Department of Correctional Services NEW GENERATION CORRECTIONAL CENTRES BRIEFIENG SYNOPSIS DEPARTMENT OF CORRECTIONAL SERVICES.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Market Orientation and Service Capability of Tendering Agent China Tendering & Bidding Association Li Xiaolin.
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
Value for Money Edward Farquharson 12 May Agenda Development of the UK’s approach to ex ante VfM assessment Ex post VfM assessment Some observations.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
Claire Phillips Project Director Partnerships UK 30 November 2004 Scottish Executive Lessons Learned from KSR.
Public Private Partnerships MUNICIPAL PPP CONFERENCE Date: 18 February 2010.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON HOME AFFAIRS STATUS OF THE AMENDMENTS TO THE REFUGEE ACT AND RELOCATION OF REFUGEE RECEPTION OFFICES CLOSER.
Department of Correctional Services Transforming prisons into correctional centres - places of new beginnings DEPARTMENT OF CORRECTIONAL SERVICES.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
1 OUTSOURCING OF SERVICES : DEPARTMENT OF CORRECTIONAL SERVICES 14 October 2009.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
Honoraria for Design Build Projects Methodology Assessment Matrix.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Financial Statement 2010/11 Annual Grant and Sponsorship  The NAMC received funding of R million during the 2010/11 financial year from the Department.
Overview on Fiduciary Aspects, Procurement and Audit IFAD India Country Office.
Managing Risks in PPP Project Procurement Claire Phillips Project Director, Partnerships UK 24 March 2005.
1 Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 18 August 2010.
Topic1b: Project Life Cycle
Early Market Briefing Proposed tender for the Australia-Timor-Leste Partnership for Human Development (ATLPHD) 14 September 2015, Dili.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17.
Advise | Design | Integrate | Deliver Subcontractor fee structure – FND Phase 1 Manchester 8 th June 2009.
PRESENTATION: PORTFOLIO COMMITTEES ON CORRECTIONAL SERVICES AND HEALTH PROVISION OF HEALTH CARE WITHIN CORRECTIONAL CENTRES 1.
Waste Procurement – Next Steps Waste Management Panel 14 April 2009.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Department of Correctional PRESENTATION ON THE DEVELOPMENT OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES DEPARTMENT OF CORRECTIONAL SERVICES.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
OUTSOURCED SERVICES: DEPARTMENT OF CORRECTIONAL SERVICES.
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Presentation to the Joint Oireachtas Committee on Transport Assessment, Approval, Public Sector Benchmark and Procurement of PPPs 23rd September 2003.
DEPARTMENT OF CORRECTIONAL SERVICES
Jacobs Aston Conference 2009 The vital role of local government and PPP capital programmes Chris Wilson Executive Director 4ps 30 th April 2009.
INTRODUCTION AND IMPLEMENTATION ON THE CODES OF GOOD PRACTICE FOR BROAD – BASED BLACK ECONOMIC EMPOWERMENT.
1 THE DEDICATED PPP UNIT OF THE SOUTH AFRICAN NATIONAL TREASURY Philippe Burger University of the Free State South Africa.
Department of Labour ICT TRANSITION AREAS OF CONCERN 10 September 2013.
Roles and responsibilities PM
DCS 2010/11 ENE BUDGET ALLOCATIONS PORTFOLIO COMMITTEE
Quality Control in Preparing and Managing PPP Projects
Fair Go Rates System Dr Ron Ben-David Chairperson
DCS PORTFOLIO COMMITTEE PRESENTATION NEW CORRECTIONAL CENTRES
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PhD student, G. Mehedinţu, Prof. Univ. Dr. Ing. N. Postăvaru
PRESENTATION OF MONTENEGRO
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
School Cleaning Update
Pre-contract Planning and Practice
PROJECT DELIVERY METHODS
Fair Go Rates System Dr Ron Ben-David Chairperson
Department of Corrections Services Strategic Plan for 2006/ /11
Perspective of Typical Dayroom at Housing Module
Procurement Planning Mani Ram Gelal
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
Building a secure Home Affairs
Outputs Estimated Tendering Process Timeline (16 – 31 weeks)
Honoraria for Design Build Projects Methodology Assessment Matrix
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

