LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D 2.4.1.2 D.R. Dietderich LBNL.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Qualification Plans for new Insulation Sources Daniel Dietderich.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Lessons learnt from CERN experience
MQXF cable with RRP wires for Q2
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
CERN Conductor and Cable Development for the 11T Dipole
Mechanical stability and QXF coil winding
To be presented at Nb3Al R&D Review,
Cable and Strand test facility
MQXF cable with RRP wires for Q2
MQXF updates P. Ferracin October 9th, 2014.
Presentation transcript:

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Outline Status of cables for LARP – TQ –LR and SQ Critical current testing cables – At NHMFL with transverse pressure Loading at LHe temperatures – At CERN in the FRESCA facility (G. Ambrosio on Friday) Loading at room temperature

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Cable Fabrication

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich TQ Cable Parameters

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Minor Edge of 3 TQ Cables 928R 939R 940R Large edge facets on cable 939R

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Minor Edge of 939R & 940R 939R -- The two strand just in from the edge of the cable have at least 5 sheared sub-elements 940R -- The two strand just in from the edge of the cable are OK

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Cable Observations All three cables are in specification of thickness, width, and keystone angle Cable 939R –Has a very large facet on minor edge and sheared sub-elements –Two facets on major edge Cable 940R –Facets on major and minor edge are consistent with other TQ cables such as 928R.

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Why are the cables different? Its not clear why cables 939R and 940R are different –Different strand Ic at 12T of strand: 8220 (939R) is higher than 8647 (940R) –This suggest sub-elements with different composition »8220 may have more Sn Pitch Length different: 40mm vs. 14mm. –Anneal prior to re-rolling of cable may have been different Cable 939R was double the mass of 940R

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich New Procedures and Documention – Draft First cable pass – Stop after 3-5m Evaluate facets on edge of cable and cable parameters from CMM Mount sample for metallography and inspect sub-elements Place cable sample in achieves – Make necessary adjustments to Turks head and proceed with run Annealing of cable – Annealing conditions C for 2 h The annealing box will be purged with 40 cf of Argon prior to the anneal A thermocouple will be placed into the cable stack on the take-up spool to monitor cable temperature Second cable pass – Install 2 nd set of rolls 50 microns wider than those used in the first pass –Stop after 3-5m Evaluate facets on edge of cable and cable parameters from CMM Mount sample for metallography and inspect sub-elements – Make necessary adjustments to Turks head and proceed with run Samples – Take a sample for metallography – Ship 2.5m of cable to BNL and FNAL. – Evaluate cable If qualified then insulate and ship to Lab winding coils

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Developing Integrated Note to Become Traveler Will combine the following – Cover page will be the typical LBNL cable document –Cable specifications and requirements – Confirmation of inventory in strand map – Re-spooling procedure and re-spooling map –Cable run check list – Cable evaluation procedures before starting run – Heat treatment profile for the cable anneal –

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Possible Strand for TQ1a Conductor needed: 25kg minimum Jc (12T, 4.2K): 2,000-3,000A/mm 2 RRR: >50 Stability Current I s (4.2K): >650A Strand /91 stack

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Prototype TQ Cable with 90 Sub-elements Cable fabricate TQ style cable with Oxford RRP with with 90 sub-elements

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Sub-Scale Cable Parameters ItemValue Tolerance Number of strands20 NA Strand Diameter0.7 mm +/ mm Thickness1.276 mm +/ mm Width7.793 mm +/ mm Pitch Length54.0 mm +/- 3.0 mm

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Sub-Scale Cable Cable is rectangular and narrow Easy to make mechanically stable for magnet winding. Light deformation of strands at the edge Low risk of damaging strand

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich SM-01 Magnet Performance Cable 809 Strand ORe 143c Coils SC-01 and 02 RRR Coils very stable Achieved short sample

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Edge of Cable 926R for SQ-02 and Cable 935R for SR R MJR 935R MJR

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Stability Current (I s ) for Strand 8220 – Sub-scale and TQ type cables BNL & FNAL Data XS - Sub-Scale Cable Virgin Magnet Limit

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Critical Current (I c ) for Strand 8220 – Sub-scale and TQ type cables BNL & FNAL Data

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Performance of Cable 935R in Transformer Test Sub-scale cable 935R strand 8220 Data Normalized to Number of Strands FNAL Data

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Strand Data for LR cables – Billets 8647 and 8648 RRR 200 BNL data Cable 942R

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LR Cable Production Cu dummy cable fabricated week of 4/3/2006 –Has been annealed –Needs to be re-rolled Production Runs: –First UL of Nb 3 Sn (billet 8647) cable fabricated week of 4/17/2006 Annealing and re-rolled week of 4/24/2006 –Second UL of Nb 3 Sn (billet 8648) cable will be fabricated in May 2006

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Cable Testing

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Performance of Cable 935R in Transformer Tests Sub-scale cable 935R strand 8220 Data Normalized to Number of Strands FNAL Data

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Transverse Pressure Measurements Single superconducting strand in a cable made of Cu wire Correlate to prototype magnet performance to determine if stress limiting Need to measure more cables under transverse pressure E. Barzi, FNAL

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Cross-Section of Samples NHMFL U. Twente Cable

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Sample and Magnet Orientation for Tests NHMFL Two Nb 3 Sn cables in 304 SS holder in radial access port Split pair solenoid

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich NHMFL Loading Piston and Bellows

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Loading Fixture in Magnet at NHMFL and Sample

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Sensitivity of Cable to Transverse Stress 11 T LBL Cable # 523 MJR-TWCA LBL Cable # 522 IGC-Int. Tin D-20 HD-1 RRP-Oxford NHMFL Test 150mm uniform field 122mm load length MJR recover Ic when unloaded Less Cu more Nb 3 Sn in subelement Nb 3 Sn filaments sinter together Stress Issue? B  Nb 3 Sn Cable + 

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Difference In Testing Facilities Twente Single U-shaped Cable – Current redistribution Load length only 40 mm – 90 mm cable pitch Difficult to guarantee uniform loading Regions outside of loading area may not be constrained Nb-Ti leads soldered directly to Nb 3 Sn Voltage taps soldered to individual strands NHMFL Two straight cables Load length 122 mm – 90 mm cable pitch Uniform loading due to beam configuration Sample constrained on all sides Solder box method developed for D20 Cu-Sn alloy foil developed for LBNL magnets

LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich Summary  LR cable production  Cu dummy cable and NbTi leader material have been made  First UL is being evaluated  Second UL will be fabricated by the middle of June 2006  TQC-02 cable production  6 UL have been fabricated  4 UL did not pass evaluation  Therefore a new cable must be fabricated by the middle of June 2006  Cabling of strand with larger number of sub-elements is feasible  Still need to explore fabrication limits of cables with different keystone angles and widths  Transverse stress on cables: Need to perform full size cable tests to complement the strand tests now being performed