Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.

Slides:



Advertisements
Similar presentations
Bio-Rad Labs. Chromatic Aberration Sources and Measurement.
Advertisements

Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
ABRF meeting 09 Light Microscopy Research Group. Why are there no standards? Imaging was largely an ultrastructure tool Digital imaging only common in.
How to make a Solar Tyre Oven With Moses from Uganda.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
In-Situ Measurements for Chemical Mechanical Polishing James Vlahakis Caprice Gray CMP-MIC February 20, 2006.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Top surface of B3L Top surface of B3L B3L12 Tried to blow off, but couldn’t Insde of tube. B3L15 The dot at the middle.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
The Lego Man Basic 3D Modelling. The Head Use the Revolve Tool to get the sketch from 2D to 3D.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
Egg Carrying Rocket Complete Your goal is to have your rocket looking something like this at the end of this section– fins attached and rocket engine block.
Date of download: 5/27/2016 Copyright © 2016 SPIE. All rights reserved. Schematic diagram of experimental setup. During the measurement, a frog or salamander.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Bioanalytik detect and identify Over 25 years experience in Imaging Benefits of NightOWL.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Date of download: 9/19/2016 Copyright © 2016 SPIE. All rights reserved. (a) A pulsatile flow bioreactor for in vitro incubation of bioengineered carotid.
Aron Fish Imperial College Mice Video Conference 01/02/06
There are 2 classification of wood joints:
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Vital imaging: Two photons are better than one
Step-by-step assembly instructions
Step-by-step assembly instructions
Marko Kaksonen, Yidi Sun, David G. Drubin  Cell 
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule

T. Matsushita 2 Assembly/QA sequence Station five assembly/QA sequence 1. Visual inspection of doublet-layers - check any damage caused during transit 2. Pre-processing; trim fibres, mark top layers, mark centre fibre 3. Bundling/QA 4. Connectorisation/QA 5. Vacuum-chuck alignment 6. Glue doublet-layer to carbon-fibre station 7. Attach connectors to carbon-fibre station 8. Cut fibres 9. Pot fibres 10. Polish fibres 11. CMM of station five

T. Matsushita 3 Visual inspection/pre-processing Inspection at IC Extra piece of fibre (~2cm) on one ribbon [no harm] Prominent round ridge of glue; might be a problem when we glue it on carbon fibre station; we use less prominent ones for station 5 Two bent fibres on ribbon 5; during transit? Fibre end trimmed evenly at FNAL. But not good enough for QA procedures Before After trimming Fibre end Ridge of glue Bent fibre

T. Matsushita 4 Quality assuarance Purpose Ensure each bundle has correct seven fibres No more/no less fibres in a bundle No swap of fibres across bundles and no skip Ensure each bundle goes to correct hole of optical connector No more nightmare of channel decoding Methods Visual scan of skipped fibre in the middle of bundles Take picture of fibre bundle to count number of fibres in a bundle Take movie of fibre scan with UV LED to check sequence of fibres

T. Matsushita 5 Quality assurance Setup LED: 20 mW, peak = 405nm 86 hours illumination shows no noticeable damage on fibre ~20 minutes 100W Mercury arc illumination did damage fibre; yellow fluorescence instead of green Spectrophotometer shows a major increase in absorption in the blue region (~400 – 450nm) LED/optics attached to translation stage Doublet layer CCD Beam spot image by CCD50 micron x ~4mm(not this size on fibres) Side view Front view

T. Matsushita 6 Quality assurance Figure shows change of fibres’ absorbance caused by exposure to mercury arc. The insets a) and b) show colours emitted by the fibres before and after the exposure. The inset c) shows emission colour of the fibres after some recovery time. a)b)c)

T. Matsushita 7 Bundling/QA First we make bundle of seven fibres; single read-out channel Seven fibres held together with heat-shrink tube “comb” [version 3] is used for bundling and QA procedure bundles of four columns ( ) for one connector (22 way) comb Comb with bunldes in grooves

T. Matsushita 8 View from end of chuck looking at the connector end of the fibre ribbon Channel mapping to comb for view x Bundling/QA – mapping to comb

T. Matsushita 9 QA – software check; counting After making 22/20 bundles, we perform QA Software check of ccd image of one connector worth bundles Chcek number of bundles according to view and connector number Check number of fibres in each bundles It works.

T. Matsushita 10 QA – software check; scanning Software check of scanning movie of one connector worth bundles (20 or 22) Check bundle sequence Bundle sequence check works. x y

T. Matsushita 11 QA – software check; scanning Define fibre centre as centre of ‘cluster’ found in counting QA Trace intensity of 9 pixels around the centre pixel in terms of time Then we get intensity of fibres in terms of ‘time’ Detect leading/trailing edges of intensity distribution at 50% of peak height Peak time of a fibre is (lead. time + trail. time)/2

T. Matsushita 12 QA – software check; scanning Fibre sequence check Peak time position of fibres in bundles as a function of time Bundle # is arbitrary No collision between bundles is ok Sequence check suffers from rough cut surface of fibres, glue on doublet-layer, etc.

T. Matsushita 13 QA – software check; scanning Top/bottom sequence check Intensity of fibres at peak time Sequence check suffers from rough cut surface of fibres, glue on doublet-layer, etc.

T. Matsushita 14 Connectorisation/QA After bundling we thread bundle through each hole of connector Fibre radius guide is used for connectorisation “bridge” is used for QA bridge Fibre radius guide Bridge with connectors

T. Matsushita 15 Connectorisation/QA– mapping Comb to bridge mapping for view X

T. Matsushita 16 Connectorisation/QA We perform counting/scanning QA for bridge as well. x y

T. Matsushita 17 Mirror check Picture of fibres taken with and without covering mirrored end with black sheet under ambient light. Connector 3 seems to have one fibre with poor mirroring. Mirrored end coveredMirrored end NOT covered

T. Matsushita 18 Vacuum chuck alignment Align the centre fibre to the centre of the vacuum chuck

T. Matsushita 19 Gluing Fix vacuum chuck, carbon-fibre station frame to gluing jig Apply glue with grin, then glue them together

T. Matsushita 20 Attach connectors to cf-station

T. Matsushita 21 Status View X [mold4#? – 22aug06] bundling/connectorisation/QA finished, glued to carbon-fibre station frame Every single bundle has seven fibres Connectorisation is all OK Fibre sequence is most likely OK. One fibre seems to have poor mirror We have record of manufacturing process We made two kinks during manufacturing process. We made one fibre bent during manufacturing process. Try to avoid these errors next time View W [mold?#? – 17aug06] Bundling/QA for connector 1-6 finished Have dim fibres; due to glue, cut surface, fibre damaged???

T. Matsushita 22 Dim fibres for view W C1 C5 c6 Fibre end damaged

T. Matsushita 23 Schedule Station 5 will be at Fermilab … beginning of December