Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

Frankfurt (Germany), 6-9 June 2011  Smart charging Costumer satisfaction Avoiding unneccessary grid investments Integration of renewables Anders Holm.
Trend of Distribution Network in Shanghai SMEPC 6-9 June 2011 May 23.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
Frankfurt (Germany), 6-9 June 2011  In France, LV customers are mostly < 18 kVA and single-phase.  Some LV networks are unbalanced and it generates important.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Smart Grid Protection RT 3 b
Frankfurt (Germany), 6-9 June 2011 EN voltage dips and swells classification as an instrument for responsibility sharing Maurizio Delfanti Department.
Smart Grid Research Consortium Conference Austin, Texas Mark Ponder President ElectSolve Technology Solutions and Services, Inc.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – RT 3b – 0220 UFLS with dispersed generation BKW FMB Energie AG Switzerland Florian Romanens Round Table.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
1 Fault Assistance Centre David Talbot & Chris Armstrong September 2014.
EU Commission Task Force for Smart Grids Expert Group 3: Roles and Responsibilities of Actors involved in the Smart Grids Deployment Samia Benrachi-Maassam.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
Frankfurt (Germany), 6-9 June 2011 ENEL Group Italian core European base Worldwide strategy Italy’s largest power company. Europe’s second listed utility.
Allan Miller Director Electric Power Engineering Centre (EPECentre) Introduction to: Renewable Energy and the Smart Grid GREEN Grid 1.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Electrical Distribution Training
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Costs of PQ Networks José María Romero Gordon Frankfurt (Germany), 6-9 June 2011.
Frankfurt (Germany), 6-9 June 2011 Round Table RT5c/4a "INTEGRATION OF PLUG-IN-VEHICLES IN DISTRIBUTION NETWORKS. CONTRIBUTIONS FROM 2 MAJOR EU FP7 PROJECTS:
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Frankfurt (Germany), 6-9 June 2011  Chin Kim Gan, Marko Aunedi, Valdimir Stanojevic, Strbac Goran, (Imperial College)  Dave Openshaw (UK Power Networks)
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Frankfurt (Germany), 6-9 June 2011 Detailed Analysis of the Impact of Distributed Generation and Active Network Management on Network Protection Systems.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Advanced Sensors for the Smartgrid
Frankfurt (Germany), 6-9 June 2011 Improving the data quality of the LV-connectivity Intro Problem statement  What  Why Proposed solution Case Conclusion.
Implications of regulatory changes of the market model on the distribution business.
ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%
Integration of electric vehicles to the distribution grid Nina Wahl Gunderson and Kjell Sand SINTEF Energy Research Norway.
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.
Frankfurt (Germany), 6-9 June 2011 Jukka Lassila – Finland – Session 6 – Paper 0773 Network Effects of Electric Vehicles Case from Nordic Country LUT Jukka.
Frankfurt (Germany), 6-9 June 2011 HOW THE CUSTOMERS PERCEIVE THE PROBLEM OF VOLTAGE QUALITY Martin KAŠPÍREK David MEZERA
Frankfurt (Germany), 6-9 June 2011 Paulo Pereira – Brazil – Session 2 – 0993 OPTIMIZATION OF VOLTAGE REGULATOR SETTINGS AND TRANSFORMER TAP ZONES IN DISTRIBUTION.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
RT1b – EDF R&D Frankfurt (Germany), 6-9 June 2011  Smart Grids require a system approach and modularity  Smart Components will rely on nodes of integration.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Measures to Improve Power Quality in Distribution System
Paper 2.59 COMPREHENSIVE DEVELOPMENT OF POWER QUALITY MANAGEMENT AND EVALUATION OF VOLTAGE DIP PROBLEMS A. Mäkinen, P. Järventausta, P. Verho, Tampere.
Regulators Indices on Power Quality
Tailor-made solutions in response to increased demands on supply quality … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)
ADVANCED POWER QUALITY MEASUREMENT CAMPAIGN
Power quality monitoring in the French distribution system
LFEIC Survey of Harmonic Voltage Distortion Levels in Europe – Discussion of Results and Implications.
Customer Profiles – Analysing the customers of today
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on behalf of Eurelectric

Frankfurt (Germany), 6-9 June 2011 Objectives of Fixed PQ Monitoring  Monitor PQ trends over time  Confirm that PQ is within planning limits  Provide information to DSOs to :- Validate customers complaints of PQ disturbances Assist customers with mitigation measures Assist customers with sensitive processes on location choice  Monitoring performance where a PQ contract has been agreed

Frankfurt (Germany), 6-9 June 2011 Extent of Monitoring  Not necessary to monitor all HV/MV substations  Representative sample Urban / Rural Geographic Spread  Strategic Locations Concentration of sensitive/important customers Concentration of embedded generation  Portable Instruments Necessary to investigate customer complaints

Frankfurt (Germany), 6-9 June 2011 Power Quality instruments on MV Busbars in HV/MV Substations  82% DSOs have PQ Monitoring at some HV/MV substations  Approx 50% of DSOs monitor between 0% and 30% of MV Busbars

Frankfurt (Germany), 6-9 June 2011 VQ Monitoring Challenges  Costs Communication Storage Software  Presentation  External access  Harmonized format for storing data Different recorders

Frankfurt (Germany), 6-9 June 2011 VQ Monitoring : New Requirements  Developments affecting LV Systems New Loads  Electric Vehicles  Heat Pumps Distributed Generation  SMART Metering Voltage level Voltage dips & swells

Frankfurt (Germany), 6-9 June 2011 Responsibilities  DSOs Planning the system for adequate VQ  Emission limits for customers installations  Equipment Providers Disturbance Emission limits Immunity of equipment  Customers Protection of sensitive equipment & processes

Frankfurt (Germany), 6-9 June 2011 Voltage Dips  Not possible to eliminate OH Line networks especially challenging  Possible to reduce frequency / severity: Faster Protection Undergrounding of overhead networks  Substantial Investments / Long timescales  Customer willingness to pay ?

Frankfurt (Germany), 6-9 June 2011 Voltage DIPs  Some customers sensitive to voltage dips Economically important customers  Economic solution is often in customers installation  Report of JWG C4.110 Voltage Dip Immunity of Equipment and Installations

Frankfurt (Germany), 6-9 June 2011 Voltage Dip & Swell Classification in EN  Will assist discussion between customer & DSO

Frankfurt (Germany), 6-9 June 2011 Conclusions  DSOs view VQ Monitoring as important Most DSOs have some monitoring already  New VQ Monitoring Challenges & Opportunities  Responsibility for Equipment is shared DSOs, Equipment providers, Customers  Standardisation continues to make a key contribution