IRAM 08/02/12 – Run 3 Cryostat New Pulse-Tube (helium-free). Laboratory performances : Cooling-down time  30-48h Number of cooling cycles so far12 Base.

Slides:



Advertisements
Similar presentations
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Advertisements

IUCAF SUMMER SCHOOL 2002 MITIGATION TECHNIQUES MITIGATION FACTORS - what is it? what is it good for? by Klaus Ruf.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Requirements for a bolometer prototype at the 30m telescope S.Leclercq 23/04/2009.
University of California, Berkeley
10/05/2011SAC meeting IRAM Grenoble1 Recent Results with NIKA & GISMO at the 30-meter telescope Samuel Leclercq.
TES Bolometer Array with SQUID readout for Apex
RUN HISTORY Preparation: 17/10Cryostat, pumps and electronics mounted in the cabin (total time 2h) 18/10Cooling down to 80mK. Resonances OK (SRON array)
Second run of NIKA at the 30m telescope Samuel Leclercq 01/2011.
Radio Telescopes. Jansky’s Telescope Karl Jansky built a radio antenna in –Polarized array –Study lightning noise Detected noise that shifted 4.
SLAC, May 12th, 2004J.L. Puget PLANCK J.L. Puget Institut d'Astrophysique Spatiale Orsay.
Eusoballoon optics characterisation Camille Catalano and the Toulouse team Test configuration Calibration of the beam Exploration of the focal plan.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Thin Film Measurement Facilities Flavio Travasso N.i.p.s laboratory - Università di Perugia and INFN Perugia Flavio Travasso N.i.p.s laboratory - Università.
Cardiff University Astronomy Instrumentation Group IRAM Camera meeting October 13-14, Cardiff University Astronomical Instrumentation Peter Ade.
A. Monfardini, IAP 26/06/ Kinetic Inductance Detectors for CoRE-like applications Potentially involving (from the technical point-of-view): - Grenoble.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
GWADW, May 2012, Hawaii D. Friedrich ICRR, The University of Tokyo K. Agatsuma, S. Sakata, T. Mori, S. Kawamura QRPN Experiment with Suspended 20mg Mirrors.
Test of Silicon Photomultipliers (SiPM) at Liquid Nitrogen Temperature Yura Efremenko, Vince Cianciolo nEDM CalTech Meeting 02/14/2007.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
HARP / ACSIS A B-Band Survey “Camera” (Sub)Millimetre Observing Techniques Russell O. Redman.
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
Lecture No. 3.  Screen resolution  Color  Blank space between the pixels  Intentional image degradation  Brightness  Contrast  Refresh rate  Sensitivity.
A. Monfardini, IAP 30/07/ NIKA (Néel IRAM KID Array) First light at the 30-m IRAM dish NIKA collaboration: - Institut Néel - Grenoble - AIG - Cardiff.
IPBSM status and plan ATF project meeting M.Oroku.
ATLASGAL ATLASGAL APEX Telescope Large Area Survey of the Galaxy F. Schuller, K. Menten, P. Schilke, et al. Max Planck Institut für Radioastronomie.
Polarization at IRAM Status and Plans S.Guilloteau Laboratoire d’Astrophysique de Bordeaux.
Neel IRAM KIDs Array - Cryostat - Filters - Cold electronics - Measurement methods and assumptions for Sensitivity calculation - Antenna-coupled 42 pixels.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Beam Polarimetry Matthew Musgrave NPDGamma Collaboration Meeting Oak Ridge National Laboratory Oct. 15, 2010.
