Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.

Slides:



Advertisements
Similar presentations
T Bradshaw On behalf of the SCU group 1 Status of the Superconducting Undulator Development in the UK Superconducting Undulator Workshop, Rutherford Appleton.
Advertisements

SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
Mike Jenkins and Ian Bailey. Positron Requirements of a New Collider CLIC SLCILC LHeC 6.0x10 12 e + /s 3.9x10 14 e + /s 4.0x10 16 e + /s 1.1x10 14 e +
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
ILC prototype undulator project ILC positron source meeting 31 st Jan – 2 rd feb Beijing James Rochford For the HeLiCal Collaboration.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
Mike Jenkins Lancaster University and The Cockcroft Institute.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
1 Quench study Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Amanda Brummitt, Steve Carr, Andrew Lintern, James Rochford STFC Technology RAL HeLiCal.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
HL-LHC Corrector Magnet Design & Construction Activity Status Giovanni Volpini on behalf of the LASA team CERN, January
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
BNG Industrial experience on Superconducting Undulators C. Boffo, T. Gehrard, B. Schraut, J. Steinmann, W. Walter, Babcock Noell GmbH T. Baumbach, S. Casalbuoni,
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Dr Owen Taylor Institutes Science and Technology Facilities Council (STFC) UK –Daresbury.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Magnetic Design S. Prestemon, D. Arbelaez, S. Myers, R. Oort, M. Morsch, E. Rochepault, H. Pan, T. Ki, R. Schlueter (LBNL) Superconducting Undulator Integrated.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
Undulator Insulation materials Simon Canfer Advanced Materials Group Applied Science Division Technology
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
Summary of the 2014 Superconducting Undulator Workshop Jim Clarke STFC Daresbury Laboratory and The Cockcroft Institute Beam Dynamics Meets Magnets - II,
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
Part 2: NbTi Magnet Performance Yury Ivanyushenkov for the APS SCU Team: S. Bettenhausen, C. Doose, M. Kasa, Q. Hasse, I. Kesgin, D. Jensen, S. Kim, G.
Helical Undulator Programme J Rochford T Bradshaw On behalf of the HeLiCal collaboration.
FCC Conductor Development at KAT-Korea
A model superconducting helical undulators wound of wind and react MgB2 and Nb3Sn multifilamentary wires Center for Superconducting & Magnetic Materials.
Status of the manufacturing process of a Nb3Sn wiggler prototype
The R&D programme on High Field Magnets (HFM)
HO correctors update Massimo Sorbi and Marco Statera
Yury Ivanyushenkov for the UK heLiCal Collaboration
AEGIS Magnet System.
Task 6: Short period helical superconducting undulator
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
J.C. Perez on behalf of SMC collaboration team J.C. Perez
HL-LHC Corrector Magnet Design & Construction Activity Status
Preliminary study of HTS option for CEPC detector magnet
MQYY: superconducting Quadrupole magnet for Hl-lhc
Presentation transcript:

Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012

Contents Goals Status Testing Schedule 2

3 NbTi Helical Undulator Final Parameters: 215A Beam tube ID: 4.7 mm Winding ID: 6.35 mm Field on axis: 0.86 T Margin with this conductor: 30%

(Revised) Goals To create two identical undulators with Nb 3 Sn 300mm long and direct comparison with previous NbTi undulators The same period, diameter, winding groove etc as NbTi 4

Supercon – final wire choice 5 Field on axis 1.2T 40%> NbTi Operating current 720A Peak field on conductor 3.5T

Supercon Test Results from CERN 6 Operating current 720A required Wire will quench at <4T Not ideal but we will gain useful experience by winding an undulator with this wire So, we will wind two 300mm helical undulators and measure their performance in terms of quench, stability, and peak field

Alumina Coating 7 50µm Alumina plasma sprayed coating. This has been electrically tested to over 1000V without breaking down.

Heat treatment and vacuum impregnation tooling 8

1 st Milestone Undulator 9 Now fully fabricated, wound, impregnated and heat treated – ready for tests

10

11

12

13

14

Testing No suitable test cryostat at RAL LASA Milan (Giovanni Volpini) have kindly offered to carry out the tests of both undulators Thanks to Amalia/CERN and Frank/KIT for also trying to fit us in! 15

4.3mm diameter bore Arepoc Hall probe mounted on a carbon fibre rod Maximum diameter 4mm

Good interaction with LASA Drawings developed Interfaces all being considered 17

Schedule Undulator 1 ready for test now Undulator 2 ready for test by end December Both undulators should be tested at LASA by mid Feb Test one after the other ~3 days each Simple peak B field check with Hall probe and magnet performance as function of current 18

Summary We are still on target to achieve our goals by the end of M48 We have completed the first undulator, fully impregnated and heat treated Second undulator to follow shortly Tests will be carried out at LASA Milan 19

Acknowledgements Many thanks to our colleagues at LASA, CERN, KIT and others within HFM without whom we would not have been able to achieve our goals 20