Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.

Slides:



Advertisements
Similar presentations
Status reports: Production environment Trigger simulationM. Palutan, B. Sciascia EmC responseS. Miscetti Background selectionS. Miscetti, M. Moulson DC.
Advertisements

Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
Page 1 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status e1-dvcs2 Run Status Maurizio Ungaro University of Connecticut.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
Catalina Curceanu LNF-INFN October, ECT* (Trento)
Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
L1 Trigger for ACDC Jianchun (JC) Wang Syracuse University VELO ACDC Software Meeting 01/20/2006.
B.Sciascia Kpm Meeting - LNF - February, 3 rd Charged kaon meeting LNF - February, 3 rd 2004 B.Sciascia TagBias  Bug on error calculation  Sensitivity.
Status of calorimeter simulations Mikhail Prokudin, ITEP.
Working Group Meeting (McGrew/Toki) Discussion Items (focused on R&D software section) Goals of Simulations Simulation detector models to try Simulation.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
Progress on BR(K L  p + p - ) using a double-tag method A. Antonelli, M. Antonelli, M. Dreucci, M. Moulson CP working group meeting, 25 Feb 2003.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
A proposed plan for fine tuning of EMC MC The plan is to :  SURVEY the existing situation over the runs - Validation of plots using  and.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Barbara Sciascia July,29 th - LNF 1 Barbara Sciascia K  semileptonic decays Charged Kaon Meeting July, 29 th - LNF Single photon efficiency in KPM events.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
Preliminary Measurement of the Ke3 Form Factor f + (t) M. Antonelli, M. Dreucci, C. Gatti Introduction: Form Factor Parametrization Fitting Function and.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
ALICE Computing Model A pictorial guide. ALICE Computing Model External T1 CERN T0 During pp run i (7 months): P2: data taking T0: first reconstruction.
Data vs MC … issues of the K +- group 1.Accidentals … contribution from Erika & Roberto 2.DC background.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
NA62 Collaboration Meeting – Anacapri 1 September 2009 Massimiliano Fiorini CERN.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
MC/OFFLINE meeting  Status  Request by Ke2 group  aob LNF
Update on the false-dead DC wire problem
KLOE offline & computing: Status report
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Salvatore Fiore Università di Roma “La Sapienza”
MC ’04-’05 objectives                                                       
Kloe plans for 500 pb-1 Since now up to mid/end 2003
DCH calibrations 2013 Gordon Lim, UCI.
G. Venanzoni-LNF KGM Frascati, 19 Dec 2006
KLOE General Meeting - LNF March,
BESIII EMC electronics
Presentation transcript:

Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires –MC 2001/02 LNF 9-Jun-05

Remarks from LNFSC and CSN1 Offline status/priorities discussed at closed session of LNFSC (24 May) –Need for prompt MC04/05 production emphasized by LNFSC members –Requests for additional CPU and disk space supported Requests for computing upgrades discussed with KLOE CSN1 computing referees yesterday (8 Jun) –6 new 4-way 1.5 GHz Power5 1 Power5 = 8 B80  new machines equivalent to 192 B80s Total KLOE computing power 200  392 B80s –20 TB of additional disk space for DST staging Requests will be discussed at the next CSN1 meeting in Trieste 6-7 Jul One strong possibility purchase 2 of 6 boxes now –No gara needed, machines could arrive in less than 1 month

Update on MC04-05 (1/3) New interaction region –CB implemented, needs test, timescale? Attenuation lengths vs endcap module numbers –CB attentuation lengths reversed. CLUADJUST correction? Energy scale calibration –Need to clarify above correction. Who? Regeneration and nuclear interaction –CB has divided interaction code for EmC and other regions –Who will test? Timescale? EMC time resolution –Insert C. Gatti correlated term in t0 smearing code, uncorrelated term in clustering simulation code –Who?

Update on MC04-05 (2/3)  generator –FN working on adding FSR Additional generators – K S  pp e + e - (CG, TS) added to MC (CB) –p +  e + n (?) –p 0  e + e - (?) – K S  p 0 e + e - exists (FB, VP), needs to be added Trigger –Simulate period with high time jitter –Quality check on torta –Simulate DC trigger threshold –DISH map –Report from BS, MP

Update on MC04-05 (3/3) DC tracking resolution –AA, PDS, MM, TS volunteers –No work underway yet Correlated noise in DC for charged kaons –EDL, PDS + charged kaon group –No progress yet lsb insertion code –MM in progress –Some code written Fix discrepancy in SQZ library –MM in progress –FIXIS works but source of problem not yet fully understood

Other offline activities Reprocessing: –To date 85 pb -1 of 2002 have been reprocessed (from run to 25000) –We switch to all the CPUs in the last days (during the DAFNE shutdown), with a rate of 10pb-1/days –We will continue…. False dead wires list: –Last week the correct list of dead channel for 2001/02 was inserted in the DB. At the moment we use test tables. Dcdelete can read test tables or normal –We started the submission of physmon for 2004.

Other offline activities MC2001/02: –The script needs to be completed –Status of the executable? Fixis Insert the new version of nratag Fix correspondence of cluster and cell indices to allow background cells to be identified Module for downscaling accidental cluster according to Martini-Miscetti recipe Beam spread position in z