XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.

Slides:



Advertisements
Similar presentations
OPC matters Simon Morris. Topics for possible Discussion Simon Morris is OPC Chair for period 80 and 81 Rapid turnover planned for Panel membership Large.
Advertisements

Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
First Nation Student Success Program (FNSSP) Update.
How to Submit an ADED Conference Proposal. Objectives Identify the necessary steps for submitting a conference proposal Identify information required.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
TAC Subaru UM 2008 K. Shimasaku (chair) - TAC Members - Statistics - Review Process - 08B Schedule - Notice.
CXC Response to June 04 Report 1.Bakeout Status: Paul Plucinsky 2.CIAO upgrade information: Jonathan McDowell 3.DS9 and visualization scripts: Jonathan.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
W3C XML Query Language Working Group Mark Needleman Data Research Associates ZIG Current Awareness Session July 13, 2000.
Template For Building Project Schedule Jazz Presentation.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
Copyright of Shell Jenniffer Gearheart-Tang Mentors September 2013.
INNOVATION PROJECT PROGRESS Sept Innovation Management Project Status Project Name: Innovation Management Project Budget : Operational Budget 2010/11.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
6 th Grade Math Mrs. Stacie Courtney Eagles. Contact Information ◦(859)
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
TRA 2008 Vili Zavrlan Malta, V. Zavrlan TRA 2008 Status Report – Oct Status Report Date and venue: Ljubljana April 21 st – 25 th, 2008.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
European Southern Observatory ESO Proposals, Prague  27 February 2009 Successful ESO proposals an overview Bruno Leibundgut (ESO)
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Overview of Thesis Submission and Examination Helen Buckley, Research Student Administrator, Graduate Studies Office (GSO).
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Swift HUG April Swift data archive Lorella Angelini HEASARC.
MAGIC Recent AGN Observations. The MAGIC Telescopes Located at La Palma, altitude 2 200m First telescope in operation since 2004 Stereoscopic system in.
VISTA Hemisphere Survey Dark Energy Survey VHS & DES Francisco Javier Castander.
Geant4 Publication Procedures Geant4 Collaboration Meeting 23 September 2013 Dennis Wright (SLAC)
Toward the Senior Review Rob Petre. Senior Review proposal details Due March 12, 2008 Competing against: XMM, INTEGRAL, RXTE, Swift, Galex, WMAP, Spitzer.
Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
GO Program: Cycle 1 process, results, and Cycle 2 schedule Koji Mukai Astro-E2 Guest Observer Facility.
1 FLOW OF ACTION FOR RESEARCHER FRGS PHASE 1/2015 Registration of FRGS Grant in RADIS System Project Leader MUST submit Registration of FRGS Grant in RADIS.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
Swift as a Rapid Wide Field Follow-up Instrument John Nousek & Jamie Kennea Penn State University Phil Evans University of Leicester International Workshop.
STSM guide COST Action FP Fibre suspension flow modelling... 1 COST Action FP1005 Fibre suspension flow modelling - a key for innovation & competitiveness.
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 30 th of October, rd Steering Committee.
25s detection of the Sy1 galaxy NGC3516 The Palermo BAT survey project Application to a sample of SDSS LINERs V. La Parola, A.Segreto, G. Cusumano, V.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
GO Program: Past, Present & Future Koji Mukai Suzaku Guest Observer Facility.
A Year in the Life Of a State Data Coordinator December, 2013.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
1 Dissemination Board Status report D.Duchesneau, C. Hagner, Y. Kudenko, I. Lazanu, A. Rubbia LAGUNA general meeting CERN June 10 th, 2013 Talks at conferences:
Science Operation of Subaru Telescope Tae-Soo Pyo 2014.Feb.25 2/25/ Subaru Winter KASI.
Teacher Evaluation Timeline
TAC Subaru UM /01/16 K. Shimasaku (chair)
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
ESO Phase 1 & 2 Procedures Gaitee Hussain
Observing with Modern Observatories (the data flow)
9th European Multidisciplinary Colorectal Cancer Congress 9-11 MARCH
Prof. dr. Giedrius Vanagas
LAMAS Working Group December 2013
Portugal 9-11 MARCH Lisbon Congress Center
Y. H. Chin (KEK) and S. Fu (IHEP)
TAC report Subaru UM 2005 K. Ohta (Kyoto)
Presentation transcript:

XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel

XMM-Newton 2 Norbert Schartel Contents Items –Status of observing program –Questions from UG members to AO4: Time allocation (OTAC) and scheduling XMM-Newton/VLT joint program (action from last UG meeting) Large programs –Status of AO5 preparations (OTAC) –Report on TOO/DDT observations Observed Swift GRB rejected –Public Relations –Publications –The X-ray Universe 2005 Mission Extension

XMM-Newton 3 Norbert Schartel Status Of Observing Program Statistics up to REV 995 ( ) –Guaranteed Time Program finished –Open Time Program A1finished –Open Time Program A2 Number of allocated targets (A and B): 412 Allocated cumulative exposure time: ks Number of successfully observed targets: 411 (99.8%) Successfully observed cumulative exposure time: ks (99.9%) Successfully observed cumulative exposure time (c): ks (12.7%) –Open Time Program A3 Number of allocated targets (A and B): 613 Allocated cumulative exposure time: ks Number of successfully observed targets: 592 (96.6%) Successfully observed cumulative exposure time: ks (96.2%) Successfully observed cumulative exposure time (c): ks ( 9.3%) –Open Time Program A4 Number of allocated targets (A and B): 462 Allocated cumulative exposure time: ks Number of successfully observed targets: 32 (6.9%) Successfully observed cumulative exposure time: ks (9.5%) Allocated cumulative exposure time (c): ks

