Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.

Slides:



Advertisements
Similar presentations
How To Catch A Swarm Using Buckets. Take 2 plastic buckets and cut a large matching hole in the bottom of each. Using screen wire, preferably 1/8 hardware.
Advertisements

Gliding on Air: The Creation of a Hovercraft Megan Hodge Independent Study Fall Semester.
Fuel On Board Michael Dreher-Byrd - Robert Fulling - Melissa Davis - Matthew Plourde.
MU 7 Mak Fu Shun Kong Yau Choi Lee Man Kit Poon San On Zen YKK Project: Automatic adhesive machine.
Pneumo Kit Manufacturing Instructions for assembling the pneumatics workshop kits Questions? Contact Will Durfee, Version:
- Flexible Hoses- Ring Housing - Nitrogen Tank-Collection Cylinder - High Pressure Water Tank- Flow meter - Gas Regulator- Water Filter - Pressure.
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
DECEMBER 12 TH, 2013 P14311: Gate Review. Agenda Overview of PCB Isolation Routing System Design  20 minutes Review of Bill of Materials and Sourcing.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
Hydro-Electric Generator Manual Group number 403 Dan KJ Daewoo JT Group number 403 Dan KJ Daewoo JT.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Can Challenge- How we made the can and materials we used
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
RPI Storage Box with Removable Dividers Kaleigh Iler: Columbia HS & Nabihah Azhari: Troy HS.
May 21st, 2012 Component Environmental Test Chamber Team Members Advisors Peter AdamThong Vo Dr. Robert Daasch - PSU Jeff HughesPhong Ngo Justin Riel -
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Team Fuzzy Balls presents: The Ball Stinger Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Can Challenge Emily and Amina The Silver Demon. Materials.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
Solid State Morphing Aircraft Team Members: Roger Bounthisane Elaine Gumapas Amber Cook Thoai Nguyen Jeremiah Silvis James Bird MAE 435 April 3, 2014 Status.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Double Pinch Pot Box Ms. Asker-Chipman Ceramics 1A Project 4.
1 April 30, 2015 PXIE Fabrication Update Matt Hoff LBNL April 30, 2015 Daughter and Son to Work Day April 23, 2015 Ari and Kwin, my wife’s cousin’s kids.
Previous Week’s Goals Status Goal Status Narrow down materials through 98% Complete testing (all) Continue to learn Inventor In Process TestingIn Process.
Bonitron A\C Demand Scheduler Alex Brown Cory Haugh Ajmer Dwivedi.
A box of seeds weighs 0.9 pound. How many pounds would 6 boxes weigh?
Team A ECE 496: Gyrobot Michael Tan Trey Moran Rod Petak Rob Slater Quy Quan.
1 July 13, 2011 Some morning photos Tank Valve Box.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
MSD II Week 7 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant
A UTOMATED Design Team 8 -David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report # 8 April 14, 2010.
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
Computer Science I More 3D examples. Classwork/Homework: experiment and design, plan, complete your 3D project.
Prototype Review November 20, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Status Report #2 Zachary Luna Phillip Cox Dasola Alatise February 6th, 2012 A IR toilet adapter that allows the toilet to flush only when bathroom latch.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
Washer and Dryer Compatible Steamer By: Corey Frazier, Isaac Blackman, Adam Harbeson, and Jon Goley.
S A Griffiths CM42 June 2015 Electrical & Control.
First Wall Panel - Overview
Advisor: Dr. Shangchao Lin
WHY? HOW? Test Valve Measure Vibrations Contain Valves
TEAM 3-WEEK PLAN ASHLYNN COLE KENNETH YUAN RAVEN
CSU-1 Project Updates Mechanical:
Status of the cryogenic system for B180
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Measure Hose as 14”, 12.5”, 12.25”, 9” & cut it.
Project Design Updated: 9/25/2010.
Robert Karas and Frank McCloskey
Heart Pump and Circulatory System
Active Reciprocating Compressor Valve Assembly P16452
P16452 Active Reciprocating Compressor Valve Assembly
Presentation transcript:

Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud

Team Fuzzy Balls2 Prototype Review Completed Parts Parts in Progress Discuss design changes Discuss status of prototype build Next weeks deliverables

Team Fuzzy Balls3 Completed Parts Lid was cut to fit the opening of the polyethylene tank purchased from US Plastics McMaster-Carr was used to purchase the pressure switch, Schrader valve, and bleed valve. Holes were drilled into the lid of the container for the parts purchased from McMaster-Carr and the parts were attached. Seals were attached to the lip of the container.

Team Fuzzy Balls4 Parts in Progress The reinforcing of the walls is still being built. Thinking of using extra material from the lid to reinforce the walls or possible steel supports. Latches are still being researched for the prototype. New air compressor is being purchased and will be attached to the box.

Team Fuzzy Balls5 Design Modifications Looking at different wall thickness for the container to reduce the amount of bracing needed. Also looking at different materials needed to reduce the weight and the amount of bracing on the box.

Team Fuzzy Balls6 Prototype Status The reinforcing of the box is a key player in completing the prototype. Waiting to see how the box reacts under pressure before purchasing buckles for the lid.

Team Fuzzy Balls7 Project Pictures Complete lid in the machine shop

Team Fuzzy Balls8 Pictures Cont. Wiring the air compressor for the lid

Team Fuzzy Balls9 Pictures Cont. Inside of Compressor

Team Fuzzy Balls10 Pictures Cont. Applying the Seals

Team Fuzzy Balls11 Pictures Cont. Lid and Container assembly with out the air compressor

Team Fuzzy Balls12 Next Week Deliverables Complete any extra work on the prototype Create videos of working project Create the final presentation Finish the report Create a poster board display Update website and ftp the website to the ME4182 projects website

Team Fuzzy Balls13