1 System planning 2013 Lecture L9: Short term planning of thermal systems Chapter 5.3.1-5.3.3 Contents: –General about thermal power –Production cost –Start.

Slides:



Advertisements
Similar presentations
10 OUTPUT AND COSTS CHAPTER.
Advertisements

Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Chapter Nineteen Profit-Maximization.
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
1 Chapter 6 Practice Quiz Tutorial Production Costs ©2004 South-Western.
TYPES OF MECHANICAL SYSTEMS
Introduction to Algorithms
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Optimization of thermal processes2007/2008 Optimization of thermal processes Maciej Marek Czestochowa University of Technology Institute of Thermal Machinery.
Optimization of thermal processes2007/2008 Optimization of thermal processes Maciej Marek Czestochowa University of Technology Institute of Thermal Machinery.
Dynamic Behavior Chapter 5 In analyzing process dynamic and process control systems, it is important to know how the process responds to changes in the.
Dynamic Behavior Chapter 5
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
9 CHAPTER Vapor and Combined Power Cycles.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
National Institute of Science & Technology TECHNICAL SEMINAR-2004 Dipanwita Dash [1] UNIT COMMITMENT Under the guidance of Mr. Debasisha Jena Presented.
4.5 Optimization Problems Steps in solving Optimization Problems 1.Understand the Problem Ask yourself: What is unknown? What are the given quantities?
10 Output and Costs Notes and teaching tips: 4, 7, 23, 27, 31, and 54.
I/O Curve The IO curve plots fuel input (in MBtu/hr) versus net MW output.
EE 369 POWER SYSTEM ANALYSIS
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
POWER GENERATION TECHNOLOGIES
Thermal_Power_Plant_2 Prepared by: NMG
Today Electric Power Lecture Carbon Trading Game Assignment 2 posted Thursday Electric Power Distribution and Storage Lecture Homework 3 (Conservation)
Department of Mechanical Engineering ME 322 – Mechanical Engineering Thermodynamics Lecture 27 Gas Power Generation The Brayton Cycle.
EGR 334 Thermodynamics Chapter 9: Sections 5-6
Non-Linear Simultaneous Equations
EE 369 POWER SYSTEM ANALYSIS
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
Least Cost System Operation: Economic Dispatch 1
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
1 Dynamic Behavior Chapter 5 In analyzing process dynamic and process control systems, it is important to know how the process responds to changes in the.
1 System planning 2013 Lecture L8: Short term planning of hydro systems Chapter Contents: –General about short term planning –General about hydropower.
Lecture slides by Mehmet Kanoglu
Types of IP Models All-integer linear programs Mixed integer linear programs (MILP) Binary integer linear programs, mixed or all integer: some or all of.
A Vapor Power Cycle Boiler T Turbine Compressor (pump) Heat exchanger
Price-Based Unit Commitment. PBUC FORMULATION  maximize the profit.
Thermodynamic Cycles for CI engines
Important Terms & Notes Conceptual Physics Mar. 13, 2014.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is Thursday October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable.
1 5.7 Initialization Revisited  :  Motivation: a solution for the transformed system is feasible for the original system if and only if all the. a solution.
The Thermodynamic Cycle. Heat engines and refrigerators operate on thermodynamic cycles where a gas is carried from an initial state through a number.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
ECE 476 Power System Analysis Lecture 15: Power Flow Sensitivities, Economic Dispatch Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
OUTPUT AND COSTS 10 CHAPTER. Objectives After studying this chapter, you will able to  Distinguish between the short run and the long run  Explain the.
Cost and Production Review. Given the following quantity data, please compute the short-run marginal and average products and costs if labor is $10 per.
Cost Impacts of Cycling Coal-Fired Power Plants
Intelligent Boiler Sequencing
OR Chapter 8. General LP Problems Converting other forms to general LP problem : min c’x  - max (-c)’x   = by adding a nonnegative slack variable.
MME 2009 Metallurgical Thermodynamics
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
The Bases of Energy: forms, units and efficiency
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
Mon. Apr. 20 – Physics Lecture #39 Heat Engines and the Second Law of Thermodynamics 1. Lab 32: It’s Getting Hot In Here – Heat Engine Demos 2. Energy,
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
Chapter 8 - Project Management1 Lecture 2 Today’s lecture covers the followings: 1.To study “project crashing” concept 2.LP formulation for project management.
ClearFire-LC Hydronic Boiler Solution. ClearFire Family Capacities from 400 to 12,000 MBH 2 ClearFire-H - Steam ClearFire-C - Condensing ClearFire-V -
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
Chapter 20 Lecture 35: Entropy and the Second Law of Thermodynamics HW13 (problems):19.3, 19.10, 19.44, 19.75, 20.5, 20.18, 20.28,
Tuesday, March 19 The Network Simplex Method for Solving the Minimum Cost Flow Problem Handouts: Lecture Notes Warning: there is a lot to the network.
World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application.
Announcements Please read Chapter 7 HW 6 is due today
ME 312 PPE POWER SYSTEM ANALYSIS
Chapter 8 - Project Management
Chapter 5: Production and Cost
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
9 CHAPTER Vapor and Combined Power Cycles.
Dynamic Behavior Chapter 5
Presentation transcript:

1 System planning 2013 Lecture L9: Short term planning of thermal systems Chapter Contents: –General about thermal power –Production cost –Start up costs –Minimum up and down times –Limited generation changes

2 General about thermal power Generates power by combustion of fuel: –Oil/petroleum –Gas –Coal –Uranium Large thermal plants uses the steam cycle when generating power.

3 General about thermal power

4 What do we want? Want to optimize the operation of our thermal stations. Want to use linear equations. Want to model the characteristics of the thermal stations.

5 Production cost Depends on the amount of fuel that is used The efficiency is not constant, varies with the amounts of fuel that is used. The fuel input: F(G) = fuel input [ton/h or m 3 /h] G = power production [MWh/h] h = heat contents [MWh/ton or MWh/m 3 ]  (G) = efficiency at production G [%]

6 Production cost Let  denote the fuel price. Production cost: Nonlinear cost function. Often approximated by: Here approximated by:

7 Operation limitations Changes in fuel input do not immediately result in changes in power production (large plants)  Operation limitations: –Start up times and costs –Minimum operation time and stop time –Limited generation changes Need to consider binary variable to state the operation status for station g during hour t:

8 Start up costs If the thermal power plant is in operation a specific hour, the generation is limited by the installed capacity. If not in operation, the upper limit is zero: = Generation, plant g, hour t = Operation status, plant g, hour t = Maximum production, plant g If in operation, there can also exist a lower generation limit (keep the plant going): = Minimum production, plant g

9 Start up costs Starting up a thermal power plant cost fuel to heat up the plant to operational temperature. Dependent on how long time the plant has been shut off. = cost for starting after t hour stop = cost for starting a cold plant = cooling time constant = fixed startup cost

10 Start up costs If the plant only will be off-line for a short period of time, beneficial to not stop the combustion in the boiler. Reduce it to minimum and do not produce power (banking) = cost per hour for banking

11 Start up costs To include start up costs in the objective of an optimization problem, binary variables must be included. Should be 1 the hour the plant is started, and 0 otherwise. The start up costs depends on the time the plant has been switched off  separate variables for the different times. Here: Only look at off-line time one hour and two hours or more: = start after one hour stop for plant g during hour t = start after at least two hour stop for plant g during hour t

12 Start up costs The total start up cost during the planning period: = start up cost for plant g after one hour stop = start up cost for plant g after at least two hour stop

13 Start up costs Since the start up will cause costs, the optmization will try to set the start up variables to zero. Thus, must add constriants to make sure they take the correct values.

14 Start up costs

15 Start up costs

16 Minimal up and down times Constant start up costs often used. Introduce requirements of the down times of a decommited unit and up times for a commited unit. = start up variable for plant g during hour t (1 if the plant is started before t, 0 otherwise) = stop variable for plant g during hour t (1 if the plant is stopped before t, 0 otherwise)

17 Minimal up and down times The total start and stop cost: = start up cost for plant g = stop cost for plant g Must couple the operation status variables and the start up and stop variables:

18 Minimal up and down times The requirements for minimal up and down times can be formulated as: = minimal up time for plant g = minimal down time for plant g

19 Limited generation changes Cannot change production at any rate. Must include ramping constraints that limits the generation increase/decrease between hours. Introduce the maximum generation increase and decrease: Consider increase: The first hour after that the plant has been started, the increase can be larger than the maximum increase. Maximum generation the first hour after start:

20 Limited generation changes Decrease ramping constraints: Increase ramping constraints:

21 Limited generation changes

22 Planning problem Short term thermal power planning problem: maximizeincome during period - production costs during period regarding minimal up/down times ramp rates legal agreements physical limitations

23 PROBLEM 15 - Symbols for Short-term Thermal Power Planning Problems

24 PROBLEM 15 - Symbols for Short-term Thermal Power Planning Problems

25 PROBLEM 16 - Total Operation Cost

26 PROBLEM 17 - Unit Commitment