Stability of the electron energy Recycler department meeting April 5 th, 2006 A. Shemyakin, M. Sutherland.
N I K A Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento Néel IRAM KIDs Array Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento.
DECREASED FLICKER SENSITIVITY WITH A SCANNED LASER DISPLAY. J.P. Kelly 1, H.L. Pryor, E.S. Viirre, T. Furness III. 1 Children's Hospital & Medical Center;
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Neutron detection in LHe ( HMI run 2004) R.Golub, E. Korobkina, J. Zou M. Hayden, G. Archibold J. Boissevain, W.S.Wilburn C. Gould.
Array for Microwave Background Anisotropy AMiBA SZ Science AMiBA Team NTU Physics Figure 4. Simulated AMiBA deep surveys of a 1deg 2 field (no primary.
Clusters of Galaxies in the Microwaves
Welcome to the technical meeting on the future bolometer instrument for the IRAM 30m telescope Monday morning: presentations: context and site, 10 arcmin.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
First DR FFT Results on Advanced LIGO Using Perfect and Imperfect Optics By Ken Ganezer, George Jennings, and Sam Wiley CSUDH LIGO-G Z by Ken.
F.-Xavier Désert IRAM NIKA 8 February 2012 p. 1/21 NIKA run#3 October 2011 Report on data analysis February 2012 F.-Xavier Désert on behalf of the Nika.
Jan URSI1 Fast Switching Phase Compensation for ALMA Mark Holdaway NRAO/Tucson Other Fast Switching Contributors: Frazer Owen Michael Rupen Chris.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
Using the DATA TABLE, respond to the following: TEMPERATURE Describe the trend(s) in temperature throughout the period. What might explain the trend(s)?
Status DETECTORS: -Baseline for 2mm: -Baseline for 2mm: NICA 5a (144 pixels, IRAM, 30nm sputtering); average sensitivity: 6mK/Hz 0.5 (1Hz) corresponding.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Preliminary Profile Reconstruction of EA Hybrid Showers Bruce Dawson & Luis Prado Jr thanks to Brian Fick & Paul Sommers and Stefano Argiro & Andrea de.
ETC Block Diagram. Source Spectrum is derived from: Spectra Type –Stellar (50 stellar types) –Galaxies (elliptical, spiral) –QSO Luminosity Profile –point.
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
HBD Transmission Monitor Update III: Noise Analysis B. Azmoun & S. Stoll BNL HBD Working Group Meeting 10/10/06.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- THERMAL STEPS ANALYSIS Goals & Means : –apply a “step function” on the cooling water –look at : APD response.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
TCT measurements with strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž 1,2, Marko.
30GHz system improvements Jan Kovermann RF meeting
BNL-SLAC-Annecy TeleConference
Daniel Sigg, Commissioning Meeting, 11/11/16
The first light of the Corot telescope.
AGATA Detector Work Performed at Saclay in lessons learned -
NIKA Oct 2009 Run: Calibration & Sensitivity
Commissioning the Fast Orbit Feedback System at SSRF
Status DETECTORS: We have a first baseline array (144 pixels) at 2mm. Average sensitivity: 6mK/Hz0.5 (1Hz) Without de-correlation. In 2009 it was roughly.
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
07/08/2010 Fill #1264 dump at 02:14:38.
Apex scanning strategy & map-making
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
LHC BIF test setup - update
Presentation transcript:

IRAM 08/02/12 – Run 3 Cryostat New Pulse-Tube (helium-free). Laboratory performances : Cooling-down time  30-48h Number of cooling cycles so far12 Base T: 70-90mK Small problems at the telescope compared to lab : - have to use the maximum allowed He pressure in the pipes (OK) - the thermal connection linking the two still could have break during transport, so we had strong oscillations in the still T at the beginning (100mK !). Solved by using the still thermometer as a heater. Cooling down time at the telescope :36h Base T at the telescope :  80 mK T regulation :90 ± 0.01 mK (stable over a week) Power :about 5  W Liquid nitrogen consumption (trap) :25 liters for cooling down + 25 liters per week (max)  READY FOR LONG RUNS

IRAM 08/02/12 – Run 3 Optics LENSES : LENSES : same as 2010 (corrugated – IRAM) FILTERS : FILTERS :same filters, added diaphragm at 80K to (try) reduce the stray light SPLITTER : SPLITTER :replaced the grid polarizer by a dichroic. The 2mm array is thus now in reflection, while the 1mm is in transmission. NOT OPTIMIZED AT 45 deg - REFLECTION. THE LOSS IN TRANSMISSION IS ABOUT 15%.

IRAM 08/02/12 – Run 3 Arrays - electronics 2 mm : Hilbert dual-polar (NICA 8c). « Markus design » 132 pixels (12x12 array) Pixels pitch: 2.3mm   0.75F· (very close to the final design) Wafer thickness: 300  m Backshort: 700  m Al thickness: 20nm Cold amplifier:YEBES GHz Electronics:ROACH board (116 channels) 1.25 mm : Hilbert dual-polar (NICA 8c). « Markus design » 132 pixels (12x12 array) Pixels pitch: 2.3mm   F· (planned to reduce to 1.6mm) Wafer thickness: 400  m Backshort: 1100  m Al thickness: 20nm Cold amplifier:Caltech SiGe 0.5-4GHz Electronics:ROACH board (116 channels)

IRAM 08/02/12 – Run 3 Weather THE WEEK BEFORE : THE WEEK BEFORE : GOOD DURING THE RUN : DURING THE RUN : VERY UNSTABLE BETTER TAU = (first two nights) MOSTLY … TAU = VERY WINDY RAIN, SNOW AFTER THE RUN : AFTER THE RUN :PERFECT BAD: 1.25mm BAND PARTICULARLY AFFECTED GOOD: a very limited number of hours have been subtracted to the 30-m observations.

IRAM 08/02/12 – Run 3 Installed  OK

IRAM 08/02/12 – Run 3 Good news : B shield Added a thick (2mm)  -metal screen (cylinder) at 300K (around the cryostat). This kills by a factor of > 100 the radial B fields, by a factor about 20 the axial ones. + a superconducting (Pb) cylinder at 1K (around the still screen) LARGE SLEW During this run no more « jumps » or strange (e.g. « 50 s ») disturbances from the cabin. We don’t even « see » if the chopper is ON of OFF.

IRAM 08/02/12 – Run 3 Noise (2 mm) Noise around 2 Hz/Hz 0.5  roughly like in 2010

IRAM 08/02/12 – Run 3 Noise (1.25 mm) Noise around 2 Hz/Hz 0.5  like the 2 mm

IRAM 08/02/12 – Run 3 An example (1.25 mm) Tau > 0.3

IRAM 08/02/12 – Run 3 2 mm – Preliminary sensitivity GMAur (60mJy) Quick-look map. Filtered, not decorrelated. Single scan (12 min) Conservative estimations, independently made from Xavier and Cardiff, indicate better than 20mJy·s 0.5 per beam. Means roughly two times better than in Mainly. thanks to the dual-pol. VERY ROUGH VERY ROUGH (pixel S/N) estimate. Response is around Hz/Jy (1.5-2kHz signal on Uranus, 20Jy). The noise was 2Hz/Hz 0.5 so it seems that: S/N = mJy/Hz 0.5 /pixel  consistent

IRAM 08/02/12 – Run mm – Telescope See Xavier for real numbers. In any case, despite it’s still worse than MAMBO-2, it improved by a factor  4 with respect to RUN2. M82 - SINGLE SCAN

IRAM 08/02/12 – Run 3 Wrong 1.25 mm !! Misplaced 8 cm -1 low-pass (1K) Plans for 1.25mm (2012): - No need of band-defining filters (using the dichroic) - New arrays. Smaller pixels on thinner substrate (Markus) 2mm not bad: T > 0.2 in GHz band In any case not so easy to fill the entire 1mm band

IRAM 08/02/12 – Run 3 Not understood … glitches - rate variable between scans (by a factor of 5). Normal rate : one point every 4-20sec ( data points) above 3 sigma - decorrelated between the two arrays - correlated in the same array - one single point (26Hz) - spectrum of glitches is continuous (polinomium order 2) --> a lot of them in the noise - cosmics ?? VERY unlikely for a number of reasons. Red and black : 2mm array (2 pixels) Blue : 1mm array (1 pixel) After the run, back home, we don’t see them anymore !

IRAM 08/02/12 – Run 3 RF dIdQ photometry See Xavier and Martino. PAPER IN PREPARATION.

IRAM 08/02/12 – Run 3 Still no explanations 1) 1)The « plateau » in the strong sources maps. Robert, Xavier Electronics ? 2) The beams distortion at the center of the arrays, in particular at 2mm. Optics ? Effects introduced by the dichroic ? Requires more careful checks on the sky simulator. So far just used for sensitivity and pixels localisation.