Matthew Moulson for the LAV Working Group NA62 Photon Veto Working Group Meeting CERN, 09 June 2015 LAV preparations for restart.

Slides:



Advertisements
Similar presentations
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Advertisements

Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
Far Detector Data Quality Andy Blake Cambridge University.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
1 TPC online  offline calibration November 2002.
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Configuration Mapper Sonja Vrcic Socorro,
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
RunControl status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 14/10/2015.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
LAV status report for the NA62 LAV working group Preliminary test beam results Future activities Progress on simulation A. Antonelli INFN-LNF SPSC meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
LKr status R. Fantechi.
LAV front-end and readout status
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Vito Palladino Straw Working Group 23/3/2015
TDCB status Jacopo Pinzino, Stefano Venditti
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Presentation transcript:

Matthew Moulson for the LAV Working Group NA62 Photon Veto Working Group Meeting CERN, 09 June 2015 LAV preparations for restart

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 A12/New CHOD light shielding mm aluminium foils placed on front and back of A12 Light tightness & RF shielding for both A12 and NewCHOD A12 moved and replaced—survey confirms original position to ~1mm 5 May 2015

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 General notes on repair & maintenance 3 Repair work 27 Apr–08 May (Tania & Vincenzo) Complete HV scan, all LAVs Complete scan of all known bad channels Detailed signal diagnostics for LAVs A1/A5 All problems resolved (or addressed) in principle New, comprehensive scan of bad channels needed

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 Work on racks to be done 4 Dust abatement: A4-A5 racks need to be reorganized All racks need to be vacuumed General organization: Cables need to be adjusted for LAVs 3-8 Cable trays need to be adjusted for LAVs 6-8 A7 needs to be straightened

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 HV status 5 Repair work 27 Apr–08 May (Tania & Vincenzo): All known HV problems repaired Replaced 3 cables and 1 HV board Found 1 channel with HV probably too low 5 new cables produced in Apr: 2 spares remaining General test of HV system – in principle no problems remaining DCS status for HV: LAV crates now on NA62 private network GECO can only be used via Windows gateway or cerntsna62 MM got expert training and access from Valeri & Piotr Piotr created new expert tool for loading of HV recipes from files Ready to generate and upload definitive HV map HV interlock status: Pumping will be started today DSS interlock enabled – do not override! If DSS needs to be temporarily disabled, use INHIBIT function

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 FEE/signal status 6 Diagnostic & repair work 27 Apr–08 May (Tania & Vincenzo): Completed oscilloscope scan of known bad signal channels In principle, no bad channels inside vacuum Detailed diagnostics for LAVs A1-A5 4 TDCBs with connector problems sent to Pisa 3 with connector problems (dead ch 16) + 1 with noise (2 chs) Pisa unable to reproduce problems in lab – boards returned Connectors dressed with kapton tape and boards reinstalled 3 FEE boards changed Subsequent lab diagnostics showed no problems Need new, comprehensive survey of bad channels DAQ now running regularly – can attempt bulk scan using pulsers and online monitor E.g. pulse DAQ at 10 kHz, FEE at 2 khZ – 600 cts/ch in 1 hr TEL62 for LAV10 replaced DIP switches for JTAG chain need to be set

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 New system for threshold control 7 Components: Run control (RC) interface Sends “set threshold” command to LAVDCS via DIM Obtains threshold and board status information posted continuously on DIM and records in database LAVDCS Demon running on Raspberry Pis Receives command over DIM to set thresholds from RC and executes LAVFEE-comm Runs LAVFEE-comm at SoB/EoB and posts thresholds to DIM LAVFEE-comm Script running on Raspberry Pis to handle serial communications with FEE boards

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 New system for threshold control 8 RC interface status: Nicolas & Francesco have a prototype RC interface Displays individual thresholds for each board Database will record individual thresholds for each board At the moment, the set threshold command transmits only 2 threshold values to entire system (low, high thresholds) LAVDCS status: Commands:Set_threshold, 1 per station, board Services:Board_ID, 1 per station, board Threshold[ch], 1 per station, board, channel ADC[ch], 1 per station, board, channel Updated, 1 per station, board Need to implement services for transmssion of individual channel thresholds if we decide we want to transmit a map Need to check functionality of Updated service as test of validity of information on DIM

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 New system for threshold control 9 LAVFEE-comm, Raspberry Pi & FEE status LAVFEE-comm substantially rewritten to improve robustness, decrease latency Streamlined output for easy parsing & posting on DIM Blocking/unblocking on SoB/EoB No serial operations during spill Standardized routines for serial communications Standardized diagnostics and robust error-recovery procedures FEE “firmware” modifications: Remove spurious characters during communcation Change command parsing so only fully-spelled, unambiguous commands are executed Uploaded FW into 81 boards Reconfigured Raspbery Pi infrastructure Installed 5 new Raspberry Pi 2Bs for LAVs 1-5 Elimination of all USB hubs – all boards are now connected directly to a Pi

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 Online monitor 10 Online monitor is under revision List of new tabs & histograms defined Extensive details on NA62 Twiki Time windows Hardware occupancy (untriggered) Out-of-time occupancy (digi hits, reconstructed hits) Raw muon efficiencies (digi hits, reconstructed hits) Low-threshold fraction Anomalous hit-type fraction Until now, have focused on readiness of LAV HW ready, but now need to put emphasis on online monitor

LAV preparations for restart – M. Moulson (Frascati/CERN) – Photon Veto WG – CERN – 09 June 2015 Status of NIM paper 11 Starting from incomplete draft of standalone NIM paper on LAV, reorganized introductory material to interface with general NA62 NIM paper Status of sections: General system description: Fairly complete Construction: Fairly complete Front-end electronics: Fairly complete draft, needs review and update Primitives: Being rewritten by Francesco Test-beam performance: Needs review, perhaps some material to be eliminated Reconstruction and simulation: To be done Performance in 2014: To be done Current length: 11 pages in elsart.cls double column LaTeX