XMM-Newton 4 Norbert Schartel AO4 Time Allocation I OTAC tool (support for rating of proposals and rating in meeting) –Successful and in general positive response 4 panels had problems, but –3 of them the tool was not correctly used, i.e. the panel chairperson could finally use the tool (after meeting) –1 of them one panel might has suffered connection problems 1 panel chairperson was not using the tool Majority of (rejected) proposals got comments: –12 scientists expressed their unhappiness with the decision or the comments –Complaint: 5 pages for large programs and 4 pages for normal programs gives large programs an advantage (which becomes important if only a fraction of the time/targets from the large program is approved)

XMM-Newton 5 Norbert Schartel Joint XMM-Newton/VLT Joint-Newton/VLT(I) programs –Simple exchange of up to 290 ks observing time –Both sides used about 33% of the available time on the other facility XMM-Newton allocated 97 ks at VLT ESO allocated 100 ks at XMM-Newton –Small number statistics: Too early to make a real evaluation PS recommended to continue with the joint program in AO5 without changes –Accepted programs from XMM-Newton OTAC: Sciortino /A Very Deep XMM-Newton Study of the rho Oph Star Forming Region Ranalli / Gaseous abundances in NGC3256 –Accepted programs from VLT TAC: D-0349 Schwope / Multiwavelength mapping of eclipsing polars with ULTRACAM and XMM-Newton C-0493 Dhillon / A search for optical pulsations in the Anomalous X-ray Pulsars 1E D-0770 Clarkson / Cir X-1

XMM-Newton 6 Norbert Schartel AO4 Time Allocation II Large programs vs. “normal” programs –Not completely independent: each panel can allocate time for a large program in the “normal” budget Over-subscription per scientific category (without time for large programs): –Time available per panel is proportional to requested time 18.0% of requested time could be allocated in A or B ( ) differences are due to rounding to the next 50 ks (-18 ks, +28 ks) Over-subscription of large programs: –Large programs / all programs: 19.1% –Large programs / all programs without triggered: 17.5% –Available for large programs: 15.0% of A/B time

XMM-Newton 7 Norbert Schartel Large Programs Distribution with respect to visibility –statistics up to REV 972 ( ) Open Time Program A3 – Number of outstanding targets: 42 (6.9%) – Cumulative exposure time of outstanding targets: ksec (8.0%)

XMM-Newton 8 Norbert Schartel Large Programs

XMM-Newton 9 Norbert Schartel Status Of AO-5 Preparations New OTAC chairperson: Brian McBreen (University College Dublin) Planned key milestones (public since 23 rd of March, XMM-Newton News 48, on our web-pages): –Announcement: 5 September 2005 –Due date for proposals: 14 October 2005 (12:00 UT) –final approved program: early January 2006 –Phase 2 submission: 23 January - 17 February 2006 –Start of observations: May Scientific categories / 13 Panels in total / 66 scientists –Panels: A:2, B: 2, C: 2, D: 2, E: 3, F 2 panels OTAC chairpersons are nominated / letters of D/SCI in work Panel member search underway

XMM-Newton 10 Norbert Schartel TOO/DDT Observations

XMM-Newton 11 Norbert Schartel TOO / (Swift) GRBs burst flux peak OT / z comments [cnts] [cnts/sec] o z= Integral (R>21.0, bright source in FOV) B (R>21.8) Integral o z= no BAT position (gal. lat = 2.58deg) R< (34 deg from the Sun) B (16.81 deg from Moon?) o dark (R <~22) (R_c <~20.5) no Swift burst o z= o (no opt. follow-up) o z= XMM=5800 cts[10h] (7 hours delay, 20.3) o z= o z= o z= o (V<21.2) XMM=1200cts[10h] (R<21.2) B o B o N = 25 N(o)=12 / N(z) =7 (first short burst on )

XMM-Newton 12 Norbert Schartel TOO/DDT Rejected

XMM-Newton 13 Norbert Schartel TOO/DDT Rejected II 13/05/2005 H. Boehringer XMMU J /05/2005 J. OsborneGRB b and GRB /04/2005S. DeluitNGC /02/2005 J. M. MillerGRO J /01/2005 K. Dennerl Mars 01/11/2004 K. Dennerl Comet C/Machholz (2004 Q2) 11/08/2004 S. MolendiPerseus

XMM-Newton 14 Norbert Schartel Public Relations / ESA Science News 2004 (1 st January – 31 st of December): 9 (+ 10 internal) 2005 (1 st January – 11 th of May): 6 (+ 2 internal) All are collected at : – In 2005 changes in public relations structure of ESA

XMM-Newton 15 Norbert Schartel Publications 2004: 306 publications in refereed journals based on XMM-Newton observations

XMM-Newton 16 Norbert Schartel The X-ray Universe 2005 Announcements: –28 Oct 2004: 1st –14 Apr 2005: 2nd There are several other X-ray conferences (Dublin, Amsterdam, Cambridge, partly overlap with Munich) Registration + abstract submission ongoing: deadline end of May Poster printed and sent Invited talks: –SOC agreed on about 50% –Mike Watson and I are inviting the identified scientists Written proceedings?

XMM-Newton 17 Norbert Schartel Mission Extension Required: –highlight talk for AWG –written scientific case Support of UG Members required