LSA Developments & Scope 02 / 11 / 2006 G.Kruk for the LSA Team.

Slides:



Advertisements
Similar presentations
Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
Advertisements

Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
1 LSA Overview 06/11/2007 Grzegorz Kruk on behalf of the LSA Team.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
controls Middleware – OVERVIEW & architecture 26th June 2013
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
LHC high level core1 LHC Era Core Control Application Software Mike Lamont CERN For the LSA project team 13 th October 2005.
Stephane Deghaye (AB/CO) ATC/ABOC days.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
LSA/FiDeL1 Deliverables Commissioning:Commissioning: Transfer functions [MB, MQ, MQY, MQM, MQX etc…] DC components Decay prediction Snapback prediction.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
LHC Software Mike Lamont. LHC software - MAC November 072 7/12/2007 Outline LSA Core Hardware Instrumentation High level facilities Testing and deployment.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Commitments and Major Issues for LHC Applications Eugenia Hatziangeli on behalf of CO, OP & LSA application providers.
1 P. Chu 1 Adapting XAL for LCLS EPICS Meeting, Vancouver Adapting XAL for LCLS Paul Chu - SLAC May 1, 2009.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Technical Stop feed-down P.Charrue on behalf of the BE Controls Group 5th September 2011P.Charrue - 8h30 meeting1.
Issues concerning Device Access (JAPC / CMW / FESA) With input from: A.Butterworth, E.Carlier, A. Guerrero, JJ. Gras, St. Page, S. Deghaye, R. Gorbonosov,
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
LS1 – View from Applications BE-CO LS1 review – 1 December 2015 Greg Kruk on behalf of the Applications section.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
The Dashboard The Working Conditions The Common Chapters State What’s Next.
Archives/References for SPS Faraday Cage Timing Vito Baggiolini AB/CO after discussions with M. Arruat, J.-C. Bau, R. Billen, A. Butterworth, F. Follin,
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
Frank SchmidtLHCCWG - 8 May LHC On-Line Modeling The LHC On-line Model: what it is NOT! What is it then? The Team and the Tasks SDDS MAD-X Version.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
Commitments and Major Issues for LHC Applications
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Status and Plans for InCA
LHC Commissioning with Beam
Outcome LBDS Dry Run – week 7
Thinking outside the box
LSA/InCA changes during LS1
The Control System For LHC Hardware Commissioning
eLTC - Controls Summary
Mike Lamont on behalf of the LSA team
Tuesday TOTEM and transverse loss map (1) OK
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
BLM settings management in LSA
LHC dry-runs (BE-BI view)
Presentation transcript:

LSA Developments & Scope 02 / 11 / 2006 G.Kruk for the LSA Team

2 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

3 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Achievements in 2006 LEIR operations February-May & back in September Fully operational for SPS CNGS & LSS6 tests in July & August Hardware Commissioning

4 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Achievements in 2006

5 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

6 02/11/2006LSA Developments – CO TC – Grzegorz Kruk What’s LSA core? Optics Characteristics of the machine, layout, twiss Settings Generation Generation of the functions based on the optics Settings Management Functions or values for all parameters (physics to hardware) Trim Coherent modification of settings, revert (rollback) Hardware Exploitation Equipment Control, Measurements Operational Exploitation Sequencing, Super Cycle changes

7 02/11/2006LSA Developments – CO TC – Grzegorz Kruk What’s LSA core?

8 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Applications DatastoreDevices JAPC CMW/RDA JAPC Spring JDBC Data Access Object (DAO) LSA Client API LSA CORE (Optics, Settings Management, Trim, Generation, Exploitation) Parameters Concentration JAPC CMW/RDA JAPC Remote Server - JMS LSA Client implementation LSA Client APIJAPC API Spring HTTP Remoting / Proxies JAPC Remote Client - JMS Business Tier (Web Container) Client Tier CORBA IIOP CORBA/IIOPJDBC HTTP JMS LSA architecture

9 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

10 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 Completed database redesign (with DM) and software refactoring (with solid unit testing) Many changes over past 2 years – needed rationalization One database for all machines

11 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 Import of FESA devices & properties into the LSA database Discrete settings management (which includes expert & critical settings) General access point to all devices/properties (FESA & non-FESA) Improved EquipState application Read/Write of any properties (including FESA) Better configurability of custom commands

12 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 Extensions & improvements in the settings management Support for discrete settings Better trim rollback Included SPS RF Few important bug fixes and improvements (settings copy, trim, incorporation) Exploitation package Refactored to support transactional drive Implemented transactions for MUGEF Asynchronous drive of LHC power converters Better reporting of failures

13 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 Support for expert settings (BI) and critical settings (work began)

14 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 (PLUS) Equipment monitor (complementary to the fixed displays)

15 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main developments in 2006 (PLUS) LHC BLM concentrator (using test creates) & display Prototype of LHC BPM concentrator (both concentrators based on facilities provided by JAPC) LHC Power converters ramp & squeeze CMS luminosity monitoring (JAPC wrapper over DIP) On going HWC support (set of the day, …)

16 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

17 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Work for the coming year Settings management & trim Continue work on expert & critical settings Actual settings (LHC) (prototyping done) Not multiplexed settings (e.g. thresholds) Plus: Additional information for parameters: unit, limits (min/max), precision (rounding) Custom (enumerated) types for discrete settings Setting archives (it seems they will be useful)

18 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Work for the coming year cd.. Review core applications (Settings generation, Trim Editor, Settings Manager, …) Solve performance issues More user friendly Many extensions necessary for LHC Integration with RBAC Applications need to be adapted Authorization in LSA core if necessary Scalability test (driving 1700 PCs) How it behaves?