Department of Correctional Services NEW GENERATION CORRECTIONAL CENTRES BRIEFIENG SYNOPSIS DEPARTMENT OF CORRECTIONAL SERVICES

Department of Correctional Services Scope Developments since 2000 to Bidding Stage Bid adjudication and IQS report Current developments Second Group of New Generation Correctional Centres

Department of Correctional Services A Developments since 2000 to Bidding Stage Blue Print model developed by Private consultant. Through NDPW Consultant teams were appointed to develop the Blue Print further. Original Blue Print costs was estimated at R150 million Short comings were identified and resulted in Baseline 1 at a cost of R230 million. This followed by Baseline 2 and later Baseline 3 at R282 million. With escalation Baseline 3 increased to R350 million. Still further developments resulted in Baseline 4 which was 18% over Baseline 3’s cost of R350 million. Tender documentation was completed early in 2004.

Department of Correctional Services B. Bid Adjudication and IQS Report Three of the projects, Kimberley, Leeuwkop and Nigel were split into phases. * Phase I – Bulk Earth Works * Phase II – Main Contractor with Incubator program sub-contractors Phase I : Was fully completed on July 2005 at all three Centres with a total cost of R80.8 million Phase II: Bids were called for Klerksdorp 5/11/2004; Nigel 25/02/2005; and Kimberley 04/03/2005 and received for all three. Kimberley: Bid adjudicated in April 2005 and came to R571.7 million Klerksdorp: Only one Bid was received and rejected. Nigel: Bids received but not adjudicated. (Waiting for appointment of Private Project Manager)

Department of Correctional Services Bid Adjudication and IQS Report Continue Outcome of Bid Adjudication show that cost of centres is substantial higher than the budgeted amount.. In July 2005 DCS decided to appoint with the assistance of NDPW an IQS to evaluate the bids documentation and to provide both Departments with an assessment of the price escalation and compare it with market trends. The IQS report highlighted the following: The incubator procurement model. Increase in building costs. Timing of the tenders in respect of market conditions This negatively influenced the bidding process.

Department of Correctional Services C. Current Developments The following aspects were taken into consideration to continue with the bidding programme: Report of the IQS Repot from the Transactional Advisor on the refinancing of the existing PPP correctional centres. Interim report on the feasibility studies for the second group of Correctional Centres. Recent developments at Kuthama Sinthumule Correctional Centre. State of the Nation Addres.

Department of Correctional Services This lead to the following decisions: Decided to continue with Kimberley with the following difference Abandon the Incubator programme (Premium DCS is paying for this route is ± 14% of the cost) Adjust Bidding documentation to allow for main contractor and own choice of sub-contractors. Call for open re-bidding system to allow a larger sector of the contraction market to submit bids. Will be more competitive and to the advantage of DCS. Tender documentation will be published on 5 May 2006 with the target date to handover the site to the successful bidder in September 2006 Current Developments Continue

Department of Correctional Services On Klerksdorp and Nigel the following: The current bids received have lapsed. DCS will go a new direction of PFM (Public Finance Model) with these projects. PFM called for Public to design by concept construct finance and maintain the project while the Management is vested in DCS Terms of reference for the Transaction Advisor to manage this process was drafted with the assistance of NDPW and National Treasury. Tenders were called for a Transactional Advisor to do a feasibility study on this route.

Department of Correctional Services Leeuwkop is subjected to a viability study for the following: Long term feasibility of the complex. Direction to follow in regards to the Agricultural concerns currently established on the premises. Viability study on the whole asset management of the complex.

Department of Correctional Services D. Second Group of New Generation Correctional Centres Feasibility studies in process for the following East London, Paarl, Port Shepstone and Polokwane Areas. Sites earmarked for three of the four complexes. Polokwane still in a negotiating stage. DCS to follow the Project Finance Model on all these projects. The current Transaction Advisor agreed in principle to complete the process within the parameters of the project finance model.

Correctional Services values your role in breaking the cycle of crime: in making rehabilitation work. Thank you Together we can strengthen the social compact against crime, for a better life.