1st Pert / CPM Problem. Pert / CPM Crashing Problem Activity Normal TimeCrash TimeNormal CostCrash Cost Immediate Predecessor A4320002600- B2122002800-

Slides:



Advertisements
Similar presentations
2.4 Write Equations of Lines
Advertisements

Project Management - Part 2
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Critical Path Method (CPM)
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
MGMT E-5050 Scott Corey CPAs Project Crashing Homework Solution.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Project Management with PERT/CPM
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Other Scheduling Methods Dr. Ayham Jaaron Chapter 11.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Project Management Techniques.
Review problem 1 QP dolls, Inc., has developed a new doll it feels could turn into a “collector’s item” through proper advertisement. The PERT/ CPM network.
Project Scheduling The Critical Path Method (CPM).
Accelerating the project Edina Nagy Lajos Kiss Szabolcs Hornyák.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
Project Management Chapter 2
Project Management Dr. Ron Lembke Operations Management.
Production and Operations Management Systems Chapter 7: Project Management Sushil K. Gupta Martin K. Starr
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
Scott Corey CPAs Project Crashing Homework Assignment MGMT E-5065 Due December 18 th.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Estimate Project Duration n Experience n Historical Data n Research n Modeling n Experiments n Breakdown/Roll-Up n Delphi Method n Consultants n Three.
WEEK 1 You have 10 seconds to name…
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
COB 300C - The Operations Dimension Project Management.
PERT / CPM – Time-Cost Tradeoffs BSAD 30 Dave Novak Source: Anderson et al., 2015 Quantitative Methods for Business 13 th edition – some slides are directly.
deterministic Fixed and known in advance, representing a
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
Project Scheduling Chapter 14.
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Magister Sistem Informasi Universitas Komputer Indonesia
وكيفية عمل التقدير النجمي
Supervision and control and control in management of organization
1 Total Slack A 3d Task Early Start Late Start Early Finish
Grade one First term Second term Learning unit Learning unit
مدیریت عمومی دانش کهن. مدیریت عمومی دانش کهن ارایه تحقیق پایان ترم 3 نمره امتحان پایان ترم 10 نمره ارایه تکالیف کلاس 2 نمره امتحانات.
Fender Bender Physics (Egg Cars)
AOA A style of project network diagram in which arrows
Thing / Person:____________________ Dates:_________________
Material management. Material can be defined as integrated.
Presentation transcript:

1st Pert / CPM Problem

Pert / CPM Crashing Problem Activity Normal TimeCrash TimeNormal CostCrash Cost Immediate Predecessor A B C D A E B F C G D,E 2 nd Pert / CPM Problem

Pert / CPM Crashing Problem Start A BE CF D FinishG

Pert / CPM Crashing Problem REQUIREMENT : (a) What is the project completion date? (b) What is the total cost required for completing this project on normal time ? (c) If you wish to reduce the time required to complete this project by one (1) week, which activity should be crashed, and how much will this increase the total cost ?