19 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Work for the coming year cd.. Prepare and maintain API for LHC Sequencer & other clients Timing and synchronization Generation of timing tables, events, … Monitoring of LSA parameters & other information stored in the LSA DB (e.g. accelerator mode) For applications (using JAPC) - support for GET already in place On the Front End (if necessary) Hardware Commissioning support Track subsystems commissioned

20 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

21 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (equipments) SYSTEMWhenResourcesComments CollimatorsQ3 2007S. Redaelli 6 months/2 year 1st version in place for SPS TDI/TCDQQ3 2007As above RFv1 Q2 2007Requirements spec. needed Injection KickersQ monthsSmall dedicated app. Needed Can control now from EquipState SeptaQ1 2007Standard LHC PC. To be seen if dedicated app. required Beam dumpsQ monthsDedicated app. + XPOC Power ConvertersNOW++3 monthsSettings generation exercise. Full functionality already used for HWC Warm MagnetsAs abovePotential interlock & monitoring issues Spectrometer & comp.Q4 2007Settings, monitoring, display FiDeLQ months, M. Strzelczyk Magnet error correction - Vital

22 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (instrumentation) SYSTEMWhenResourcesComments BLMQ1 2007N. Hoibian, G. KrukAcquisition, concentration and display prototyped BPMQ1 2007S. BharadeCapture mode - Acquisition, concentration and display prototyped. BPM – multi-turn analysisQ4 2007LAFSData acquisition tests in progress Bunch Current Transformers Q4 2007M. Albert BTV (Screens)Q4 2007F. FollinExtension of existing application + FD + SDDS Tune measurement & feedback Q4 2007LAFSMeasurement, analysis, feedback Chromaticity measurement & feedback Q4 2007LAFSMeasurement, analysis, feedback

23 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (instrumentation) SYSTEMWhenResourcesComments Abort gap monitorQ2 2008Dedicated application CO Radiation monitorsPrototyped: acquisition, display Rest Gas Ionisation Monitor (BIPM) Q2 2008Dedicated application Synchron Radiation monitors Q4 2007Dedicated application Wire Scanner BWSQ2 2008Dedicated application Schottky pick-upsQ4 2007LAFSDedicated application K-modulationQ2 2008Dedicated application Luminosity monitorsQ4 2007Acquisition and display

24 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (Measure & correct) SYSTEMWhenResourcesComments OrbitQ4 2007J. WenningerTrajectory for sector test plus injection optimization Collision point finderQ4 2007Dedicated application Luminosity scanQ4 2007Dedicated application Generic Scans2008Dedicated application

25 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (Operational Utilities) SYSTEMWhenResourcesComments LHC Sequencer v1 Q V. Baggiolini, R. Alemany Ferndandez, D. Raffo Work began Injection sequencingQ S. Deghaye, R. Alemany Ferndandez Interface to CBCM Settings generationNOW++2 man years – shared, LSA Core

26 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Required software (Interfaces & Standard utilities) SYSTEMWhenResourcesComments On-line modelNOW++S. Bharade, F. Schmidt (MAD) Work in progress Timing SystemS. DeghayeGeneration of timing tables, events,.. Standard Utilities AlarmsLASER teamAlready in place Post MortemPM team LoggingAP SectionAlready in place Fixed DisplaysAP SectionAlready in place Analog AcquistionOASIS teamAlready in place

27 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

28 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Resources (Staff) NameTime %Main activity Markus Albert50%Autotrim application Francois Chevrier100%HWC Guy Crockford50%TZ Stephane Deghaye40%LHC Timing Delphine Jacquet50%DB, optics, settings generation Grzegorz Kruk80%LSA core Mike Lamont80%Coordination + settings generation Lasse Norman50%Settings Generation Anthony Rey50%Settings Copy Wojtek Sliwinski80%LSA core Jorg Wenninger50%Orbit steering

29 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Resources (Temporary) NameTime %Main activity Sandeep Bharade (1 year)100%BLM concentration, Online model Agnieszka Chabrowska (TS)100%Integration with RBAC & core apps Nicolas Hoibian (1 more year)100%EquipMonitor, GUI components & core apps Marek Strzelczyk (Fellow)100%FiDeL Chi Kien Yang (6 months)100%Expert settings

30 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Resources (International collaboration) LAFS Software) – RBA, Tune & Chromaticity measurement, Schottky, SDA, …? Brookhaven National Lab – LHC injection (beta-beat, coupling), …? GSI Darmstadt - ?

31 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Overview Achievements Developments in LSA core What’s LSA core? Activities in 2006 Work for the coming year LHC required software Resources Issues & Conclusions

32 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Issues Some work can and will be passed to international collaborators, but Need to have local first-line support Medium term maintenance of these applications must be defined Technical guidance & support for non AP developers (local & external) is essential so that their products can be maintained afterwards It requires considerable amount of time and the number of temporary resource will grow The supervision effort is not compatible with the workload of the technical people in the LSA core team

33 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Conclusions A lot of work has been done Architecture is stable Validated in SPS, LEIR, transfer lines, HWC Still lots of work to be done The work can be staged over the next 2 years The available human resources are mainly temporary or part time The technical guidance issue should be somehow addressed

34 02/11/2006LSA Developments – CO TC – Grzegorz Kruk Main milestones for 2007 Continuing support for SPS, LEIR & HWC TI8 TI2 Partial & full LHC dry runs leading to machine check out