E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
Overview of also works.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S1-G cryomodule assembly status
S0 Status report from KEK
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Don't leave yourself short of medication this Christmas!!
2. SCRF General Preparation for the AD&I Preparation for AAP Review
KEK injector cryomodule
MON TUE WED THU
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Construction and First Coo-down Test of cERL Injector Cryomodule
January Sun Mon Tue Wed Thu Fri Sat
Jan Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
Sun Mon Tue Wed Thu Fri Sat
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
IAQG Brussels meeting              April 2014        Ⓒ MHI.
Sun Mon Tue Wed Thu Fri Sat
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
Presentation transcript:

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 2 Cavity Assembly Team for S1-Global FNAL Tug Arkan (Leader) Brian Smith Marco Battistoni DESY Axel Matheisen (Supervisor, not come) Manuela Schmoekel Patrick Schilling KEK Shuich Noguchi Eiji Kako

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 3 Cavity Assembly Team for S1-Global FNAL DESY Tug Arkan Manuela Schmoekel Brian Smith Patrick Schilling Marco Battistoni Arrival date in Japan ; FNAL 13 th Jan DESY 14 th Jan Departure date from Japan ; 24 th Jan Stay in Urban Hotel for 11 nights (FNAL) 10 nights (DESY)

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 4 Present Status of Cavities Two DESY cavities (Z108 & Z109) arrived at KEK in 4th, December. ACC011 cavity will arrive at KEK in Dec. 25th. AES004 cavity will depart for KEK in Dec. 24th. Both cavities will delivered at KEK by the end of December ??

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 5 11 Mon; National Holiday 12 Tue; am. Check of tools and jigs for assembly pm. Rinsing of 9 support posts by car washer Setup of support posts in class Wed; am. Cleaning by wiping of 2 FNAL cavities Installation of 2 FNAL cav. on support in c-1000 pm. Cleaning by wiping of 2 DESY cavities Installation of 2 DESY cav. on support in c Thu; am. Rough alignment of 4 cavities in c-1000 am. Arrival of FNAL colleagues at KEK pm. Arrival of DESY colleagues at Hotel night Welcome dinner with beer Schedule of Cavity String Assembly (1)

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 6 15 Fri ; am. Meeting for cavity string assembly planning pm. Start-up of assembly work at STF 16 Sat. ~ 21 Thu. ; (for 6 days) am./pm. String assembly of 4 cavities in c Fri; am. Final leak check of string cavities Start-up of Ar slow leak in c-1000 night Farewell dinner with beer 23 Sat; Spare day for safety margin 24 Sun; Departure of DESY & FNAL colleagues 25 Mon; am. Movement of string cavities to outside of clean room Schedule of Cavity String Assembly (2)

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 7 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping system Up stream Down stream FNAL#1,#2 AES004, ACC011 DESY#1,#2 Z108, Z109 KEK#1,#2 MHI05, MHI06 KEK#3,#4 MHI07, MHI09

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 8 Eight Cavities for S1-Global 1. AES-004 (27./25 MV/m) ; Blade tuner (center) 2. ACC-011 (33. MV/m) ; Blade tuner (center) 3. Zanon-108 (31.3 MV/m) ; Saclay tuner (end) 4. Zanon-109 (30.7 MV/m) ; Saclay tuner (end) 5. MHI-05 (27.1 MV/m) ; Slide-Jack tuner (center) 6. MHI-06 (27.7 MV/m) ; Slide-Jack tuner (center) 7. MHI-07 (33.6 MV/m) ; Slide-Jack tuner (end) 8. MHI-09 (27.0 MV/m) ; Slide-Jack tuner (end) MHI (Japan), Zanon (Italy), AES (USA), ACCEL/RI (Germany) All cavity vendors in the world !!

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 9 Clean Room at KEK-STF Clean room at STF To cryomodule assembly area Air Shower Entrance HPR Pass-box Water Shower 16.2 m 5.4 m 7 m 2.2 m Class 1000 Class 10 He Leak Detector Pumping System Pumping Line Between c-10 and c-1000

E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 10 Tug, Could you make your assembly plan in clean room at KEK from 15 th (Fri.) to 21 st (Thu.) for confirmation of our works ? Request