Controller By T. Symmans EUROCONTROL.
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Building open regional innovation strategies: New opportunities provided by Smart Specialisation Strategies Claire Nauwelaers Independent STI policy expert.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
SESAR and ASAS Opportunity
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
SPECTRUM STRATEGY & VISION ICAO ACP WG-F October 2014 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP Spectrum Project.
The European Organisation for the Safety of Air Navigation Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012.
SESAR Single European Sky Air traffic management Research
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Can our ATM systems cope?
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
December 2010iTEC - Designing the future classroom1 אלף כיתות משתתפות במיזם לעיצוב כיתת הלימוד העתידית – iTEC דב וינר iTEC – Designing the future classroom.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Nigel Makins EUROCONTROL
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
EUROCONTROL European Organisation for the Safety of Air Navigation.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
2 nd Workshop, April 2006 Session 4: Integrating ASAS in an evolving ATM system.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
SESAR and GA Michael Erb Member of SESAR Excom IAOPA Regional Meeting Larnaka, 22nd September 2007.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT ASAS-TN2 3rd Workshop – Glasgow 11 September 2006 ASAS-TN2 Third workshop Address by the Commission.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Digital In The Skies Simon Daykin NATS Chief Architect.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Chris Shaw, EUROCONTROL Experimental Centre
The Single European Sky Implementation Programme: SESAME
Communications Operating Concept & Requirements (COCR)
Directorate-General Energy and Transport
Soren Dissing - EUROCONTROL
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation & Future Research

2 Two thoughts about ASAS / ADS-B … “We are not implementing fast enough” “We are not preparing the future”

3 A quotation from a Member of UK Parliament Mr Tom Brake (UK) … “May I ask the Minister a slightly more detailed question about the technology? I understand that there are air traffic control systems that could be based on individual aircraft and how they relate to one another. My understanding is that SESAR will not take that route. If I am correct, is there not a risk that in future Europe will be lumbered with an air traffic control system that is five or 10 years behind the best technology solution?”

4 Need to Implement Integrated Future Research Summary

5 Need to Implement: What have we got today? US: starting to implement – ADS-B surveillance, spacing applications Australia: starting to implement – ADS-B surveillance Europe: CASCADE: ADS-B out, situation awareness … But, a lot of research over years with little return: defined Package 1 but are looking at Package 0.25 implementation!! Overall: No significant change to ATM New technology still not implemented (data link/ADS-B)

6 Need to Implement: Why do we need to move forward? The capacity of the ATM system has almost caught up with demand

7 Need to Implement: PRR8: Traffic Demand Very high growth in Central and Eastern Europe. Managing such high growth does present a challenge. ATM should be responsive enough to manage growth and adapt to unforeseen changes. Growth

8 Need to Implement: Demand is taking off Traffic growth is robust: 4.5% for 2005 with summer (peak) growth at 4.7% Capacity has not been able to keep pace Growth in 2006 is forecast at 4.1% Mid-term forecasts predict 26% in 6 years (with a high of 37%) 2020 could quite conceivably see levels double 2005

9 Need to Implement: We are running out of quick wins Scope for capacity increase by re-sectorisation and airspace restructuring in the core area is rapidly decreasing PRR 8: “in some parts of the core area the sector throughput is already high (e.g. 55 a/c per hour in many sectors of Maastricht UAC) … additional capacity is required... which calls for specific solutions …”

10 Need to implement: Disappointing validation results “ Many of the things we thought would generate significant capacity (tools, free-routing, data-link services …) have disappointed either in validation exercises or real-world experience”

11 Need to Implement: Where could ASAS fit? WP3 in ASAS TN provides an glimpse of maturity: NRA and Spacing look relatively mature – what’s holding them back? Why are we not implementing? What do we have to do to convince? Building links into other concepts to ensure acceptance Systemisation, P-RNAV, CDA Innovate the business case – take a risk!! Australia – take a decision!! US – renting out the boxes!! What can we exploit in Europe? Percentage equipage 1090 ES (35% already) NRA Spacing

12 Need to Implement Integrated Future Research Summary

13 Integrated future Research: Meeting the 2020 challenges 2020: Doubling the traffic Need to break out of the traditional ways of thinking Need genuinely new solutions to ATM Encourage those who are prepared to take risks Invest in potential breakthrough solutions Work together!!

14 Integrated future Research No current long term large scale Air Ground Integration, 4D or ASAS research projects So: “How can we build on SESAR, FP7 and local bottom up approaches”

15 Integrated future Research: A way forward Pull together the approaches on Package 2 & 3 10 years ago we had PHARE on 4D More recently we have had MFF on ADS-B / ASAS We can question the concept but research was done How can we benefit from this Things to build on? Lessons to learn? Are we ready to build an integrated research programme for advanced Air Ground Integration applications in Europe Implementation driven? In SESAR? In FP7?

16 Integrated future Research: Integrated future Concept Rely on the strengths of each concept element: 4D for flow management, planning and avoidance of overloads to ensure system efficiency ADS-B / ASAS for local tactical control to ensure safety and maximise capacity

17 Integrated future Research Pan European Business / benefit driven Attract decision makers!! Key stakeholders Key system elements represented Conceptual Technical Human Factors & Safety Operational Beyond Paper Simulation Live trials – real operational reality!! Confront technology!!

18 Need to Implement Integrated Future Research Summary

19 Summary Build on SESAR and Joint Undertaking to implement Put ASAS Package 1 into SESAR! Build on SESAR and FP7 and put your effort together to develop a long term programme Is it a virtual programme of loosely coordinated projects? Or will it be an ambitious and forward looking programme e.g. PHARE and MFF Irrespective, it needs to be a recognised approach in SESAR (lobbying) This is our challenge! Work Together!! Dare to take risks!!!